Atch_2_Drawing_M1_Update_0001.pdf

PDF 57 KB Posted

Attached to
MORU-Energy Plant HVAC Upgrade
Solicitation number
140P6321B0011
Issued by

About this file

This document contains drawings and notes for an HVAC upgrade project at Mount Rushmore National Memorial. The drawings depict piping schematics and notes for connecting chilled water, hot water, and refrigerant lines between buildings. Key details include routing the piping overhead with space for insulation, providing flexible connections and vibration isolation, and notes on pipe sizing, drainage, insulation, and other installation requirements. The related federal contract opportunity is a solicitation from the National Park Service Midwest Region to perform an HVAC upgrade at the Mount Rushmore National Memorial energy plant. The solicitation number is 140P6321B0011 and it is seeking offers for upgrading the HVAC system as depicted in the drawings and specifications.

View the file

Other files

File Type Posted
Atch_3_Questions_Answers_0001.pdf PDF
Atch_1_POP_Phased_Approach_0001.pdf PDF
Sol_140P6321B0011_Amd_0001.pdf PDF
Atch_4_FAR_Clause_52_211-10_Revised_0001.pdf PDF
Drawings.pdf PDF
Specifications.pdf PDF
Sol_140P6321B0011.pdf PDF
5_13_21_COVID-19_Mask_Policy.pdf PDF
DOL_Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HWR

HWR

HWR

HWR

HWR

HWR

HWR

HWR

HWR

CWS

CWS

CWS

CWS

CWS

HWS

HWS

HWS

HWS

HWS

HWS

HWS

HWS

HWS

HWS

CWR

CWR

CWR

CWR

CWR

CWR

CWR

CWR

CWR

CWR

CWS

CWS

CWS

CWS

CWS

CWS

CWS

CWS

CWS

CWS

CWR

CWR

CWR

CWR

CWR

HWS

HWS

HWS

HWS

HWS

HWR

HWR

HWR

HWR

HWR

AD

M

IN

ISTR

ATIO

N

BU

ILD

IN

G

EN

ER

G Y

BU

ILD

IN

G

VISITO

R

C

EN

TER

BU

ILD

IN

G

2 3

33" 2 1/2"

3" 4"

M3 5

M3 5

M3 2

N O

TE:

C

LO

SE TH

E BY-PASS O

N

TH

E TH

R

EE-W

AY

VALVE (H

EATIN

G

AN

D

C O

O

LIN

G , M

AKIN

G

TH

EN

2-W

AY VALVES) O

N

TH

E

FO

LLO

W

IN

G

: AH

U

-3, AH

U

-4, FC

-1, FC

-2, FC

-3, FC

-4 AN

D

FC

-5

PIPING

G

ENERAL NO

TES:

1.

SIZE AND RO

UTE REFRIG

ERANT PIPING

PER M

ANUFACTURERS'

RECO

M

M

ENDATIO

NS.

2.

RO

UTE ALL HO

RIZO

NTAL HVAC PIPING

IN M

ECHANICAL RO

O

M

S AT

A M

INIM

UM

O

F 7'-6" ABO

VE FINISHED FLO

O R.

3.

PRO

VIDE AN AIR VENT AT THE HIG

H PO

INT O

F EACH DRO

P IN THE

HEATING

W

ATER, CHILLED W

ATER, AND O

THER CLO

SED W

ATER

PIPING

SYSTEM

S. ALL PIPING

SHALL G

RADE TO

LO

W

PO

INTS.

PRO

VIDE HO

SE END DRAIN VALVES AT THE BO

TTO

M

O

F ALL RISERS

AND LO

W

PO

INTS.

4.

UNLESS O

THERW

ISE NO

TED, ALL PIPING

IS O

VERHEAD, TIG

HT TO

UNDERSIDE O

F STRUCTURE O

R SLAB, W

ITH SPACE FO

R

INSULATIO

N IF REQ

UIRED.

5.

INSTALL PIPING

SO

THAT ALL VALVES, STRAINERS, UNIO

NS, TRAPS,

FLANG

ES, AND O

THER APPURTENANCES REQ

UIRING

ACCESS ARE

ACCESSIBLE.

6.

ALL VALVES SHALL BE INSTALLED SO

THAT VALVE REM

AINS IN

SERVICE W

HEN EQ

UIPM

ENT O

R PIPING

O

N EQ

UIPM

ENT SIDE O

F

VALVE IS REM

O

VED.

7.

ALL BALANCING

VALVES AND BUTTERFLY VALVES SHALL BE

PRO

VIDED W

ITH PO

SITIO

N INDICATO

RS AND M

AXIM

UM

ADJUSTABLE STO

PS (M

EM

O

RY STO

PS).

8.

