B09_Q_A_V1_12_5_25_YOSE_215363_Replace_TM_WWTP_251112_0003.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- YOSE 215363 - Replace Tuolumne Meadows WWTP
- Solicitation number
- 140P2026R0001
About this file
This document is a Request for Information (RFI) and Questions and Answers (Q&A) file for the Yosemite National Park's Tuolumne Meadows Wastewater Treatment Plant (WWTP) replacement project. The document contains multiple technical clarification requests from the architectural and engineering (AE) team regarding specific design details, including pipe materials, valve types, duct insulation, structural elements, and construction specifications. Key queries cover topics such as pipe schedules, material specifications, concrete reinforcement, stair dimensions, and penetration details for precast structures.
The federal contract opportunity involves replacing the existing WWTP at Yosemite National Park, with a project scope that requires construction during limited seasonal access (June 15 to October 15 each year) over an anticipated six-year period. The solicitation requires offerors to demonstrate project experience with activated sludge process facilities in municipal wastewater applications, specifically for facilities with a design capacity between 10,000 and 60,000 gallons per day. Proposal requirements include submitting project experience documentation, past performance questionnaires, key personnel resumes, and a project schedule, with the contract administered by the Department of the Interior National Park Service.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| YOSE 215636 Replace Tuolumne Meadows Waste Water Treatment System RFI | ACTION | RESPONSE | Version 1 |
| Drawing 01G025 Piping Schedule appears to have several system and material details cut off or missing. Please provide the complete pipe schedule. | AE | Posted 12/5/2026 | |
| 09 96 00 - Please confirm if rigid galvanized conduit is to be painted or coated. | AE | ||
| Factor 4 states to submit schedule in MS Project Gantt Chart format. Would it be acceptable to submit the baseline schedule in Primavera? | DSC | Yes | |
| The Pipe Schedule calls out SS Sanitary Sewer Buried Pipe to be Ductile Iron, Bell and Spigot Joint that is Gravity. Per Specification section 33 41 01 Storm Drain Sanitary Sewer and Drainage Piping, it states for Pipe and Fittings to be specified in the Data Sheets following "End of Section" The data sheets call out to be Polyethylene (PE) Profile Wall (Spec Section 33 41 01.07). Please confirm what is the material of the Sanitary Sewer pipe. | AE | ||
| On Sheet 25D302 General note 2 States "ALL BELOW GRADE PIPES MUST BE ENCASED PER DETAIL 0330-016" Does this general note apply to all of the Pages? Please confirm if all Below grade pipes need encasement per Detail 0330-016. | AE | ||
| On Sheet 04Y130, Key Note 9 calls out for 3 locations to be Restrained Ball Valves V300. The drawing symbol for the Valve is shown as a Gate Valve. Please confirm if this is a Ball Valve V300 or a Gate Valve. | AE | ||
| On Sheet 10SD140, they show a 4" RW pipe from the RV Dump station that will go towards the Influent Pump Station. On the yard drawings such as Sheet 04Y130 it call's out the pipe to be a 4" SS. The same goes for the 12" SS from MH-7 to Influent Pump station which is called out as a 12" RW on 10D140. Please confirm correct pipe system, and material for the pipe. | AE | ||
| Drawing 10D140 references Wall Pipe Penetration Details 4027-605 for the SST piping and 4027-607 for the PVC piping penetrating the pre-cast Influent Pump Station. Both of these details specify wall spools/sleeves with weep rings that are typically used in cast-in-place concrete structures. Since this structure is pre-cast, please provide an alternative detail, or guidance, for penetrations into pre-cast structures, such as utilizing a core-drilled penetration with a modular mechanical seal, or a core drilled penetration and grout as shown on detail 3305-730. Please confirm if either a core-drilled hole with link seal or a core-drilled hole with grout is acceptable for the pipe penetrations into the pre-cast Influent Pump Station structure. | AE | ||
| Note 1 of HVAC Drawing 50M130 says to internally line 18" round duct. Note callout is pointing to a duct that has a callout for 16x12 rectangular. Which size and type of duct is correct? | AE | ||
| Spec section 23 07 00 calls for mechanically cooled and heated duct to be insulated. Drawing 50M130 is unclear as to what type of insulation method is to be used particularly in the operations building outside of the process area. Please clarify if insulation is required, and if it is external or internal for supply and exhaust ductwork for all buildings with ductwork. | AE | ||
| Buried System W3 on the Pipe Schedule calls for the material to be PVC, SCH 80. The schedule also refers to specification Section 33 05 01 (Conveyance Piping - General). Specifications 33 05 01.09 for PVC call's out for PVC, C900 DR 18. Since W3 piping is 3" and smaller, please confirm that schedule 80 PVC will be utilized for buried W3 piping. | AE | ||
| Buried W1 System on the Pipe Schedule calls out for ALL buried piping to be PVC, SCH 80 but refers to Specification Section 22 10 11. There is no Specification Section 22 10 11. Please confirm that the specification should be 40 27 00.10 and that the joint type should be solvent welded. | AE | ||
| Pipe Schedule calls out Buried and Encased SA Pipe to be Welded SST and to follow spec section 40 27 00.08. Spec section 40 27 00.08 describes pipe 1.5" and smaller to be threaded or flanged. Please confirm that either welded or threaded joints are acceptable for piping 1.5" and smaller. | AE | ||
| Refer to detail 4027-804. Please provide the thickness of the top bent plate (SST) for the Manual Screen that spans the 1'-6" channel of the Process Building. | AE | ||
