Price_Schedule_-_Revised_0001.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- Hazardous Tree Removal Federal contract opportunity
- Solicitation number
- 140P6426Q0104
About this file
This is a Price Schedule for Hazardous Tree Removal services at Ice Age National Scenic Trail, a National Park Service facility located in Cross Plains, Wisconsin. The price schedule lists 15 individual tree removal line items, each specifying tree species, diameter at breast height (DBH), height, and location relative to park infrastructure (office, barn, septic mound, driveway, and garage). Tree species include walnut, mulberry, maple, birch, and arborvitae, with DBH measurements ranging from 14 to 48 inches and heights from 15 to 55 feet. Special handling requirements are noted for specific items, including one walnut tree with a split above DBH, another with dead limbs, a maple requiring limbs-only removal to protect nesting birds, a birch split above DBH with branches overhanging the driveway and office, and a mulberry requiring extreme care to avoid nearby oak trees. All prices on the schedule are currently blank (listed as "$-0"), indicating this is a template awaiting contractor pricing submissions. The schedule is part of Solicitation 140P6426Q0104, a Request for Quote issued by the Department of the Interior National Park Service Midwest Region for a small business set-aside (100% total small business set-aside under NAICS code 561730 with a $9.5 million size standard). Contractors responding to this RFQ must complete and submit this price schedule along with required Federal forms (SF 1449 and SF 30) and must maintain active registration in the System for Award Management (SAM) with a valid Unique Entity Identifier (UEI) through contract performance. The anticipated award date is 15 days after the solicitation close date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Statement_of_Work_-_Revised_0002.pdf | ||
| Sol_140P6426Q0104_Amd_0002.pdf | ||
| Questions_and_Answers_0002.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Statement_of_Work_-_Revised_0001.pdf | ||
| Sol_140P6426Q0104_Amd_0001.pdf | ||
| Price_Schedule_-_Revised_0001.pdf | ||
| Clause_Package_-_Revised_0001.pdf | ||
| Price_Schedule.pdf | ||
| Price_Schedule.xlsx | XLSX spreadsheet | |
| Wage_Determination.pdf | ||
| Sol_140P6426Q0104.pdf | ||
| Statement_of_Work.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building Materials
| U.S. Department of Interior | Ice Age National Scenic Trail |
| National Park Service | Park Headquarters |
| 8075 Old Sauk Pass Rd | |
| Cross Plains, WI 535287 |
| PROJECT: Hazerdous Tree Removal | ||||
| Price Schedule | ||||
| Description | Unit | Quantity | Price/ Unit | Subtotal |
| 1. Walnut (Split Above DBH) |
N of Office
| DBH 48" Height 50' | EA | 1 | $ - 0 | |
| 2. Walnut |
NW of Office
| DBH 28" Height 50' | EA | 1 | $ - 0 | |
| 3. Walnut (Split Below DBH) |
N of Office
| DBH 15" & 25" Height 45' | EA | 1 | $ - 0 | |
| 4. Walnut (Tree Has Dead Limbs) |
SW of Office
| DBH 27" Height 50' | EA | 1 | $ - 0 | |
| 5. Walnut |
W of Barn
| DBH 25" Height 50' | EA | 1 | $ - 0 | |
| 6. Walnut |
W of Septic Mound
| DBH 22" Height 55' | EA | 1 | $ - 0 | |
| 7. Walnut |
W of Septic Mound
| DBH 29" Height 50' | EA | 1 | $ - 0 | |
| 8. Mulberry (Extreme Care to Avoid Oak) |
E of Barn
| DBH 30" Height 40' | EA | 1 | $ - 0 | |
| 9. Walnut |
E of Barn
| DBH 18" Height 45' | EA | 1 | $ - 0 | |
| 10. Walnut |
E of garage
| DBH 24" Height 50' | EA | 1 | $ - 0 | |
| 11. Walnut |
E of Driveway
| DBH 23" Height 50' | EA | 1 | $ - 0 | |
| 12. Maple (Limbs Only, Nesting Birds) |
E of Driveway
| DBH 24" Height 30' | EA | 1 | $ - 0 | |
| 13. Birch (Split Above DBH) |
E of Driveway (Hands Over Driveway & Office)
| DBH 14" & 17" Height 25' | EA | 1 | $ - 0 | |
| 14. Arborvitae |
W of Office
| DBH 18" Height 15' | EA | 1 | $ - 0 | |
| 15. Arborvitae |
W of Office DBH 20" Height 20' EA 1 $ - 0
Price Schedule Total $ - 0
*All items quotes on the Price Schedule must meet the requirments listed in Specifications provided with the Soliciation.
Printed: &D &T &Z&F image1.png
File details come from the government source that posted it. Updated .