Amd_6_Atch_1_-_Hacienda_Electrical_CD_12-02-19_0006.pdf
PDF 11 MB Posted
- Attached to
- SCOTTY'S CASTLE TELECOM & ALARMS - DEVA Federal contract opportunity
- Solicitation number
- 140P8125B0012
About this file
These documents are electrical design and documentation drawings for the Death Valley National Park Scotty's Castle Hacienda renovation project. The set includes multiple electrical plans and schedules covering site electrical layout, floor plans, lighting configurations, power distribution, and technical system details across different building levels. Key technical specifications include electrical panel schedules (Panels B, R1, R2, H2), residential demand calculations, luminaire schedules, and single-line power diagrams. The drawings provide comprehensive electrical infrastructure details for the facility, including low voltage systems, ground rod installations, telecom outlet configurations, and security system line diagrams. The documents are marked as "Revised 100% Final Construction Documents" dated 12/02/2019, indicating they represent the final design iteration for electrical systems at the Hacienda site.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8125B0012_Amd_0008.pdf | ||
| Sol_140P8125B0012_Amd_0007.pdf | ||
| Sol_140P8125B0012_Amd_0006.pdf | ||
| Sol_140P8125B0012_Amd_0005.pdf | ||
| Amd_5_Atch_2_-_Drawings_8_19_25_0005.pdf | ||
| Amd_5_Atch_1_-_Questions___Answers_8_19_25_0005.pdf | ||
| Sol_140P8125B0012_Amd_0004.pdf | ||
| Sol_140P8125B0012_Amd_0003.pdf | ||
| B09_Amd_2_Atch_1_-_Site_Visit_Sign-in_Sheet_0002.pdf | ||
| Sol_140P8125B0012_Amd_0002.pdf | ||
| Sol_140P8125B0012_Amd_0001.pdf | ||
| B09_Amd_1_Atch_1_-_Drawings_0001.pdf | ||
| B08_Atch_3_-_Wage_Determination_CA20250020_-_Inyo_County__CA.pdf | ||
| Sol_140P8125B0012.pdf | ||
| B08_Atch_6_-_Proj_Mgt_Software_and_Electronic_Payrolls_Requirement.pdf | ||
| B08_Atch_1_-_Specifications_07_01_25_pdf.pdf | ||
| B08_Atch_4_-_Limitation_on_Subcontracting_Report_Template.xlsx | XLSX spreadsheet | |
| B08_Atch_5_-_Construction_Contraction_Administration.pdf | ||
| B08_Atch_2_-_Schedule_of_Values_Template.xlsx | XLSX spreadsheet |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RE
DN
ARBNELOCJ
RETEI P
SCALE
DN
LA1
LA1
LA1
LA1
LA2
LA1
LB1
LC1
LC1
LC1LC1
LC1
LC4
LC1
LC1LC1
LC1 LC1
LD1
LD1
LC4
LC1
LC1 LC1 LC4
LC4 LC1 LC1
LC4
RE
DN
LB1
DN
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E10 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E20 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E30 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E31 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E40 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E51 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E61 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E62 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E63 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E71 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E81 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
| _E82 ARG-NPS_DV HACIENDA-217102-22x34-NPS-ARG.pdf |
| Sheets and Views |
| 22x34-NPS-ARG |
| PALL |
| DPLOT |
File details come from the government source that posted it. Updated .