NAMA WAYSIDE EXHIBITS - LOCKKEEPERS HOUSE
Solicitation number
140P3023Q0056
Issued by

About this file

This document contains questions and answers related to a solicitation for wayside exhibit services for the National Park Service. The solicitation seeks a contractor to plan, design, fabricate, and install fifteen wayside exhibits at the Lockkeepers House, including developing audio description scripts and creating eight tactile maps and fourteen tactile and printed QR code medallions. The period of performance is 560 days. Key details include that the contract will be awarded at lowest price technically acceptable; the NAICS code was changed to include specialty trade contractors to allow more small businesses to qualify as set-aside; and a site visit is included after award.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A RFQ 140P3023Q0056

Q&A - RFP 140P3023Q0056 NAMA WAYSIDE EXHIBITS - LOCKKEEPER'S HOUSE

Question #QuestionQuestion Reference (if applicable)NPS Response
1Is a brand new contract OR if there is (was) an incumbent performing these services.
If not brand new, could you please provide the current / previous contract number?This is a new requirement need. No incumbent contractor.
2Do you have an idea of what size the NPS wants these (15) wayside exhibits to be?All but one panels are 36" x 24". Wayside 049 is 6" x 12". Please reference A06b Attachment B_Starter_Proposal for all panel sizes
3Where we can find the expected award amount for the project or is that determined by the lowest qualifying bid?The basis of award is lowest price technically acceptable (LPTA). The Government does not release the Independent Government Estimate values nor a estimated magnitude. Services do not have a magnitude
4Would you consider changing the NAICS code for this solicitation to either 337212 Custom Architectural Woodwork or 238990 All Other Specialty Trade Contractors? The current code used has a size standard of 8 million; the set-aside requirement for this NAICS code restricts many qualified exhibit fabricators who are certified as small businesses from being eligible to respond.NPS has added NAICS 238990 All Other Specialty Trade Contractors to the solicitation. Potential offerors shall have atleast one (1) of the identified NACIS codes registered with SAM.gov at closing of the soliciation to be considered for award.
5Can you clarify if there is a Project Manager (PM) role for this project? We only see Planner listed.A project manager is not required for this contract. The Planner can perform overall management of the project. The two mentions of "Project Manager" in the SOW have been removed.
6Can the PM and Planner be different individuals?A project manager is not required for this contract. The Planner can perform overall management of the project. Any reference to "Project Manager" within the SOW have been removed.
7States to “create audio description scripts”. Audio description is not listed as a role on the bid sheet template. Can we add this role to the bid sheet?In IV Scope of Work, section E;Audio Describer has been added to the revised bid sheet, revised SOW, and evaluation criteria
8Are there further specifications for the "audio box"? Is the audio box attached to something or free-standing?The audio box is a component to the wayside base. A more common name is Solar Audio Post - Electronics. It shall contain two solar panels, a piezo push button, a player, and a speaker. The housing shall be durable and weatherproof. It shall include a USB Programming Dongle for easy upload of content.
9States to “Create eight (8) Custom Illustrated/UV Cured Tactile Maps (tactile)”. Can you provide more detail about these items? Can photos of precedent examples be provided? Are these being used outdoors or indoors?IV Scope of Work, section FThe illustrated tactile maps shall be designed by the contractor using Adobe Illustrator or equal, measure approximately 15" wide x 24" high, and withstand outdoor conditions and a lot of touching. They will be mounted side by side with the wayside graphics. See two photos to the right.
10States “Fourteen (14) unique tactile and printed QR code medallions to be fastened by the Contractor to the wayside bases”. Is there a preferred type of medallion? Can images of precedent examples be provided?IV Scope of Work, section K, #3No precedent images exist. The medallion should be 3D printed with a UV-LED printer, have tactilely identifiable pattern and a QR code, be approximately 3" x 3", and be printed on a substrate of between 1/16" and 1/8".
11Can the role of project manager be added to the "Definitions" section? Page 1, section III?VIII Travel and Meetings, section AA project manager is not required for this contract. The Planner can perform overall management of the project. The two mentions of "Project Manager" in the SOW have been removed.
12The Bid Sheet spreadsheet does not include the Plan phases of work; should we add those or will you reissue the spreadsheet?B08b Attachment F_Bid SheetThe bid sheet consists of multiple tabs, located at the bottom of the excel workbook, to be completed as provided on the first tab labeled "Instructions". These tabs include the phases of work and labeled as: Draft WE Proposal, Final WE Proposal, Production, Installation, and Closeout. This workbook must be completed and returned in excel format.
