(x)
140P5121Q0038 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PSE
Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW
NPS SER EAST MABO
PSE
Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW
NPS SER EAST MABO
06/10/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/04/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose is the amendment is to provide updated site visit information.
The updated site visit information is provided as attachment 0006.
Legacy Doc #: NPS
Period of Performance: 07/05/2021 to 10/04/2021
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Edward Dingle
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Attachment 0006 – RFQ # 140P5121Q0038
SITE VISIT INFORMATION
The National Park Service invites you to attend a site inspection to provide all material, labor, and supervision to Replace three (3) non-operational vertical platform lifts with three new vertical platform (wheelchair) lifts that are marine grade aluminum, and carry a stamped wind load rating up to 180mph and satisfies legislatively mandated requirements of the Architectural Barriers Act (ABA) at on Battery Huger, within Fort Sumter in the Charleston Harbor Charleston, South Carolina. All installations, materials, and coatings must facilitate ease of operation and maintenance and emergency service calls must be responded to within twenty-four (24) hours. The Site Visit will be held at the time and place listed below:
LOCATION:
Fort Sumter National Monument 1214 Middle Street, Sullivan’s Island South Carolina, 29482 TIME: 10:00 am. (EST) DATE: Monday, June 14, 2021
The purpose of this inspection is for interested parties to ascertain the local conditions of the grounds at each location, which could materially affect conduct of operations and the cost thereof. All questions must be submitted electronically in writing to the Contracting Officer at the email address below NO LATER THAN 10:00am (EST) on Wednesday, June 16, 2021 (No telephonic questions will be accepted). A summary of questions and answers arising from the site inspection and/or review of the package will be provided to all prospective contractors as an amendment to the solicitation. Only those written answers provided to all offerors will be the Government's official response to questions.
Information provided at this site visit shall not qualify the terms and conditions of the solicitation and specifications. No oral questions will be accepted. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
All questions must be submitted to the Contracting Officer at: edward_dingle@nps.gov
We consider attendance at this site inspection vital to the preparation of a competitive and cost-effective quote, and to understand the total result desired by the Government. Failure to attend this inspection may not be used as an excuse for omissions or miscalculations in quotes. It is again emphasized that it is most advantageous for each contractor to have qualified representation at the site inspection. Coordination for attending the site visit shall be made through the site visit point of contact listed below. *NO individual site inspections will be offered nor conducted. All parties who plan to attend the site visit must RSVP no later than Friday June 11, 2021 2:00pm Eastern Standard Time.
COVID-19 Special Instructions: Pursuant to Executive Order (EO) 13991, in order to protect the Federal Workforce and individuals interacting with the Federal Workforce, and to ensure the continuity of Government services and activities, on-duty or on-site Federal contractors shall wear mask, maintain safe physical distance, and adhere to other public health measures as provided in the Center for Disease Control (CDC) guidelines. Therefore, the number of representatives from each interested firm/company attending this site visit shall be limited to one (1) that must adhere to these instructions.
Site Visit Point of Contact Information:
Name: William J. Reilly, Chief of Facility Management Address: Fort Sumter National Monument 1214 Middle Street Sullivan's Island, SC 29482 Email: william_reilly@nps.gov or Telephone: Office (803) 394-4284 mailto:edward_dingle@nps.gov mailto:william_reilly@nps.gov
File details come from the government source that posted it. Updated .