Amendment 0001; RFQ # 140P5121Q0034 Attachment 0006
Replace Damaged Culverts at Kings Mountain National
Military Park Solicitation # 140P5121Q0034
Questions and Answers
Question 1. In the SOW on page 5 you request a safety plan. Is this not a submittal after award?
Answer: The safety plan can be submitted after receipt of awarded contract for review and approval.
Question 2. There is only one lump sum bid item on your bid schedule. Does the include the two options?
Answer: See revised Bid schedule as attachment 0007.
Question 3. In the SOW on page 8 there is a bid option 1, but not on your bid schedule.
Should it be included?
Answer: See revised Bid schedule as attachment 0007.
Question 4. In the SOW on page 9 there is a bid option 2, but not on your bid schedule.
Should it be included?
a. The crush and run amounts to 3,649 CY of material?
b. There is a note about bigger stone, but no volume and size, how do you want us to bid it without this specs?
c. The material cost alone for option 2 pushes the magnitude of this RFQ way beyond the upper limit of this solicitation?
d. Please confirm that the graveled width of the road should be 20 ft.
Answer: See revised Bid schedule as attachment 0007.
a. Roughly 3,649 CY of material should be fine.
b. Roughly 1,800 CY on the bigger stone.
c. This is a bid option.
d. The road is old dirt road. It moves in and out but yes, it is mostly 20 LF wide.
Amendment 0001; RFQ # 140P5121Q0034 Attachment 0006
Question 5. Can the volume of rip rap and size please be made known in order to bid?
Answer: See response to question number four (4).
Question 6. In the SOW page 10 mention is made of Geofabric. Is it required in conjunction with the rip rap?
Answer: Geofabric is not required.
Question 7. Is any brushing required to clear vegetation from the roadway?
Answer: No brushing is required.