A06_Project_Specs_Appendix_B_Part_I_(1)_Atatchement_2.pdf
PDF 17 MB Posted
- Attached to
- Mammoth Caves -RECONSTRUCT HERITAGE TRAIL BOARDWA Federal contract opportunity
- Solicitation number
- 140P5324R0026
About this file
This document appears to be Appendix B, Part I, Attachment 2 to a Request for Proposal (RFP) for the "Mammoth Caves - RECONSTRUCT HERITAGE TRAIL BOARDWALK" project. The RFP is solicitation number 140P5324R0026, issued by the Department of the Interior National Park Service Southeast Region.
The document provides detailed project specifications and requirements for the reconstruction of the Heritage Trail Boardwalk at Mammoth Caves National Park. It outlines the scope of work, including the demolition and replacement of the existing boardwalk, installation of new boardwalk sections, and related site work. Key requirements include the use of specific materials, construction methods, and environmental protection measures. The document also addresses project timeline, site access, and other administrative details.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .