Attachment_E_Cost_Estimate_Form_SAAN_Wayside_Install.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 140P2124R0009
About this file
This document is a cost estimate attachment for the removal and installation of wayside exhibits at San Antonio Missions National Historical Park. The National Park Service is soliciting proposals under solicitation number 140P2124R0009 to remove 31 existing wayside exhibits and assemble and install 83 new wayside exhibits at the park. The cost estimate breaks down anticipated costs for project management, project closeout, shipping, installation, and travel. It estimates no costs for project management, project closeout, or shipping. Installation is estimated to cost an amount for miscellaneous materials and labor costs for a project manager, exhibit specialist fabricator, and laborers. Travel costs include estimated amounts for airfare, per diem in San Antonio, Texas, rental car and gas, lodging in San Antonio, and miscellaneous travel expenses. The total estimated cost is $0 once individual line items are rounded.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Estimate Attachment E San Antonio Wayside Removal and Installation Cost Estimate Estimate
| PROJECT MANAGEMENT | $0.00 | |
| PROJECT CLOSEOUT | $0.00 | |
| SHIPPING | $0.00 | |
| INSTALLATION | $0.00 | |
| TRAVEL | $0.00 | |
| TOTAL | $0.00 | |
| Rounded to | $0 |
| PROJECT MANAGEMENT (excluding travel) | |||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| PROJECT CLOSEOUT | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| miscellaneous | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Packing tools | $0.00 | ||||
| Shipping | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Spec - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
INSTALLATION
MATERIALS: qty. unit unit cost amount
Misc. concrete, weights, and equipment rental $0.00
TOTAL MATERIALS $0.00
| LABOR (31 removed, 83 wayside exhibits assembled and installed) | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| Exhibit Spec - Fabricator | hours @ | $0.00 | |||
| laborer | hours @ | $0.00 | |||
| laborer | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Installation $0.00
TRAVEL
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | job @ | $0.00 | |||
| per diem (San Antonio, TX) | days @ | $0.00 | |||
| Lodging (San Antonio, TX) | days @ | $0.00 | |||
| Rental car and gas | days @ | $0.00 | |||
| Misc. | job @ | $0.00 |
Total Travel $0.00