This document is an Amendment (0001) to Solicitation 140P2125R0055 for an Audiovisual (AV) System Upgrades project at Everglades National Park. The amendment incorporates responses to 13 vendor questions submitted prior to 7/7/2025, clarifying various technical and submission requirements. Key clarifications include: acceptance of three 2-channel amplifiers instead of 8-channel amps, confirmation that Shure wireless mic charging stations and batteries are to be included, permission to submit multiple emails for large files, and confirmation that not all eight labor categories must be individually filled.
The solicitation involves upgrading AV systems for the visitor center theater, donation board, and multi-purpose room, with the government maintaining flexibility on contractor staffing and technical details. Vendors are allowed to visit the site at their own expense, though no official site visit is mandated. The government created the specifications and cost estimate internally, and will not modify the current NAICS classification. Closeout documents will be sent to the Contracting Officer's Representative office in Harpers Ferry, WV, which is unrelated to the project's physical location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P2125R0055_Amd_0002.pdf | ||
| Sol_140P2125R0055.pdf | ||
| Attachemnt_A_-_Standard_Specs_for_AV.pdf | ||
| Attachment_C_-_Donor_Board_Specs.pdf | ||
| Attachment_D_-_EVER_Cost_Estimate_Form.xlsx | XLSX spreadsheet | |
| Attachment_B_-_Ernest_F_Coe_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2125R0055 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PHF
Harpers Ferry WV 25425 IDC Building 67 Mather Place DOI, NPS, HFC - Acquisition Managem
PWA
Denver CO 80225 P.O.Box 25287 MS WCP NPS, WASO - WCP Contracting
06/26/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/26/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment (001) is to incorporate responses from the questions that were due from interested offerors on 7/7/2025.
All other terms and conditions of this solicitation remain unchanged.
//END OF AMENDMENT//
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Tavis Salas
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Requests for Information (RFI) for Solicitation 140P2125R0055: EVER – AV System Upgrades
1. How many amp channels are required? Pg. 6 Audio Section 1.10.c requests 3 QSC MP-A80V.
(Note. These are 8 channel amps. Do we need three 2 channel amps instead?)
Answer: Three 2-channel amps is acceptable.
2. Should the Shure wireless mic charging station and rechargeable batteries be included with the wireless mic systems?
Answer: Yes.
3. Could the Government, please, clarify if the intent is to submit multiple emails - each referring to the specific Volume (e.g., VOLUME I - TECHNICAL CAPABILITY) and/or Factor (e.g., Factor B - Samples of Work) ----
For example:
Email #1: Solicitation Number 140P2125R0055 - EVER - AV System Upgrade; VOL I (Tech); Factor A (Technical Capability) and C (Facilities and Equipment) Email #2: Solicitation Number 140P2125R0055 - EVER - AV System Upgrade; VOL I (Tech), Factor B (Samples of Work) #1 Email #3: Solicitation Number 140P2125R0055 - EVER - AV System Upgrade; VOL I (Tech), Factor B (Samples of Work) #2
Answer: Yes. Multiple emails may be sent ONLY if files are too large to fit into each of the 4 respective volumes. If they are properly identified and reference the correct Volume, they will be evaluated as such.
4. Could the government, please, confirm if more than one vendor SME is able to attend the post-award site visit?
Answer: Yes.
5. As a Federal contractor, all of our contracts contain clauses that expressly prohibit photography of any/all equipment and/or government-owned facilities. Will the government accept contact information (i.e.., phone # and email address) for Contracting Officer(s) and/or Contracting Officer's Representative(s), in lieu of the requested images?
Answer: Any requests for information may be deferred to the Contracting Officer’s Representative, and they will coordinate that handling with the Contracting Officer.
6. As a Federal contractor, all of our contracts contain clauses that expressly prohibit sharing/distribution of any/all documentation related to all government-owned systems/equipment. Will the government accept contact information (i.e.., phone # and email address) for Contracting Officer(s) and/or Contracting Officer's Representative(s), in lieu of the requested documentation?
Answer: Answer: Any requests for information may be deferred to the Contracting Officer’s Representative, and they will coordinate that handling with the Contracting Officer.
Requests for Information (RFI) for Solicitation 140P2125R0055: EVER – AV System Upgrades
7. Could the government, please, confirm if vendors may propose a single resource to serve in multiple roles (as specified by the solicitation) -- i.e., a Project Manager that also serves as our Systems Designer, Draftsman, Lead/Chief Installation Technician, Shop Foreman, and Shop Fabricator?
Answer: That is up to the offeror. Please bear in mind that effective and timely management of these key positions are key contractual requirements.
8. Could the government, please, confirm that all eight (8) labor categories are not required to be individually filled for this solicitation?
Answer: Not all of the labor categories are required. Offerors’ price sheets should reflect only what they would assume is required.
9. Will the Government allow a site visit before 7/24?
Answer: A site visit is not required for this project. However, firms may visit the site at their own expense and leisure and will be separate from the Government. Any costs or time incurred doing so is solely at the contractor’s discretion. POCs at the location will not be available to accommodate visits or answer any technical questions pertaining to the solicitation.
10. Will you consider changing the NAICS to an employee count for small business, e.g. - 750 employees or less?
Answer: The Government has taken this into consideration and does not wish to change the NAICS at this time.
11. The specs mention Harper Ferry in WV. Is that a basis of design or reference point for the Everglades project?
Answer: Harpers Ferry, WV is where the COR office is located and has no bearing on the EVER project other than where closeout documents will be sent once the project is completed.
12. Who put the specifications together?
Answer: Specifications are put together by the Government’s technical personnel.
13. Did an incumbent contractor compile the cost estimate form or is that the government’s document?
Answer: The cost estimate form is created by the Government’s technical personnel.