(x)
140P5121Q0034 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PSE
Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW
NPS SER EAST MABO
PSE
Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW
NPS SER EAST MABO
06/16/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/24/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide answers to questions in response to the solicitation and provide an updated price schedule.
The questions and answers are provided as attachment 0006.
The updated price schedule is provided as attachment 0007.
Legacy Doc #: NPS
Period of Performance: 06/28/2021 to 09/27/2021
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Edward Dingle
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment 0001; RFQ # 140P5121Q0034 Attachment 0006
Replace Damaged Culverts at Kings Mountain National
Military Park Solicitation # 140P5121Q0034
Questions and Answers
Question 1. In the SOW on page 5 you request a safety plan. Is this not a submittal after award?
Answer: The safety plan can be submitted after receipt of awarded contract for review and approval.
Question 2. There is only one lump sum bid item on your bid schedule. Does the include the two options?
Answer: See revised Bid schedule as attachment 0007.
Question 3. In the SOW on page 8 there is a bid option 1, but not on your bid schedule.
Should it be included?
Answer: See revised Bid schedule as attachment 0007.
Question 4. In the SOW on page 9 there is a bid option 2, but not on your bid schedule.
Should it be included?
a. The crush and run amounts to 3,649 CY of material?
b. There is a note about bigger stone, but no volume and size, how do you want us to bid it without this specs?
c. The material cost alone for option 2 pushes the magnitude of this RFQ way beyond the upper limit of this solicitation?
d. Please confirm that the graveled width of the road should be 20 ft.
Answer: See revised Bid schedule as attachment 0007.
a. Roughly 3,649 CY of material should be fine.
b. Roughly 1,800 CY on the bigger stone.
c. This is a bid option.
d. The road is old dirt road. It moves in and out but yes, it is mostly 20 LF wide.
Amendment 0001; RFQ # 140P5121Q0034 Attachment 0006
Question 5. Can the volume of rip rap and size please be made known in order to bid?
Answer: See response to question number four (4).
Question 6. In the SOW page 10 mention is made of Geofabric. Is it required in conjunction with the rip rap?
Answer: Geofabric is not required.
Question 7. Is any brushing required to clear vegetation from the roadway?
Answer: No brushing is required.