December 12, 2019

Mr. Paul Cecere Chief of Preservation & Maintenance Sagamore Hill NHS 20 Sagamore Hill Rd.

Oyster Bay, NY 11771

Inspection Address:

20 Sagamore Hill Rd.

Visitor’s Center Oyster Bay, NY 11771

Dear Mr. Cecere:

Professional Building Inspectors, Inc (PBI) was retained to conduct an asbestos inspection on December 9, 2019 at the address listed above. This building is slated for demolition. Samples in the building were obtained in accord with NYS Department of Labor regulations and sent for analysis at an EMLAP certified lab.

This survey found asbestos containing material, ACM, in the building as detailed below. If additional materials are to be disturbed that have not been tested, contact our office. NYS permits materials to be presumed to be asbestos and handled accordingly, however, materials cannot be presumed to be non-asbestos.

Should you have any questions, do not hesitate to contact me. The attached pages provide details as required by NYS Department of Labor.

INSPECTORS QUALIFICATIONS

This inspection was performed by William Emery who is licensed by the NYS Department of Labor (license # 13-07987) and results were reviewed by Scott Gressin who is licensed by the NY State Department of Labor (License # 07-07380).

SAMPLE ANALYSIS PROCEDURE

Suspect material was sampled and delivered under a chain of custody for analysis to an ELAP certified laboratory. In New York State, non-friable organically bound (NOB) materials determined to be negative (< or =1% asbestos) by PLM must be analyzed by TEM before the sample can be officially considered as non-asbestos containing material (ACM). Friable samples were analyzed via PLM in accordance with NY State ELAP 198.1 method.

BUILDING/STRUCTURE ASBESTOS SURVEY REQUIREMENTS

The asbestos survey shall include a thorough inspection for and identification of all building materials throughout the building/structure or portion thereof to be demolished, renovated, remodeled, or to have repair work. The required inspection shall be performed by a certified asbestos inspector, and, at a minimum, shall include the identification of asbestos containing material (ACM) by the following methods:

1-The review of building/structure plans and records, if available, for references to asbestos material used in construction, renovation or repair; and

2-A visual inspection for building materials throughout the building/structure or portion thereof to be demolished, renovated, remodeled, or repaired. All building materials visually assessed shall be assumed to be ACM, unless bulk sampling is conducted as per standard EPA and OSHA accepted methodologies. The subsequent analyses are performed by a laboratory that meets the requirements that satisfies both NYS ELAP and federal requirements, including multi-layered sample analyses, to document non-asbestos containing material.

TRANSMITTAL OF BLDG STRUCTURE ASBESTOS SURVEY INFORMATION

One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted by the building/structure owner as follows:

One copy of the completed asbestos survey shall be sent by the owner or their agent to the local government entity charged with issuing a permit for such demolition, renovation, remodeling or repair work under applicable State or local laws.

The completed asbestos survey shall be kept on the construction site with the asbestos notification and variance, if required, throughout the duration of the asbestos project and any associated demolition, renovation, remodeling or repair project.

BUILDING/STRUCTURE ASBESTOS SURVEY INFORMATION

The asbestos survey shall, at a minimum, identify and assess with due diligence, the locations, quantities, friability and conditions of all building material types at the affected portion of the building/structure. The certified asbestos inspector is responsible for identification and assessment of all types within the affected portion of the building/structure.

All building materials visually assessed shall be assumed to be ACM, unless bulk sampling is conducted as per standard EPA and OSHA accepted methodologies. The subsequent analysis is performed by a laboratory that meets the requirements and the analyses satisfies both NYS ELAP and federal requirements, including multi-layered sample analyses, to document non-asbestos containing material.

The building/structure asbestos survey shall also include the building/structure name, address, the building/structure owner’s name and address, the name and address of the owner's agent, the name of the firm performing the asbestos survey and a copy of the firm’s current asbestos handling license, the names of the certified inspector(s) performing the survey and a copy of the current asbestos handling certificate for each inspector utilized, the dates of the asbestos survey, a listing of homogeneous areas identifying which ones are ACM, all laboratory analyses reports for bulk samples collected, and copies of the appropriate certifications for the laboratory used for analysis of samples taken during the asbestos survey.

