This is an Updated Price Schedule for Solicitation No. 140P5426R0013, which replaces the original price schedule in its entirety. The solicitation is for the replacement of HVAC system components at the Visitor Center (Building 213) at Fort San Cristóbal – San Juan National Historic Site in Puerto Rico. The work involves replacing eight complete HVAC systems across different locations, including five 5-ton units (three Trane models and two Gree models) and three 4-ton Trane units. Offerors must complete the Updated Price Schedule aligned with the requirements in the Updated Statement of Work (Attachment 0003) and submit it with their quotations.

Contractor pricing must be firm-fixed-price and include all labor, supervision, materials, equipment, permits, transportation, disposal, testing, startup, commissioning, documentation, warranty, and incidental costs for fully operational systems. Offerors must provide a detailed price breakdown addressing equipment pricing, labor, materials, refrigerant piping, electrical work, controls, mobilization/demobilization, removal and disposal, startup and commissioning, warranty, and any additional costs. A second site visit is scheduled for Wednesday, July 15, 2026, at 8:00 AM AST at the Visitor Center (Building 213), Almendro Tree entrance, Old San Juan, Puerto Rico 00901. Contractors must provide a technical proposal including technical approach, equipment specifications with manufacturer cut sheets, equipment lead time, estimated installation schedule, project completion schedule, relevant experience statement, and identification of the proposed Project Manager/Superintendent. The point of contact is Ana Viego at ana_viego@nps.gov or (787) 644-3647.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0004, Solicitation No. 140P5426R0013 – Updated Price Schedule, hereby replaces the Price Schedule originally included in the solicitation in its entirety. Offerors shall complete and submit the Updated Price Schedule with their quotations. The Updated Price Schedule has been revised to align with the requirements set forth in Attachment 0003, Updated Statement of Work (SOW).

A second site visit has been scheduled for Wednesday, July 15, 2026, at 8:00 AM AST.

Interested contractors shall meet the Government representative at the same meeting location identified in the solicitation: Visitor Center (Building 213), Almendro Tree entrance, located behind the Antiguo Casino de Puerto Rico, Av. Luis Muñoz Rivera, Old San Juan, Puerto Rico 00901.

Contractors shall arrive in their own vehicles and be prepared to present identification upon request. The Government representative will meet attendees at the designated location and escort them to the project site.

The purpose of the site visit is to allow contractors to familiarize themselves with the existing site conditions, access requirements, equipment locations, and other factors that may affect performance of the work and preparation of their quotations.

Attendance is strongly encouraged. Contractors are responsible for becoming familiar with all site conditions that may affect performance and pricing of the work.

Point of Contact:

Ana Viego Email: ana_viego@nps.gov Cell: (787) 644-3647

PRICE SCHEDULE

Replace HVAC System Components – Visitor Center (Building 213) Fort San Cristóbal – San Juan National Historic Site

Offeror: ________________________________

DUNS/UEI: _______________________________

Date: _________________________________

CLIN 0001 – Base Requirement

Item Description Qty Unit Unit Price

Total Price

0001AA

Replace Complete HVAC System – Location #1 (5 Ton Trane 4TTR3060E1000NA)

1 EA $________ $________

0001AB

Replace Complete HVAC System – Location #2 (5 Ton Trane 4TTR6061C1000AA)

1 EA $________ $________

0001AC

Replace Complete HVAC System – Location #3 (5 Ton Trane 4TTV0048A1000CD)

1 EA $________ $________

0001AD

Replace Complete HVAC System – Location #4 (5 Ton Gree FLEXX60AC230V1A0)

1 EA $________ $________

0001AE

Replace Complete HVAC System – Location #5 (5 Ton Gree FLEXX60AC230V1A0)

1 EA $________ $________

0001AF

Replace Complete HVAC System – Location #6 (4 Ton Trane 4TTR3048E1000PB)

1 EA $________ $________

0001AG

Replace Complete HVAC System – Location #7 (4 Ton Trane 4TTR3048E1000PB)

1 EA $________ $________

0001AH

Replace Complete HVAC System – Location #8 (4 Ton Trane 4TTR3048E1000PB)

1 EA $________ $________

Total Base Price (CLIN 0001)

Price Includes

Pricing shall include all labor, supervision, materials, equipment, permits (if applicable), transportation, disposal, testing, startup, commissioning, documentation, warranty, and incidental costs necessary to provide complete, fully operational HVAC systems in accordance with the Statement of Work.

Contractor Price Breakdown

The Contractor shall also provide a detailed company quotation that includes, at a minimum:

• Equipment pricing

• Labor

• Materials

• Refrigerant piping

• Electrical work

• Controls

• Mobilization/Demobilization

• Removal and disposal

• Startup and commissioning

• Warranty

• Any additional costs included in the proposed pricing

Technical Proposal

The Contractor shall submit the following with its quotation:

• Technical Approach describing how the requirements of the Statement of Work will be accomplished.

• Equipment specifications and manufacturer cut sheets.

• Lead time for equipment procurement.

• Estimated installation schedule.

• Project schedule identifying anticipated completion.

• Relevant experience and capability statement demonstrating experience performing similar HVAC replacement projects.

• Identification of the proposed Project Manager/Superintendent.

Delivery / Performance

The Contractor shall identify:

Equipment Lead Time: _______________________

Notice to Proceed to Mobilization: _______________________

Estimated Installation Duration: _______________________

Contractor Certification

The undersigned certifies that the prices quoted are firm-fixed-price and include all costs necessary to perform the work described in the Statement of Work.

Company: ______________________________________

Authorized Representative: ___________________________

Title: _________________________________________

Signature: _____________________________________

Date: _________________________________________

File details come from the government source that posted it. Updated .