13Do the tactile maps and models require braille?Yes, some braille should be included. The amount will not be known until the tactiles are designed but the plan is that braille will only be used for basic information like the title of the tactile, major roads (if applicable), north arrows, etc.
14Can the park send a photo of the horse mounting block?A photo reference of the mounting block can be located in A06b Attachment B_Starter_Proposal, page 12 (049) at the bottom center of the page. The block is made of concrete, has three half-circular steps, measures approximately 3' tall, 4' wide, 3' deep.
15Will the park provide all historic resource documents for the writer/planner?Yes, this will be provided to the awardee of the contract.
16Does the audio description include any way finding from stop to stop...
OR waysides exhibits only?No.
17Do you envision any testing or prototyping requirements during the development of the tactile models and maps?No.
18Is the Planner expected to draft the audio description script in addition to the exhibit script, or is a specific Audio Describer required?An Audio Describer should be part of the team. Audio Describer has been added to the bid sheet in the Production tab and added to Key Personnel in the Evaluation Criteria.
19Is this estimate within the limitations of the budget?The Government does not release the Independent Government Estimate pricing nor a magnitude. Services do not have a magnitude.
20Are multiple bids required to award?This will be awarded to one (1) responsive offeror who is deemed to be lowest price technically acceptable in accordance with the solicitation basis of award process.
21Are there more specifications on the requirements for the UV-cured tactile maps?The term of art is UV-LED printing. A UV-LED printer prints onto any surface using photo-reactive inks that solidify once exposed to the unidirectional UV light which is part of the printer.
22Does the government already have a vendor they use for the UV-cured tactile maps?It is the responsibility of the offeror to obtain any sub-contractors or vendors should it be applicable to the offerors proposal.
23Are these tactile maps intended to be digitally printed or is there a limited color pallet on each one (four colors or less)?The tactile maps shall be printed using a UV-LED printer that also includes at least four colors (CMYK) to produce a virtually unlimited amount of colors. The color pallets shall be determined during the design of the tactiles but will most likely not be limited to four colors.
24Is the image intended to be subsurface or is the illustration on the surface?All images on wayside panels are part of the graphic that is embedded in powder coating.
25Is there an expected lifespan for the tactile maps?2 years.
26Does the park have a specified style for the illustrations?Semi-realistic, watercolor, muted color palette,
27Does the park have a recommended vendor for the Infrared Beacons?It is the responsibility of the offeror to obtain any sub-contractors or vendors should it be applicable to the offerors proposal.
28Will the government program the beacons to work with the smartphone app?Yes, NPS will be responsible for the programming of the final approved and accepted beacons.
29Why does the QR Code need to be tactile? Can this simply be an embedded graphic?The QR Code does not need to be tactile but there should be a tactilely identifiable element to the medallions so that people who are blind or who have low vision can identify the medallion.
30Is there special permitting that is required for installation in Washington D.C.?No.
31Are there any compliance issues with drilling into the ground?No. All waysides shall be mounted to existing exposed aggregate which does not need compliance to be drilled into.
32During which stage or stages of work should the AD scripts be developed?(Item IX.)Production Phase.
33How many stages of development are anticipated for AD scripts?Production Phase.
34How much time in the project schedule should be provided for the government to record and load the audio?(Item IV.E.)30 calendar days.
35Is the period of performance flexible? Can 60 days be added to accommodate AD script development and government recording?Yes. The Period of Performance has been extended to 560 days.
36Does the government have a preferred payment schedule by deliverable or should the contractor propose a payment schedule?The payment schedule should mirror the phases of work; Draft WE Proposal, Final WE Proposal, Production, Installation, and Closeout.
37Site Visit: Can you confirm that a site visit is included? (a site visit is listed in the SOW, but the Solicitation document notes “ SITE VISIT: No site visit is anticipated for this solicitation.”(Item VIII. B)The site visit mentioned on page 8 of 12 (VIII. B.) is referencing the site visit requirement to be conducted as part of the work after award to a successful offeror
ADDITIONAL APPROVED QUESTIONS (B09 PART 2 - AMENDMENT 0003)
38FACTOR 4 Past Performance

Do you expect that to be one page with 3 projects or can this be 3 pages?

I am not sure if this needs to be included in the 15 page total page count for the Technical Proposal ….as the Key Personnel is not included Solicitation B08 Continuation of SF-1449, Factor 4 Past Performance Per the solicitation B08 Continuation of SF-1449, the past performance is part of Volumn II - Technical Proposal. Only exclusions to the 15 page count are submissions of the Key Personnel and anything identified for/as Volumn I - Business Proposal and Volumn III - Pricing Proposal image1.jpeg