REMOVAL REQUIREMENT

If the building/structure asbestos survey finds that the portion of the building/structure to be demolished, renovated, remodeled, or have repair work contains ACM, which is impacted by the work, the owner or the owner’s agent shall conduct, or cause to have conducted, asbestos removal performed by a licensed asbestos abatement contractor in conformance with all standards set forth.

All ACM impacted by the demolition, renovation, remodeling or repair project shall be removed, prior to access or disturbance by other uncertified trades or personnel. No demolition, renovation, remodeling or repair work shall be commenced by any owner or the owner’s agent prior to the completion of the asbestos abatement in accordance with the notification requirements. For multi-phased work, the access restriction for uncertified trades or personnel applies to each intermediate portion of the entire project. Upon completion of the intermediate portion of the asbestos project, other trades or personnel may access that portion of the work site. For demolition projects that are exempt from asbestos survey requirements due to being structurally unsound, the demolition is considered an asbestos project.

All building/structure owners and asbestos abatement contractors on a demolition, renovation, remodeling, or repair project shall inform all trades on the work site about the ACM at the work site.

UNIDENTIFIED AND UNASSESSED ASBESTOS

When any construction activity, such as demolition, remodeling, renovation or repair work, reveals suspect ACM that has not been identified by the asbestos survey, or has not been identified by other inspections as per current OSHA or EPA requirements, all activities shall cease in the area where the suspect ACM is found. Unassessed suspect miscellaneous ACM shall be treated and handled as ACM and assumed to be ACM, unless proven otherwise by standard EPA and OSHA accepted methods. To document non-asbestos containing material, analysis must be performed by a laboratory that meets the requirements of the DOH; and the analysis satisfies both NYS ELAP and federal requirements.

ASBESTOS PROJECT

An asbestos project is any work that involves the removal, encapsulation, enclosure, repair or disturbance of friable or non-friable asbestos, or any handling of asbestos material that may result in the release of asbestos fibers. For the purpose of compliance an asbestos project shall include any disturbance of asbestos fibers, and the planning, asbestos survey, design, background air sampling, inspection, air sampling and oversight of abatement work, cleanup, and the handling of all asbestos material subject to abatement, as well as the supervising of such activities. An asbestos project starts with Phase I when the planning, asbestos survey, and design work begins or is required to begin. The project shall not be considered completed until Phase II D is complete.

See Table 1 below:

Table 1 ASBESTOS PROJECT PHASES OF WORK

Phase I

(Prior to Asbestos Abatement Contractor

Mobilization)

Pre-Abatement

Phase II

Start-------------------------Abatement-------------------------End

A B A B C D

Asbestos Survey, Planning & Design

Background Air Sampling

Regulated Abatement Work

Area(s) Preparation &

Enclosure Construction

Asbestos Handling including, Gross

Removal or Abatement, Initial Cleans and Waste

Removal

Final Cleaning & Clearance

Air Samples

Final Waste

Removal From Site

Start----------------------------------Asbestos Project------------------------------------End

ASBESTOS PROJECT SIZE

Large asbestos project: An asbestos project involving the removal, disturbance, enclosure, encapsulation, repair or handling of 160 square feet or more of ACM, or 260 linear feet or more of

ACM.

Small asbestos project: An asbestos project involving the removal, encapsulation, enclosure, repair, disturbance or any handling of more than 10 and less than 160 square feet of ACM or more than 25 and less than 260 linear feet of ACM.

Minor asbestos project: An asbestos project involving the removal, disturbance, repair, encapsulation, enclosure or handling of 10 square feet or less of ACM or 25 linear feet or less of

ACM.

ASBESTOS REMOVAL CATEGORIES

Category I Non-Friable ACM: NESHAP classification - Asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products, containing more than one percent (1%) asbestos, that when dry, can not be crumbled, pulverized, or reduced to powder by hand pressure.

