This document is a set of schematic drawings and general notes for an HVAC system replacement project at Bent's Old Fort National Historic Site in La Junta, Colorado (Project 319203).
The project's general aim is to replace existing HVAC systems with complete and functional replacement systems across multiple buildings on the site. The work includes modifications to the Administrative Building (S2), Curatorial Building (S3), and associated equipment replacements. For the Administrative Building, specific equipment to be replaced includes multiple furnace units (FU-1A, FU-2A, FU-3A) paired with air conditioning units (CU-1A, CU-2A), thermostats, and refrigerant piping. The Curatorial Building requires replacement of packaged air conditioning units and thermostat upgrades. All new equipment must be installed in accordance with manufacturer requirements and remain fully accessible for maintenance. The contractor is responsible for field verification of existing conditions, coordination of any modifications to existing services, ensuring buildings remain weather-tight throughout the project, protecting existing structures from damage, and making necessary temporary provisions as required. The contractor must utilize existing building fabric penetrations where possible and submit requests for information to the government for approval of any new penetrations required. All existing ductwork is to remain except where modifications are necessary, and the contractor must provide all required ductwork modifications and transitions at no additional cost to the government.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6426Q0119_Amd_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Sol_140P6426Q0119.pdf | ||
| Statement_of_Work_-_Attachment_C_(Org_Const_Drawings).pdf | ||
| DOL_Wage_Determination.pdf | ||
| Statement_of_Work_-_Attachment_B_(Pictures).pdf | ||
| Statement_of_Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE MAP
NOT TO SCALE
MAINTENANCE
SHOP
MAINTENANCE
YARD
PARKING
SITE MAP
S1
ADMIN BUILDING
GENERAL NOTES:
1. THE GENERAL AIM OF THIS PROJECT IS TO REPLACE EXISTING HVAC SYSTEMS
WITH COMPLETE AND FUNCTIONAL REPLACEMENT SYSTEMS. THE CONTRACTOR
SHALL PROVIDE ALL WORK, INCLUDING INCIDENTAL REQUIREMENTS, TO ACHIEVE
THIS PROJECT AIM. REFER TO PROJECT SCOPE OF WORK OR SPECIFICATIONS
FOR ADDITIONAL DETAILS.
2. THE LOCATION AND ROUTING OF EXISTING AND PROPOSED EQUIPMENT
SHOWN IN THESE SKETCHES ARE INDICATIVE ONLY. NOT ALL EXISTING SERVICES
ARE SHOWN AND MAY NOT REPRESENT AS-BUILT CONDITIONS. THE CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING CONDITIONS.
3. THESE SKETCHES ARE SCHEMATIC IN NATURE AND ILLUSTRATE THE GENERAL
ARRANGEMENT OF PROPOSED NEW SERVICES AND EQUIPMENT. THESE
SKETCHES ARE NOT TO SCALE. THE CONTRACTOR SHALL FIELD VERIFY SPATIAL
REQUIREMENTS AND SERVICES ROUTING BASED ON EXISTING CONDITIONS AND
SHALL MAKE NECESSARY ADJUSTMENTS IN EQUIPMENT PLACEMENT AND
CONNCECTION IN ORDER TO ACCOMMODATE EXISTING CONDITIONS AT NO
ADDITIONAL COST TO THE GOVERNMENT.
4. NOT ALL EXISTING SERVICES TO BE MODIFIED OR RELOCATED ARE SHOWN IN
THESE SKETCHES. THE CONTRACTOR SHALL COORDINATE MODIFICATION,
TEMPORARY DEMOLITION AND RE-INSTATEMENT, OR RELOCATION OF THESE
SERVICES AS REQUIRED TO ACHIEVE THE GENERAL AIM OF THIS PROJECT AT NO
ADDITIONAL COST TO THE GOVERNMENT.
5. ALL EXISTING BUILDINGS SHALL REMAIN WEATHER-TIGHT THROUGHOUT THE
PROJECT. THE CONTRACTOR SHALL MAKE ANY NECESSARY TEMPORARY
PROVISIONS TO ACHEIVE THIS REQUIREMENT.
6. ALL NEW SERVICES AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE
WITH MANUFACTURER'S REQUIREMENTS AND BE FULLY ACCESSIBLE FOR
MAINTENANCE.
7. THE CONTRACTOR SHALL UTILIZE EXISTING BUILDING FABRIC PENETRATIONS.
ANY REQUIREMENT FOR NEW FABRIC PENETRATIONS SHALL BE SUBMITTED FOR
REVIEW AND APPROVAL BY THE GOVERNMENT VIA REQUEST FOR INFORMATION
PRIOR TO WORK TAKING PLACE ON SITE.
