Scope of Work Summary: Roll-Off Construction Dumpster Services
This is a Statement of Work (SOW) prepared by the United States Department of the Interior, National Park Service for roll-off construction dumpster services at Gettysburg National Military Park and Eisenhower National Historic Site in Pennsylvania. The contract period runs from March 23, 2026 to March 22, 2027 as the base year, with four option years available. The Contractor must provide delivery, placement, rental, haul-off, and disposal services for 30 cubic yard construction and demolition dumpsters supporting ongoing preservation, rehabilitation, maintenance, and building cleanout activities at both facilities. Dumpsters must be delivered within 48 hours of request (excluding weekends) during normal operating hours (Monday–Friday, 7:00 AM–4:30 PM, excluding Federal holidays), with no more than four dumpsters expected on site at any time. Service duration ranges from several days to four weeks depending on project requirements, with dumpsters removed only upon Government request.
The contract is structured as a firm-fixed unit price per dumpster, with the base price including delivery, placement, rental, haul-off, and disposal for dumpsters containing up to 10,000 pounds (5 tons) of net debris weight. Overweight charges apply as a single flat rate for debris exceeding this limit, supported by certified weight tickets from the disposal facility. Invoicing must occur individually per dumpster through IPP.gov with required documentation including unique sequential identification numbers, delivery and pickup dates, park location, verified weight with attached weight ticket, base charges, and any overweight charges. The Contractor must comply with OSHA safety standards, obtain necessary permits, prevent hazardous material disposal, and coordinate placement to avoid damage to historic resources, roads, utilities, landscaping, and structures. The Contracting Officer's Representative is Brendan W. Middaugh, Supervisory Exhibits Specialist, located at 405 Taneytown Road, Gettysburg, PA 17325 (Cell: 717-253-2478).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4326Q0013_Amd_0001.pdf | ||
| Sol_140P4326Q0013.pdf | ||
| B08_Solicitation_Attachment_2_DOL_Wage_Determination_2015-4259.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
National Park Service Gettysburg National Military Park Eisenhower National Historic Site
1195 Baltimore Pike Gettysburg, PA 17325
Scope of Work Roll-Off Construction Dumpster Services Gettysburg National Military Park (GETT-GNMP)
Prepared by: Brendan Middaugh February 04, 2026
Gettysburg National Military Park (GETT) preserves the historic landscape, structures, and infrastructure associated with the Battle of Gettysburg and related National Park Service facilities. Ongoing construction, preservation, rehabilitation, maintenance, and building cleanout activities generate construction and demolition debris that must be removed and disposed of in a timely and compliant manner.
This contract provides roll-off construction dumpster services to support these activities across Gettysburg National Military Park and Eisenhower National Historic Site. Services shall include delivery, placement, rental, haul-off, and disposal of construction and demolition debris generated during approved Park projects.
1. Project Objectives
a. Period of Performance: 03/23/2026 to 03/22/2027 (FY2026 Base Year with four Option Years)
b. Provide reliable, responsive roll-off dumpster services to support construction, preservation, and maintenance activities throughout the Park. Ensure debris is removed efficiently, safely, and in compliance with all applicable federal, state, and local disposal regulations. Maintain operational flexibility to support multiple concurrent projects at varying locations within the Park.
c. All services shall be performed by qualified personnel and in accordance with applicable codes, regulations, and National Park Service policies.
2. Scope of Work
a. Delivery and Placement:
a. The Contractor shall furnish roll-off construction dumpsters with a nominal capacity of thirty (30) cubic yards. Dumpsters shall be delivered to designated locations within Gettysburg National Military Park and Eisenhower National Historic Site upon request by the Government.
b. Delivery locations will vary depending on project needs and may include maintenance areas, construction staging areas, or other approved locations within the Park. The Contractor shall coordinate placement with the
Government to prevent damage to historic resources, roads, utilities, landscaping, and structures. Dumpsters shall be placed on stable, level surfaces suitable for safe loading and removal.
b. The Contractor shall deliver requested dumpsters within forty-eight (48) hours of receiving a delivery request from the Government (Not including weekends).
c. Use and Acceptable Materials:
a. Dumpsters shall be used to collect mixed construction and demolition debris, including but not limited to construction materials, demolition debris, and furniture or interior contents removed during approved projects.
b. The disposal of hazardous materials is strictly prohibited under this contract.
d. Service Duration and Pickup:
a. Dumpsters may remain on site for periods ranging from several days up to four weeks, depending on project requirements. Dumpsters shall be removed only upon request by the Government. The Contractor shall coordinate pickup and removal to minimize disruption to Park operations. There will be no more than four dumpsters expected on site at any time under this contract.
e. Hours of Operation:
a. Normal Park maintenance operations occur Monday through Friday, 7:00
AM to 4:30 PM, excluding Federal holidays. Dumpster delivery and pickup shall normally occur during these hours. Services outside normal operating hours may be authorized only with prior coordination and approval from the Government.
3. Pricing:
a. This is a firm-fixed unit price contract per dumpster.
b. Included Weight and Overweight Charges.
i. The base dumpster rental price shall include delivery, placement, rental, haul-off, and disposal fees for dumpsters containing up to 10,000 pounds (5 tons) of net debris weight. Disposal weights exceeding this limit shall be subject to the flat-rate overweight charge.
ii. When a dumpster exceeds the included weight limit, the Contractor shall charge the base dumpster rental price plus a single flat-rate overweight charge, as defined in the contract price schedule. Per-ton, per-pound, or variable overweight pricing is not authorized.
iii. All overweight charges shall be supported by certified weight tickets from the disposal facility.
4. Invoicing:
a. Each dumpster shall be invoiced individually. Consolidated or summary invoices are not permitted.
b. Invoices shall be submitted electronically through IPP.gov and shall include, at a minimum:
Unique sequential dumpster identification number Date of delivery Date of pickup Park location from which the dumpster was removed Verified total dumpster weight with attached weight ticket Base dumpster charge
Overweight charge, if applicable (not invoiced separately) Total invoiced amount
Invoices missing required information or documentation may be rejected for correction.
5. Safety Requirements
a. OSHA Compliance: All work will adhere to OSHA guidelines to ensure the safety of all personnel.
b. Personal Protective Equipment (PPE): Appropriate personal protective equipment
(PPE) shall be worn by all contractor personnel as required by OSHA and the nature of the work being performed.
c. The Contractor shall conduct operations in a manner that ensures the safety of Park staff, visitors, and Contractor personnel at all times.
6. Permits and Approvals
a. The Contractor shall obtain any permits required for the work. If no permits are required, the Contractor shall coordinate with the Government to document permit status.
b. All work shall comply with applicable federal, state, and local codes and regulations.
7. Warranty
a. Dumpster services provided under this contract shall be performed in a professional manner consistent with industry standards. The Contractor shall correct, at no additional cost to the Government, any deficiencies attributable to Contractor performance.
8. Modifications or alteration of schedule
a. Any requests for alterations or modifications to delivery, pickup, service timing, or quantity shall be submitted in writing to the Contracting Officer and Contracting Officer’s Representative (COR) for approval prior to implementation.
Contracting Officer Representative
Brendan W. Middaugh Supervisory Exhibits Specialist - Preservation Branch, Structures Contract Officer Representative (COR) Gettysburg National Military Park Eisenhower National Historic Site 405 Taneytown Rd Gettysburg, PA 17325 Cell: 717-253-2478