Category II Non-Friable ACM: NESHAP classification - Any material, excluding Category I Non- Friable ACM, containing more than one percent (1%) asbestos, that when dry, can not be crumbled, pulverized, or reduced to powder by hand pressure.

Class I Asbestos Work: OSHA term meaning activities involving the abatement of Thermal Systems Insulation (TSI), and surfacing ACM and PACM.

Class II Asbestos Work: OSHA term meaning activities involving the abatement of ACM which is not TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics.

Class III Asbestos Work: OSHA term meaning Repair and Maintenance operations, where no more than a minor quantity of ACM, including TSI and surfacing ACM and PACM, is likely to be disturbed.

Class IV Asbestos Work: OSHA term meaning Maintenance and Custodial Activities during which employees contact but do not disturb ACM or PACM and activities to clean up non-ACM dust, waste and debris resulting from Class I, II and III activities.

DEFINITIONS:

ABATEMENT: Procedures to control fiber release from asbestos material. This includes removal, encapsulation, enclosure, repair, and disturbance of friable asbestos or any handling of asbestos material that may result in the release of asbestos fibers.

AMOSITE: An Asbestiform mineral of the amphibole group containing approximately 50% silicon and 40% Iron(II) Oxide, and is made up of straight brittle fibers, light gray to pale brown in color.

AMPHIBOLE: One of the two major groups of minerals from which the Asbestiform minerals are derived, distinguished by their chain-like crystal structure and chemical composition.

ASBESTOS: A generic name given to a number of naturally occurring hydrated mineral silicates that possess a unique crystalline structure, are incombustible in air, and are separable into fibers. Asbestos includes the asbesti-form varieties of chrysotile(serpentine); crocidolite (riebeckite); amosite (cummington-grunerite); anthophyllite; and actinolite.

ASBESTOS PROJECT: Work undertaken by a contractor which at any time involves any aspect of the removal, encapsulation, enclosure or disturbance of friable asbestos, or any handling of asbestos material that may result in the release of asbestos fiber, except work in an owner-occupied single family dwelling performed by the owner of such dwelling. An asbestos project shall include the planning, design, monitoring, inspection, and air sampling of abatement work, as well as the supervising of such activities.

BUILDING OWNER: The person in whom legal title to the premises is vested unless the premises are held in land trust, in which instance building owner means the person in whom beneficial title is vested.

ELECTRON MICROSCOPY: A method of asbestos sample analysis which utilizes an electron beam to differentiate between fibers.

DEFINITIONS:

EMERGENCY: An unexpected, unanticipated or unforeseen occurrence, including but not limited to, a steam, chemical, gas or water line rupture, a boiler failure, or a building collapse, which poses (a) an imminent danger to the health and safety of the public, the response to which will constitute an asbestos project; or (b) an asbestos-related risk to the health and safety of the public from exposure to asbestos fibers.

FRIABLE ASBESTOS: Any materials that contain more than 1% asbestos and can be crumbled, pulverized, or reduced to powder by hand pressure.

HEPA FILTER VACUUM EQUIP: Vacuuming equipment with a high efficiency particulate air filtration system. This filter is capable of trapping and retaining 99.97 percent of asbestos fibers greater than 0.3 microns equivalent aerodynamic diameter.

HOMOGENEOUS: Evenly mixed and similar in appearance and texture throughout.

NESHAP: National Emission Standard for Hazardous Air Pollutants

OSHA: Occupational Safety and Health Administration

OPERATIONS AND MAINTENANCE PLAN (OMP): Specific procedures and practices developed for the interim control of asbestos-containing materials in buildings until it is removed.

POLARIZED LIGHT MICROSCOPY (PLM): An optical microscopic technique used to distinguish between different types of asbestos fibers by their shape and unique optical properties.

REPAIR: Corrective action using required work practices to control fiber release from damaged asbestos material.