8. IN GENERAL, ALL EXISTING DUCTWORK SHALL REMAIN, EXCEPT WHERE
MODIFICATIONS ARE REQUIRED. THE CONTRACTOR SHALL PROVIDE ALL
NECESSARY DUCTWORK MODIFICAITONS AND TRANSITIONS TO CONNECT TO
EXISTING AS NOTED AND AS REQUIRED TO ACHIEVE THE AIM OF THIS PROJECT.
9. CARE MUST BE TAKEN TO ENSURE NO DAMAGE OCCURS TO EXISTING
STRUCTURES, WINDOWS, ELEMENTS, INTERIOR CEILINGS, WALLS, ETC.
CONTRACTOR MUST PROVIDE ADEQUATE PROTECTION TO PREVENT ANY
DAMAGE.
319203
1 305/2026
BRD
STAGING
CURATORIAL
BUILDING
ADMINISTRATIVE
BUILDINGS2
ADMINISTRATIVE BUILDING
NOT TO SCALE
T
EXISTING EQUIPMENT SCHEDULE:
FU-1A: CARRIER MODEL 58MCA060--16, PAIRED WITH CU-1A. 60 MBH INPUT, 1600 CFM NOMINAL.
FU-2A: CARRIER MODEL 58MCA080--20, PAIRED WITH CU-2A. TWINNED WITH FU-3A. 80 MBH INPUT, 2000 CFM
NOMINAL.
FU-3A: CARRIER MODEL 58MCA080--20, PAIRED WITH CU-2A. TWINNED WITH FU-2A. 80 MBH INPUT, 2000 CFM
NOMINAL.
CU-1A: CARRIER MODEL 38TZA042---331. PAIRED WITH FU-1A. 3.5 TON NOMINAL CAPACITY, R-410A REFRIGERANT.
208/230V-1P, 24.4 MCA, 40A MOCP (50A2P BREAKER EXISTING).
CU-2A: CARRIER MODEL 38ARZ-008---501. PAIRED WITH FU-2A/3A . 7.5 TON NOMINAL CAPACITY, SINGLE CIRCUIT.
R22 REFRIGERANT. 208/230V-3P, 35 MCA, 60A MOCP (70A3P BREAKER EXISTING).
*THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ALL PROVIDED INFORMATION IN THE FIELD.
PROPOSED EQUIPMENT SCHEDULE:
FU-1A: CARRIER MODEL 59SC2A060S17--14, PAIRED WITH CU-1A (3.5-TON A/C). 60 MBH INPUT, 92% AFUE, 1400 CFM NOMINAL AIRFLOW. 115V-1P, 11.5 MCA, 15A MOCP. PROVIDE CONDENSATE NEUTRALIZER & EXTERNAL TRAP AND GAS CONVERSION ACCESSORIES AS REQUIRED. EQUIPMENT TO INCLUDE MANUFACTURER'S REFRIGERANT
DETECTION SYSTEM AS REQUIRED.
FU-2A: CARRIER MODEL 59SC2A080S21--20, PAIRED WITH NEW CU-2A (7.5 TON A/C) AND TWINNED WITH FU-3A. 80 MBH INPUT, 92% AFUE, 2000 CFM NOMINAL AIRFLOW. 115V-1P, 19.1 MCA, 20A MOCP. PROVIDE CONDENSATE NEUTRALIZER & EXTERNAL TRAP, TWINNING KIT, AND GAS CONVERSION ACCESSORIES AS REQUIRED.
EQUIPMENT TO INCLUDE MANUFACTURER'S REFRIGERANT DETECTION SYSTEM AS REQUIRED.
FU-3A: SAME AS FU-2A. TWINNED WITH FU-2A.
CU-1A: CARRIER MODEL 26SCA542. PAIRED WITH NEW FURNACE FU-1A WITH NEW EVAPORATOR COIL PER EQUIPMENT MANUFACTURER. 3.5 TON NOMINAL CAPACITY, SINGLE STAGE, 14.3 SEER2, 208/230V-1-60, 22.7 MCA, 35A MOCP. R-454B REFRIGERANT WITH 7.2LB FACTORY CHARGE. PROVIDE WITH START ASSIST KIT, CYCLE PROTECTOR, AND CRANKCASE HEATER. INTEGRATES WITH INDOOR UNIT FOR A2L LEAK DETECTION SYSTEM
SHUT-DOWN. NEW REFRIGERANT LINESET PIPING SIZED PER EQUIPMENT MANUFACTURER.
