This solicitation package describes a non-time critical removal action to clean up a former firing range in Redwood National Park. The contractor will implement an NTCRA work plan to remove approximately 1,840 tons of contaminated soil, transport it to appropriate disposal facilities, collect confirmation samples, conduct limited site reconditioning, and prepare completion documents. Additional details include conducting pre-design investigation, laboratory analysis of soil samples, and preparing required reports. Proposals are due by the date specified in the solicitation for this best value procurement set aside for Service-Disabled Veteran-Owned Small Businesses. The work will be performed under a single firm-fixed price contract subject to wage requirements. The estimated contract value is between $500,000 and $1,000,000. The solicitation and amendments will be posted on SAM.gov and proposals must be submitted electronically by the due date.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Removal of Impacted Soil at Alder Camp Road Firing Range Attachment 4b: Clarifications 20 - 21
Redwood National Park
Clarifications 20 – 21 for Solicitation #140P2124R0008
Amendment 2 posted on 2/2/24
Questions 1 – 19 were answered in Attachment 4a.
Questions from prospective offerors received by 1/30/24
20. Regarding the NPS-provided fill in Statement of Work (SOW) 7.3.1, are there any site restoration or stormwater BMPs requirements to be implemented at the borrow site?
a. No stormwater BMPs or site restoration is required at the borrow sites. Contractor is expected to maintain existing conditions at borrow sites. Fill is stockpiled in piles at sites accessible for loading.
b. Contractor will be required to coordinate with NPS staff to schedule site access behind NPS locked gates.
21. Will the RCRA soil in CLIN 6 require stabilization at the landfill prior to disposal or will it meet LDR requirements and be suitable for direct disposal?
a. This is unknown. On-Site stabilization is not allowed. Stabilization at the landfill depends on the landfill’s requirements and the waste profile, after the contractor follows the waste characterization process in SOW Section 6.5.2.