TSI: Thermal Systems Insulation

ASBESTOS OVERVIEW

Asbestos is the generic name of a naturally occurring fibrous mineral. The three most common types of asbestos are: Chrysotile, Amosite and Crocidolite. Asbestos was considered "THE MAGIC MINERAL MATERIAL" at the beginning of the 20th century because of its excellent acoustic, insulating and thermal resistance. Today, however asbestos is a known carcinogen, having been medically documented as a cause of a number of respiratory ailments and other diseases such as Asbestosis and Mesothelioma.

Its widespread use before 1973 represents a problem of immense proportions to occupants and owners of buildings. Experts have agreed that there is no safe level of exposure to asbestos fibers.

The potential for fiber release from asbestos containing materials depends in part upon the characteristics of the material that contains the asbestos. For example, soft, crumbly materials tend to release fibers more easily than hard cementitious materials. These characteristics make asbestos an unusual environmental contaminant.

It should be noted that the presence of ACM in a building does not necessarily constitute an eminent health hazard. However, it is critical to recognize that all ACM's have the potential to release asbestos in the air if the ACM is damaged, disturbed or allowed to deteriorate.

DISCLAIMER

The inspection covers only those areas noted in this report and attached lab results. There was no safe access to the crawl space at the time of inspection so no testing in the crawl space could be performed.

The contents of the report are accurate to the best of our knowledge and in accordance with federal, state and local guidelines. All statements are the preparer’s professional opinion and are based on a visual inspection wherever that was possible.

It does not include any areas not actually seen, or capable of being seen, nor any area that we were not provided access to. It is possible that asbestos may be found behind walls, in sheetrock, on ceiling tiles, joint compounds, floor tiles, linoleum flooring and hidden pipe chases. This report is intended to provide guidelines for remedial asbestos efforts. All measurements should be field verified for bidding purposes.

LOCATION OF ACM

1. Visitor center Right wall top – cement board – 12.00%, 13.00% chrysotile

FINAL NOTES

This report represents the opinion of the reporting asbestos inspector at the time of the asbestos assessment survey. If you have any further questions, or if additional information is needed please do not hesitate to call.

Sincerely, Scott Gressin

NYS EPA Asbestos Inspector #07-07380

Professional Building Inspectors Inc. NYS Asbestos Handling Lic # 28450

EMSL Analytical, Inc.

528 Mineola Avenue Carle Place, NY 11514

Tel/Fax: (516) 997-7251 / (516) 997-7528 http://www.EMSL.com / carleplacelab@emsl.com

061927119EMSL Order:

Customer ID: PBI21

Customer PO:

Project ID:

Attention: Phone:Scott Gressin (631) 897-5872

Fax:Professional Building Inspectors, Inc. (631) 474-1727

Received Date:6 Julia Circle 12/10/2019 3:09 PM

Analysis Date:East Setauket, NY 11733 12/10/2019 - 12/11/2019

Collected Date: 12/09/2019

Project: 20 Sagamore Hill Rd, Oyster Bay, NY / Collected By: Mark Vascak

Test Report:Asbestos Analysis of Bulk Material

Test Color

Analyzed

Date Fibrous Non-Fibrous Asbestos

Non-Asbestos

Sample ID 1 Description Visit Cntr Ceiling - Sheetrock

061927119-0001 Homogeneity Homogeneous

PLM NYS 198.1 Friable Gray None Detected12/10/2019 6.00% Cellulose 13.00%

75.00%

6.00%

Ca Carbonate

Gypsum

Non-fibrous (other)

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Sample ID 2 Description Kitchen - Sheetrock

061927119-0002 Homogeneity Homogeneous

PLM NYS 198.1 Friable Gray None Detected12/10/2019 5.00% Cellulose 8.00%

75.00%

12.00%

Ca Carbonate

Gypsum

Non-fibrous (other)

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Sample ID 3 Description Bathroom Wall - Sheetrock

061927119-0003 Homogeneity Homogeneous

PLM NYS 198.1 Friable Gray None Detected12/10/2019 6.00% Cellulose 8.00%

75.00%

11.00%

Ca Carbonate

Gypsum

Non-fibrous (other)