CU-2A: CARRIER MODEL 38AXZM08A0-5. PAIRED WITH NEW TWINNED FURNACES FU-2A & FU-3A WITH SINGLE NEW EVAPORATOR COIL; COIL SELECTION PER EQUIPMENT MANUFACTURER. 11.2 EER, 7.5-TON NOMINAL CAPACITY, 2-STAGE COOLING. 208/230V-3-60, 37 MCA, 60A MOCP. R-454B REFRIGERANT WITH 9.0LB FACTORY CHARGE. PROVIDE WITH LOUVERED HAIL GUARDS. INTEGRATES WITH INDOOR UNIT FOR A2L LEAK DETECTION SYSTEM SHUT-DOWN. NEW REFRIGERANT LINESET PIPING SIZED PER EQUIPMENT MANUFACTURER.
*PROPOSED EQUIPMENT IS BASIS OF DESIGN ONLY. APPROVED EQUIVALENTS MEETING SALIENT
CHARACTERISTICS MAY BE PROPOSED WITH NPS APPROVAL.
KEYED NOTED:
EXISTING UPFLOW FURNACE UNIT TO BE REPLACED IN-KIND INCLUDING EVAPORATOR COIL PAIRED WITH NEW OUTDOOR A/C UNIT (CU-1A). REUSE AND RECONNECT TO EXISTING ELECTRICAL. REUSE AND MODIFY EXISTING DUCTWORK IN SAME CONFIGURATION AS REQUIRED FOR NEW EQUIPMENT. RECONNECT TO EXISTING CONDENSATE DRAINAGE. RECONNECT EXISTING PVC VENTING TO NEW UNIT AND REUSE EXISTING WALL CONCENTRIC VENT. REPLACE FINAL FLEXIBLE GAS CONNECTION BACK TO SEDIMENT TRAP TEE.
EXISTING TWINNED UPFLOW FURNACE UNITS TO BE REPLACED IN-KIND INCLUDING EVAPORATOR COIL PAIRED WITH NEW OUTDOOR A/C UNIT (CU-2A). REUSE AND RECONNECT EXISTING ELECTRICAL. REUSE AND MODIFY EXISTING DUCTWORK IN SAME CONFIGURATION AS REQUIRED FOR NEW EQUIPMENT. RECONNECT TO EXISTING CONDENSATE DRAINAGE. RECONNECT EXISTING PVC VENTING TO NEW UNITS AND REUSE EXISTING WALL CONCENTRIC VENTS. REPLACE FINAL FLEXIBLE GAS CONNECTIONS AT EACH UNIT BACK TO SEDIMENT
TRAP TEE(S).
EXISTING SPLIT AIR CONDITIONING UNIT TO BE REPLACED IN-KIND. REUSE EXISTING CONCRETE EQUIPMENT PAD. RECONNECT TO EXISTING ELECTRICAL DISCONNECT SWITCH. REPLACE REFRIGERANT LINESET ROUTED TO INDOOR COIL PER EQUIPMENT MANUFACTURER REQUIREMENTS; INSTALL WITH LIQUID LINE SOLENOID VALVE, LIQUID LINE FILTER DRIER, AND SIGHT GLASS AT INTERIOR. REPLACE EXISTING CIRCUIT BREAKER IN
PANEL (OCPD) TO MATCH NEW EQUIPMENT, USING EXISTING WIRING.
EXISTING SPLIT AIR CONDITIONING UNIT TO BE REPLACED IN-KIND. REUSE EXISTING CONCRETE EQUIPMENT PAD. RECONNECT TO EXISTING ELECTRICAL DISCONNECT SWITCH. REPLACE REFRIGERANT LINESET ROUTED TO INDOOR COIL PER EQUIPMENT MANUFACTURER REQUIREMENTS; EXTERIOR INSULATION TO BE SHIELDED FOR UV-PROTECTION; INSTALL WITH LIQUID LINE SOLENOID VALVE, LIQUID LINE FILTER DRIER, AND SIGHT GLASS AT INTERIOR. REPLACE EXISTING CIRCUIT BREAKER IN PANEL (OCPD) TO MATCH NEW EQUIPMENT, USING EXISTING WIRING.
EXISTING WALL MOUNTED THERMOSTAT TO BE REPLACED IN-KIND IN SAME LOCATION. NEW THERMOSTAT(S)
MUST BE COMPATIBLE WITH ASSOCIATED MECHANICAL EQUIPMENT AND COMPLY WITH IMC/IECC
REQUIREMENTS (7-DAY PROGRAMMABLE, ETC.). REUSE EXISTING CONTROL WIRING.
