140P5121Q0038 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PSE
Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW
NPS SER EAST MABO
PSE
Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW
NPS SER EAST MABO
06/16/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/04/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose is the amendment is to provide Questions and Answers received in response to the solicitation.
Questions and Answers are provided as attachment 0007.
Legacy Doc #: NPS
Period of Performance: 07/05/2021 to 10/04/2021
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Edward Dingle
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0002; RFQ # 140P5121Q0038 Attachment 0007
Replace three (3) Non- Operational Vertical Platform Lifts at Fort Sumter National
Monument Solicitation # 140P5121Q0038
Questions and Answers
Question 1. Looking at the SOW what all must be included with our initial solicitation due by July2nd? My understanding is that the project schedule, property protection plan, proof of qualifications, disposal/recycling plan, safety plan, and inspections/Maintenance plan will be due on that date. And that the rest: the attachments/cutting & drilling plan, work plan, special requirements, drawings, and samples/options will be due two weeks after contract award?
Answer:
The following shall be submitted with offeror’s quote submissions:
1) Product specifications with enough detail to determine that the proposal fulfills the requirement,
2) Proof of qualifications
3) Preliminary attachment plan. A rough idea of how the proposed unit will be attached, size, quantity, & location of fasteners/bolts etc.
4) O&M and inspection plan so we can compare.
5) Rough schedule.
The remaining items can be provided for review/approval after award.
Question 2. Are the number of days following documents due business days or regular calendar days?
Answer: The Statement of Work states Calendar Days.
Question 3. How must our solicitation be sent in along with the required attached documents and plans? Via quotes and PDF? Does the cost of our lifts need to be inputted on document # Sol_140P5121Q0038?
Answer: All quotes are to be submitted to the Contracting Officer at edward_dingle@nps.gov. All pricing information shall be provided on attachment #0003 with a separate cost breakdown sheet.
Question 4. Since we are required for all disposal and recycling, are we allowed to leave a disposal bin overnight at the fort for the duration of the lift installation? Or must the garbage be offloaded via freight each time we need it disposed of?
Answer: A disposal plan will need to be submitted and approved after award. Construction debris can be stored on the fort for short periods of time and does not need to be taken from the fort each day, provided it can be stored safely out of the way from visitor and employee areas.
mailto:edward_dingle@nps.gov
Amendment 0002; RFQ # 140P5121Q0038 Attachment 0007
Question 5. From the contract award date, the install must be completed within 90 calendar days, correct?
Answer: Please see Statement of Work, page 8, Period of Performance
Question 6. I have been in touch with the SC LLR elevator and amusement ride division, they will not permit or inspect federal government property, which I was told the Fort falls under, therefore is it alright to have a licensed private consulting firm inspect the units initially and annually going forward? The one we would use inspects federal jurisdiction lifts regularly. I have my email correspondence with LLR attached.
Answer: There is often confusion about state jurisdiction on Federal property. SC Elevator and Amusement Rides does currently perform annual elevator inspections at our Federal facilities in Charleston. It is the park's preference to have state inspections for these lifts.
Question 7. Are we responsible for determining a solution for any gapping issues/modifications needed for our upper gates to attach to the Fort’s existing upper landing safely and properly?
Answer: Yes.
Question 8. Is the 24hr service call requirement standard calendar days, or can they be within the next following business day?
Answer: Next day response (including weekends) is acceptable. Transportation for service calls can be provided by the NPS either by Ferry Boat or Park Boat and will be determined on a case by case basis.