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Sample ID 4 Description Bathroom Wall - Joint Compound

061927119-0004 Homogeneity Heterogeneous

PLM NYS 198.1 Friable Brown/ White None Detected12/10/2019 85.00%

4.00%

11.00%

Ca Carbonate

Mica

Non-fibrous (other)

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Initial report from: 12/11/2019 14:14:13

Page 1 of 6ASB_198x_0009_0001 Printed 12/11/2019 2:14:18PM

Tel/Fax: (516) 997-7251 / (516) 997-7528 http://www.EMSL.com / carleplacelab@emsl.com

061927119EMSL Order:

Customer ID: PBI21

Customer PO:

Project ID:

Test Report:Asbestos Analysis of Bulk Material

Test Color

Analyzed

Date Fibrous Non-Fibrous Asbestos

Non-Asbestos

Sample ID 5 Description Office Wall - Joint Compound

061927119-0005 Homogeneity Homogeneous

PLM NYS 198.1 Friable White None Detected12/10/2019 89.00%

2.00%

9.00%

Ca Carbonate

Mica

Non-fibrous (other)

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Sample ID 6 Description Office Wall - Sheetrock

061927119-0006 Homogeneity Homogeneous

PLM NYS 198.1 Friable Gray None Detected12/10/2019 2.00%

<1.00%

Cellulose

Glass

75.00%

10.00%

13.00%

Gypsum

Non-fibrous (other)

Quartz

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Sample ID 7 Description Visit Cntr Right Wall Top - Cement Board

061927119-0007 Homogeneity Homogeneous

PLM NYS 198.1 Friable Gray12/10/2019 None 70.00%

17.00%

Ca Carbonate

Non-fibrous (other)

13.00% Chrysotile

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Sample ID 8 Description Visit Cntr Right Wall Top - Cement Board

061927119-0008 Homogeneity Homogeneous

PLM NYS 198.1 Friable Gray12/10/2019 None 75.00%

13.00%

Ca Carbonate

Non-fibrous (other)

12.00% Chrysotile

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Sample ID 9 Description Bath Left Wall - Wall Tile Grout

061927119-0009 Homogeneity Homogeneous

PLM NYS 198.1 Friable White None Detected12/10/2019 35.00%

22.00%

43.00%

Ca Carbonate

Non-fibrous (other)

Quartz

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Page 2 of 6ASB_198x_0009_0001 Printed 12/11/2019 2:14:18PM

Tel/Fax: (516) 997-7251 / (516) 997-7528 http://www.EMSL.com / carleplacelab@emsl.com

061927119EMSL Order:

Customer ID: PBI21

Customer PO:

Project ID:

Test Report:Asbestos Analysis of Bulk Material

Test Color

Analyzed

Date Fibrous Non-Fibrous Asbestos

Non-Asbestos

Sample ID 10 Description Bath Right Wall - Wall Tile Grout

061927119-0010 Homogeneity Homogeneous

PLM NYS 198.1 Friable White None Detected12/10/2019 40.00%

22.00%

38.00%

Ca Carbonate

Non-fibrous (other)

Quartz

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Sample ID 11 Description Bath Floor at Left - Floor Tile Grout

061927119-0011 Homogeneity Homogeneous

PLM NYS 198.1 Friable White None Detected12/10/2019 39.00%

19.00%

42.00%

Ca Carbonate

Non-fibrous (other)

Quartz

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Sample ID 12 Description Bath Floor at Right - Floor Tile Grout

061927119-0012 Homogeneity Homogeneous

PLM NYS 198.1 Friable White None Detected12/10/2019 37.00%

18.00%

45.00%

Ca Carbonate

Non-fibrous (other)

Quartz

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Not Analyzed

TEM NYS 198.4 NOB Not Analyzed

Sample ID 13 Description Kitchen Ceiling - 2x3 Acoustic Ceiling Tile

061927119-0013 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB White Inconclusive: None Detected12/11/2019 3.20% Min. Wool 96.80% Other

TEM NYS 198.4 NOB White None Detected12/11/2019 100.00% Other

Sample ID 14 Description Visiting Center - 2x3 Acoustic Ceiling Tile

061927119-0014 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Beige Inconclusive: None Detected12/11/2019 3.50% Min. Wool 96.50% Other

TEM NYS 198.4 NOB Beige None Detected12/11/2019 100.00% Other

Sample ID 15 Description Visiting Center Ceiling - Insulation Tar Wrap

061927119-0015 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Black Inconclusive: None Detected12/11/2019 100.00% Other

TEM NYS 198.4 NOB Black None Detected12/11/2019 100.00% Other

Page 3 of 6ASB_198x_0009_0001 Printed 12/11/2019 2:14:18PM

Tel/Fax: (516) 997-7251 / (516) 997-7528 http://www.EMSL.com / carleplacelab@emsl.com

061927119EMSL Order:

Customer ID: PBI21

Customer PO:

Project ID:

Test Report:Asbestos Analysis of Bulk Material

Test Color

Analyzed

Date Fibrous Non-Fibrous Asbestos

Non-Asbestos

Sample ID 16 Description Kitchen Ceiling - Insulation Tar Wrap

061927119-0016 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Brown Inconclusive: None Detected12/11/2019 100.00% Other

TEM NYS 198.4 NOB Brown None Detected12/11/2019 100.00% Other

Sample ID 17 Description Exterior Front Wall - Siding Felt

061927119-0017 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Black Inconclusive: None Detected12/11/2019 100.00% Other

TEM NYS 198.4 NOB Black None Detected12/11/2019 100.00% Other

Sample ID 18 Description Exterior Rear Wall - Siding Felt

061927119-0018 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Black Inconclusive: None Detected12/11/2019 100.00% Other

TEM NYS 198.4 NOB Black None Detected12/11/2019 100.00% Other

Sample ID 19 Description Roof at Rear Center - Roofing Felt

061927119-0019 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Black Inconclusive: None Detected12/11/2019 100.00% Other

TEM NYS 198.4 NOB Black None Detected12/11/2019 100.00% Other

Sample ID 20 Description Roof at Front Center - Roofing Felt

061927119-0020 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Black Inconclusive: None Detected12/11/2019 <1.00% Glass 100.00% Other

TEM NYS 198.4 NOB Black None Detected12/11/2019 100.00% Other

Sample ID 21 Description Roof at Front Center - Roofing Shingle

061927119-0021 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Black Inconclusive: None Detected12/11/2019 <1.00% Glass 100.00% Other

TEM NYS 198.4 NOB Black None Detected12/11/2019 100.00% Other

Page 4 of 6ASB_198x_0009_0001 Printed 12/11/2019 2:14:18PM

Tel/Fax: (516) 997-7251 / (516) 997-7528 http://www.EMSL.com / carleplacelab@emsl.com

061927119EMSL Order:

Customer ID: PBI21

Customer PO:

Project ID:

Test Report:Asbestos Analysis of Bulk Material

Test Color

Analyzed

Date Fibrous Non-Fibrous Asbestos

Non-Asbestos

Sample ID 22 Description Roof at Rear Center - Roofing Shingle

061927119-0022 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Black Inconclusive: None Detected12/11/2019 <1.00% Glass 100.00% Other

TEM NYS 198.4 NOB Black None Detected12/11/2019 100.00% Other

Sample ID 23 Description Roof at Rear Left at Left - Roofing Membrane

061927119-0023 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Black Inconclusive: None Detected12/11/2019 100.00% Other

TEM NYS 198.4 NOB Black None Detected12/11/2019 100.00% Other

Sample ID 24 Description Roof at Rear Left at Right - Roofing Membrane

061927119-0024 Homogeneity Homogeneous

PLM NYS 198.1 Friable Not Analyzed

PLM NYS 198.6 VCM Not Analyzed

PLM NYS 198.6 NOB Black Inconclusive: None Detected12/11/2019 100.00% Other

TEM NYS 198.4 NOB Black None Detected12/11/2019 100.00% Other

Page 5 of 6ASB_198x_0009_0001 Printed 12/11/2019 2:14:18PM

Tel/Fax: (516) 997-7251 / (516) 997-7528 http://www.EMSL.com / carleplacelab@emsl.com

061927119EMSL Order:

Customer ID: PBI21

Customer PO:

Project ID:

Test Report:Asbestos Analysis of Bulk Material

The samples in this report were submitted to EMSL for analysis by Asbestos Analysis of Bulk Materials via NYS ELAP Approved Methods. The reference number for these samples is the EMSL Order ID above. Please use this reference number when calling about these samples.

Report Comments:

Sample Receipt Date:

Analysis Completed Date: Analysis Completed Time:

Sample Receipt Time:12/10/2019 3:09 PM

12/11/2019 12:53 PM

Analyst(s):

Carly Ciano PLM NYS 198.1 Friable (12) Omatie Ramrattan-Scarallo PLM NYS 198.6 NOB (12)

Rosemary Ortega TEM NYS 198.4 NOB (12)

Samples reviewed and approved by:

Daniel Clarke, Asbestos Laboratory Manager or Other Approved Signatory

NOB = Non Friable Organically Bound N/A = Not Applicable VCM = Vermiculite Containing Material

-In New York State, TEM is currently the only method that can be used to determine if NOB materials can be considered or treated as non-asbestos containing.

All samples examined for the presence of vermiculite when analyzed via NYS 198.1.

-NYS Guidelines for Vermiculite containing samples are available at http://www.wadsworth.org/labcert/elapcert/forms/VermiculiteInterimGuidance_Rev070913.pdf EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by

EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client.

Samples were received in good condition unless otherwise noted.

This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. This report may contain data that is not covered by the NVLAP accreditation.

Samples analyzed by EMSL Analytical, Inc. Carle Place, NY NYS ELAP 11469

Page 6 of 6ASB_198x_0009_0001 Printed 12/11/2019 2:14:18PM

OrderID: 061927119

OrderID: 061927119

20 Sagamore Hill Road, Oyster Bay, NY

No safe access to crawl space

STATE OF NEW YORK. DEPARTMENT OF LABOR

SCOTT M GRESSIN

crASS(EXPTRES)

D rNSP(os/2o)

MUST BE CARRIED ON ASBESTOS PROJECTS

ffi h:/

!o

=d-=

EYBS BLT'

EAIR BRO

Eqr 5' 11n lilr lllrlr il I Lllillillt lil

IF FOT'ND RETIURN TO:

ITISDOI. - L&C UNIT

ROOU 151A, BUII.DING 12

STATE OEFICE CA}.TPIUS

AI,BA}IY NY 12240

New York State – Department of Labor Division of Safety and Health License and Certificate Unit State Campus, Building 12

Albany, NY 12240

ASBESTOS HANDLING LICENSE

Professional Building Inspectors, Inc.

6 Julia Circle

East Setauket, NY 11733

FILE NUMBER: 07-0391

LICENSE NUMBER: 28450

LICENSE CLASS: RESTRICTED

DATE OF ISSUE: 10/21/2019

EXPIRATION DATE: 10/31/2020

Duly Authorized Representative – Scott Gressin:

This license has been issued in accordance with applicable provisions of Article 30 of the Labor Law of New York State and of the New York State Codes, Rules and Regulations (12 NYCRR Part 56). It is subject to suspension or revocation for a (1) serious violation of state, federal or local laws with regard to the conduct of an asbestos project, or (2) demonstrated lack of responsibility in the conduct of any job involving asbestos or asbestos material.

This license is valid only for the contractor named above and this license or a photocopy must be prominently displayed at the asbestos project worksite. This license verifies that all persons employed by the licensee on an asbestos project in New York State have been issued an Asbestos Certificate, appropriate for the type of work they perform, by the New York State Department of Labor.

Eileen M. Franko, Director SH 432 (8/12) For the Commissioner of Labor

File details come from the government source that posted it. Updated .