REPLACE EXISTING REFRIGERANT PIPING ROUTING FROM OUTDOOR UNITS TO INDOOR COILS. MATCH ROUTING OF EXISTING AND REUSE EXISTING SUPPORT COMPONENTS. GAS AND LIQUID LINES SIZED PER FINAL SELECTED EQUIPMENT MANUFACTURER. PIPING TO BE FULLY INSULATED AND SHIELDED FOR UV-PROTECTION. REUSE WALL PENETRATION AND SEAL TO BE AIR-, WATER-, AND RODENT-TIGHT.
CU-1A3 CU-2A
FU-1A
FU-2A & FU-3A
319203
2 305/2026
BRD
ELECTRIC
PANELBOARD
T
1 2
BALLY
BUILDING
LESTER BUILDING
BALLY BUILDING FLOOR PLAN -
SCALE: 1/8"=1'-0"
NBALLY
BUILDING
LESTER BUILDING
CURATORIAL
BUILDINGS3
ELECTRIC
PANELBOARD
METAL BUILDING
LOUVERS, TYPICAL
CURATORIAL BUILDING
NOT TO SCALE
EXISTING EQUIPMENT SCHEDULE:
WP-1: MARVAIR MODPAC II MODEL AVP20ACA-08MO H9B1.
WP-2: MARVAIR MODPAC II MODEL AVP20ACA-08MO H9B1.
*THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ALL PROVIDED INFORMATION IN THE FIELD.
PROPOSED EQUIPMENT SCHEDULE:
WP-1: MARVAIR MODEL MAH1020AA080A, 20 MBH NOMINAL COOLING CAPACITY, 11EER, 8KW ELECTRIC HEAT KIT, 208/230V-1P, 44 MCA, 50A MOCP. NO ECONOMIZER. INCLUDE HARD START KIT. LOW AMBIENT COOLING. R-454B
REFRIGERANT WITH FACTORY REFRIGERANT LEAK DETECTION AND MITIGATION.
WP-2: MARVAIR MODEL MAH1020AA080A, 20 MBH NOMINAL COOLING CAPACITY, 11EER, 8KW ELECTRIC HEAT KIT, 208/230V-1P, 44 MCA, 50A MOCP. NO ECONOMIZER. INCLUDE HARD START KIT. LOW AMBIENT COOLING. R-454B
REFRIGERANT WITH FACTORY REFRIGERANT LEAK DETECTION AND MITIGATION.
*PROPOSED EQUIPMENT IS BASIS OF DESIGN ONLY. APPROVED EQUIVALENTS MEETING SALIENT
CHARACTERISTICS MAY BE PROPOSED WITH NPS APPROVAL.
KEYED NOTED:
EXISTING WALL MOUNTED PACKAGED AIR CONDITIONING UNIT TO BE REPLACED IN-KIND. REUSE EXISTING SYSTEMS ASSOCIATED WITH THIS EQUIPMENT INCLUDING ELECTRICAL CONNECTIONS, LOW-VOLTAGE CONTROL WIRING, ETC. RECONNECT TO EXISTING DISTRIBUTION DUCTWORK AND CONDENSER FAN DUCTWORK; PROVIDE NEW FLEXIBILE CONNECTIONS FOR DUCTWORK AS REQUIRED. CONTRACTOR MUST VERIFY FINAL SELECTED REPLACEMENT EQUIPMENT WILL FIT THE EXISTING LOCATION(S) AND FUNCTION AS
DESIGNED.
EXISTING WALL LOUVER(S) ASSOCIATED WITH THE CONDENSER FAN DUCTWORK TO REMAIN UNCHANGED.
REPLACE EXISTING ANALOG THERMOSTAT WITH NEW DIGITAL VERSION COMPATIBLE WITH NEW HVAC
EQUIPMENT. REUSE EXISTING CONTROL WIRING.
THE BALLY BUILDING INTERIOR IS FULLY OCCUPIED BY NPS STORAGE MATERIALS AND THE MATERIALS WILL NOT BE RELOCATED FOR THE EQUIPMENT REPLACEMENT. CONTRACTOR MUST COORDINATE WORK WITH
LIMITED ACCESS AND SPECIAL OCCUPANCY REQUIREMENTS PER THE SCOPE OF WORK.
WP-1
WP-2
T
T
N O
N -M
O V
A B
LE
S
H E
LV
IN
G
SLIDING DOOR
319203
3 305/2026
BRD
| Sheets and Views |
| 303680 - Plans-Admin |
| 303680 - Plans-Maint |
| 303680 - Plans-Comfort |
| 303680 - Plans-Fort |
File details come from the government source that posted it. Updated .