ALL VALVES (EXCEPT CO

NTRO

L VALVES) AND STRAINERS SHALL BE

FULL SIZE O

F PIPE BEFO

RE REDUCING

SIZE TO

M

AKE

CO

NNECTIO

NS TO

EQ

UIPM

ENT AND CO

NTRO

LS.

9.

UNIO

NS AND/O

R FLANG

ES SHALL BE INSTALLED AT EACH PIECE O

F

EQ

UIPM

ENT, IN BYPASSES, AND IN LO

NG

PIPING

RUNS (100 FEET

O R M

O

RE) TO

PERM

IT DISASSEM

BLY FO

R ALTERATIO

N AND

REPAIRS.

10.

INSTALL ALL PIPING

W

ITHO

UT FO

RCING

O

R SPRING

ING

11.

ALL VALVES SHALL BE ADJUSTED FO

R SM

O

O

TH AND EASY

O

PERATIO

N. ALL PIPING

W

O

RK SHALL BE CO

O

RDINATED W

ITH ALL

TRADES INVO

LVED. O

FFSETS IN PIPING

ARO

UND O

BSTRUCTIO

NS

SHALL BE PRO

VIDED AT NO

ADDITIO

NAL CO

ST TO

THE O

W

NER.

12.

PRO

VIDE FLEXIBLE CO

NNECTIO

NS IN ALL PIPING

SYSTEM

S

CO

NNECTED TO

PUM

PS, CHILLERS, CO

O

LING

TO

W

ERS, AND O

THER

EQ

UIPM

ENT W

HICH REQ

UIRE VIBRATIO

N ISO

LATIO

N EXCEPT

W

ATER CO

ILS. FLEXIBLE CO

NNECTIO

NS SHALL BE PRO

VIDED AS

CLO

SE TO

THE EQ

UIPM

ENT AS PO

SSIBLE O

R AS INDICATED O

N THE

DRAW

ING

S.

13.

SLO

PE REFRIG

ERANT PIPING

1%

IN THE DIRECTIO

N O F O

IL RETURN.

LIQ

UID LINES M

AY BE INSTALLED LEVEL..

14.

PRO

VIDE LINE SIZE LIQ

UID INDICATO

RS IN M

AIN LIQ

UID LINE

LEAVING

CO

NDENSER O

R RECEIVER. INSTALL M

O

ISTURE-LIQ

UID

INDICATO

RS IN LIQ

UID LINES BETW

EEN FILTER DRYERS AND

THERM

O

STATIC EXPANSIO

N VALVES AND IN LIQ

UID LINE TO

RECEIVER.

15.

PRO

VIDE REPLACEABLE CARTRIDG

E FILTER DRYERS W

ITH THREE

VALVE BYPASS ASSEM

BLY FO

R SO

LENO

ID VALVES, ADJACENT TO

X

HVAC KEY NOTES:

1.

C O

N N

EC

T 4" C

W S & C

W R

FR

O

M

TU

N N

EL TO

4" C

W S & C

W R

IN

BU

ILD

IN

G

2.

C

O N

N

EC

T 2 1/2" C W

S & C W

R

FR

O M

TU

N

N

EL TO

2 1/2" C W

S & C

W R

IN

BU

ILD

IN

G

3.

C

O N

N

EC

T 3" H W

S & H W

R

FR

O M

TU

N

N

EL TO

3" H W

S & H W

R

IN

BU

ILD

IN

G

4.

PR

O

VID

E AN

EXPAN

SIO

N

LO

O

P IN

TH

E M

ID

D

LE O

F TH

E

TU

N

N

EL.

5.

PIPIN

G

IN

TH

E TU

N N

EL BETW

EEN

TH

E EN

ER

G

Y C

EN

TER

AN

D

TH

E VC

BU

ILD

IN

G

IS ~ 480 FEET. N

O T U

SED

6.

PIPIN

G

IN

TH

E TU

N N

EL BETW

EEN

TH

E EN

ER

G

Y C

EN

TER

AN

D

TH

E H C

BU

ILD

IN

G

IS ~ 320 FEET N

O

T U

SED

7.

PR

ESSU

R

E SEN

SO

R

LO

C

ATIO

N .N

SITE PLAN DRAW

ING

IS DIAG

RAM

ATIC. DO

NO

T SCALE.

APPRO

XIM

ATE LENG

THS O

F EXISTING

TUNNELS BETW

EEN BUILDING

EXTERIO

R ENVELO

PES:

ENERG

Y CENTER TO

VISITO

R CENTER = 55'

ENERG

Y CENTER TO

ADM

INISTRATIVE BUILDING

= 120'

REVISED PER AM

ENDM

ENT 1

AUG

UST 5, 2021

File details come from the government source that posted it. Updated .