This is Amendment #1 to a federal solicitation (140P8126Q0020) issued by the National Park Service (NPS) for Lake Mead wet well relining work. The amendment addresses five vendor questions with clarifications regarding project specifications and does not extend the original proposal closing date, which remains April 28, 2026. The period of performance runs from July 1, 2026 through December 28, 2026.
The amendment provides technical clarifications for three lift stations requiring wet well relining: Katherine Landing Main (105-inch diameter, 180-inch depth), Katherine Landing Back Bay (80-inch diameter, 126-inch depth), and Temple Bar (75-inch diameter, 213-inch depth). Historic maximum sewage flow rates are 15,129 gallons per day for Katherine Main, 7,000 gallons per day for Temple Bar, and 1,700 gallons per day for Katherine Landing Back Bay. Surface preparation must comply with ICRI Technical Guidelines No. 03732, with 200 mils dry film thickness per coat and additional coats applied as needed. For Temple Bar, the exact square footage of failing fiberglass liner requiring removal is unknown, but operators can visually assess the failing liner from the top hatch; no prior inspection reports are available. Contractors must provide all temporary bypass piping with the ability to tie into the force main within a 100-foot radius at all locations, as no existing tie-in points are available on the force main.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Bradley Metler
See continuation page
NPS, PWR - LAKE MABO
601 Nevada Way Boulder City NV 89005-2426
PPL
140P8126Q0020
04/28/2026
04/28/2026
1 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P8126Q0020/0001
Amendment #1 addresses vendor questions. No extension to the closing date.
Period of Performance: 07/01/2026 to
12/28/2026
140P8126Q0020 LAKE MEAD WET WELL RELINING
AMENDMENT #1 4-29-26
Amendment #1 addresses vendor questions. Answers are in ORANGE, below.
Q1. WET WELL DIMENSIONS AND SURFACE AREA
Please provide the interior dimensions (diameter or length x width, and depth) and total surface area to be coated for each of the three wet wells (Temple Bar, Katherine Landing Main, and Katherine Landing Back Bay).
A1: KL Main LS has a diameter of 105 inches with a depth of 180 inches, Back bay dia. 80" and depth of 126", Temple Bar dia. 75", depth of 213"
Q2. SEWAGE FLOW RATES FOR BYPASS PUMPING
Can NPS provide expected average and peak sewage flow rates (gpm) for each of the three lift stations so that bypass pumping equipment can be sized appropriately?
A2: Historic flow rate maximums for Temple Bar= 7,000 gpd, Katherine Main= 15,129 gpd, KL Back bay= 1,700 gpd
Q3. TEMPLE BAR LINER REMOVAL AND SUBSTRATE CONDITION
For the Temple Bar wet well, can NPS provide the approximate square footage of failing fiberglass liner that must be removed, along with the estimated condition and depth of any spalling or structural damage to the underlying concrete substrate? Has any prior condition assessment, inspection report, or as-built drawing been completed that can be shared with offerors?
A3: Unknown, Operators can see the failing liner from the hatch on top of the wet well. No further inspection has been conducted.
Q4. SURFACE PREPARATION STANDARD AND COATING THICKNESS
What is the required minimum dry film thickness (DFT) for the protective coating, and is surface preparation specified to a particular NACE or SSPC standard (e.g., SSPC-SP 6, SSPC-SP 10) with a defined blast profile?
A4: Surface must be cleaned of all grease , oil, rust, scale and other contaminants in accordance with ICRI Technical Guidelines No. 03732. 200 mils thickness per coat, additional coats may be needed in certain instances.
140P8126Q0020 LAKE MEAD WET WELL RELINING
AMENDMENT #1 4-29-26
Q5. BYPASS ROUTING DISTANCE AND DISCHARGE TIE-IN POINTS
What is the approximate distance and elevation change for the bypass routing (Back Bay to Main at Katherine Landing, and Main lift to the sewage lagoons via force main at both sites)? Are there existing force main connection points or manholes that the contractor can tie into for bypass discharge, or must the contractor provide all temporary piping?
A5: No existing tie in points on force main. Depending on tech approach to project the distances can vary. The force main should be able to be tied in to within a 100' radius at all locations.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .