This document is an Amendment 0002 containing Requests for Information (RFIs) and Government Responses for the BLVR Ethernet Security Install project at Blackstone River Valley National Historical Park (Solicitation 140P4326Q0030). The RFIs address technical and logistical questions regarding fiber and ethernet installation, camera mounting, and electrical work across multiple buildings, primarily Slater Mill and Wilkinson.
Key government-approved decisions include: fiber link conduit installation in attic space alongside existing conduit; ethernet outlet installation (not camera) per Exhibit 10; elimination of one of ten (x4) locations in room 208; deferral of existing cable demolition until new network links are operational; consolidation of Verizon Fiber connection to a single ethernet cable run from the closet to the copier area; removal of shelves and brackets in area 209 by National Park Service; cable routing in attic and mini-hallway spaces behind office walls in Wilkinson building; dusk-to-dawn floodlight installation with removal of existing emergency floodlight; conduit installation in stairwells; molding installation for ethernet cables and outlets on the 2nd floor of Wilkinson; and an additional dedicated electrical outlet for the network cabinet in room 207 of Slater Mill. Several responses indicate that exact technical details require government approval before work commences, particularly regarding cable routing methods and electrical wire installation paths.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4326Q0030_Amd_0002.pdf | ||
| Attachment_5-Security_Camera_Models_Locations_0002.docx | DOCX document | |
| Attachment_3_-_RFIs_1-6_0001.pdf | ||
| Sol_140P4326Q0030_Amd_0001.pdf | ||
| Sol_140P4326Q0030.pdf | ||
| B08_Statement_of_Work.pdf | ||
| B03_Attachment_2_-_SCA_Wage_Determination_2015-4083_Rev_33.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLVR Ethernet Security Install, 140P4326Q0030 Amendment 0002 RFIs 7- 21
Exhibit 1
7. Can we run the Fiber Link in the attic space (Slater Mill)?
Government Response: Yes, you can. Make sure that the new conduit is installed alongside the existing ones.
Exhibit 10 (for exhibit 4, it is an ethernet outlet; not camera)
8. Can we mount the camera on the beam?
Government Response: No, you cannot. We will figure out another way to mount the camera.
Exhibit 7
9. Confirm that 1 of the 10 (x4) locations has been eliminated in room 208.
Government Response: Confirmed
10. Demo of the existing cables to take place after the new Network links are operational. Government Response: Confirmed
11. Extend both Verizon Fibers from the closet on the 2nd floor to the new Network Cabinet on the copier area.
Government Response: The Verizon Fiber and its black box can remain in the closet. We will only need to run one ethernet cable from the closet to the copier area.
12. National Park Service to remove all material from shelves as well as brackets and shelves in area 209.
Government Response: We can do that.
Exhibit 8
13. Can we run cables in the attic and in the mini hallway behind each office wall (Wilkinson building)?
Government Response: Yes, you can. Although, exact details of how cables will be run need to be determined and approved before work can begin.
Exhibit 10
14. Can we mount the camera on the beam (Slater Mill)?
Government Response: See the answer above.
Exhibit 11
15. Can we mount the camera on the beam (Slater Mill)?
Government Response: See the answer for Exhibit 10.
Exhibit 13 (Slater Mill)
16. Is this new flood light a ON dusk to dawn type light?
Government Response: Yes, it should be.
17. Remove the existing emergency flood light or keep it?
Government Response: Remove existing emergency flood light and install new one.
Exhibit 14 (Wilkinson)
18. Can we run conduit in the stairwell?
Government Response: Yes, you can. Although, exact details of how cables will be run need to be determined and approved before work can begin.
Exhibit 16 (Wilkinson)
19. Can we run conduit in the stairwell?
Government Response: Yes, you can. Although, exact details of how cables will be run need to be determined and approved before work can begin.
20. Adding more molding (above the existing electrical outlets) on the 2nd floor of Wilkinson for ethernet cable and outlets?
Government Response: Yes, to adding more molding for ethernet outlets. Although, exact details of how cables will be run need to be determined and approved before work can begin.
21. Add an additional dedicated electrical outlet on the 2nd floor of Slater Mill in room 207 for the network cabinet?
Government Response: Yes, although, exact details of how electrical wires will be run need to be determined and approved before work can begin.
Attachment:
Security Camera Models location