| Refer to details 4027-804 and 0553-001. Manual Screen 20-BSCN-120 (sheet 20D133) spans a trench/channel that is indicated to have embedded angle grating support on both sides (Keynote 4 on Sheet 20S130). The embedded angle requires 2" of horizontal bearing (Note 12 Detail 0553-001). Detail 4027-804 shows anchors for Manual Bar Screen to be 1-1/4" away from the edge of the trench/channel, this anchor location will be in conflict with the embedded angle. Confirm that top bent plate needs to be lengthened and provide guidance on anchor clearance from embedded angle or provide required length of top bent plate. | AE | ||
| Refer to detail 0531-016. Provide dimension (width) for top (horizontal) 3/8" plate. | AE | ||
| Refer to detail 0531-016. Provide dimension (height) for vertical 3/8" plate on each side of the internal pre-cast wall. | AE | ||
| Refer to detail 0531-016. Provide horizontal spacing for 3/4" DIA HDG through-bolts. | AE | ||
| Refer to Section D - Sheet 50S302. Confirm that detail 0531-017 does not apply to notch in top of internal pre-cast wall panel for W8 ridge beam blocking. | AE | ||
| Refer to sheets 70S130 and 70S301. Please confirm that 0551-043 is the appropriate Standard Detail to apply for the Stair Landing Support with TOG EL 8614.50 at the Effluent Storage Tank. | AE | ||
| In order to ensure temp chlorine dosing system, Spray Field piping, & Force Main piping meet specs and maintains facility operation, please provide as-builts for the existing Pump House, chlorine system, & Utilities around the sewage ponds. | AE | ||
| Drawings 70Y131 - 70Y133 call out the existing SS Force Main as 6", however the provided as builts call the Force Main out as 4". Please confirm if the existing Force Main is 4" or 6". | AE | ||
| Drawing 08N111 is missing information from the Bill of Materials for 50-LCP-01. Please provide an updated drawing with all Bill of Material information shown. | AE | ||
| Refer to sheet 20S140. The Drawing appears to indicate a ridge beam, with W8x31 outriggers 8” adjacent on both sides, between the outermost trusses and walls 1 and 5 at the East and West ends of the Process Building. None of the other buildings depict a ridge beam in that span. Please clarify whether these ridge beams between the outermost trusses and the walls are uniquely required for the Process Building Roof Framing. | AE | ||
| Refer to Sheet 25S130. The aluminum stairs on the Upper Plan are drawn depicting 18 treads (19 risers), however the dimension/call-out states "14 TREADS @ 11" = 16' 10" - 15 EQL RISERS". 14 treads at 11" each yields a dimension of 12'-10", while 18 treads at 11" each would generate an overall dimension of 16'-6". Please clarify the number of treads, the span per tread, and overall horizontal dimension for these aluminum stairs. | AE | ||
| Refer to sheet 01G011. The table in Concrete Reinforcing note #13 has 2 areas that are unreadable. Please provide updated readable table. | AE | ||
| Drawing 25S130 calls out the top of footing at elevation 8576.83. The section views on sheets 25S301 and 25S302 call out the top of footing at elevation 8574.83. Which elevation is correct? | AE | ||
| Pdf page 79/84 regarding Project Experience states Offeror is to “Specifically describe experience with Activated Sludge Process (ASP) facilities, in municipal wastewater applications, with a design capacity of 10,000 to 60,000 gallons per day.” Will constructed projects with design capacity greater than 60,000 gallons per day be considered relevant? | |||
| Pdf page 79/84 regarding Project Experience states Offeror is to “Specifically describe experience with Activated Sludge Process (ASP) facilities, in municipal wastewater applications, with a design capacity of 10,000 to 60,000 gallons per day.” Does the 10,000 to 60,000 range refer to the WWTP capacity, or the ASP Facility capacity? | |||
| Pdf Page 80/84 regarding past performance, states to “Complete Sections I and II only of the attached Past Performance Questionnaire and forward to your client reference. The reference shall be someone who was substantially involved with the project and can provide a complete, objective assessment of your performance. Direct them to complete and submit the survey to the address and point of contact in paragraph B above by the due date and time for proposal receipt.” If the Offeror has a previously completed PPQ on a form different than that provided, NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE to be specific, must the Offeror request a new PPQ to be completed by its customer and submitted on the NPS form, or will the NAVFAC/USACE form be acceptable? | CO | ||
| Pdf Page 80/84 regarding past performance, states to “Complete Sections I and II only of the attached Past Performance Questionnaire and forward to your client reference. The reference shall be someone who was substantially involved with the project and can provide a complete, objective assessment of your performance. Direct them to complete and submit the survey to the address and point of contact in paragraph B above by the due date and time for proposal receipt.” If the Offeror has previously completed PPQs, must the Offeror request a new PPQ to be completed by its customer and submitted to the address and point of contact in paragraph B, or may the Offeror include these PPQs with its proposal? | CO | ||
| Pdf Page 79/84, factor 2 directs the offeror to submit the provided “Project Experience” form with the requested information. May the Offeror expand this form, or must it be limited to the formatting and three (3) pages provided by NPS? | CO | ||
| Pdf Page 80/84, Factor 4 directs the offeror to submit a schedule narrative and a GANTT Chart. Please confirm there is no page limitation associated with this factor. | CO | ||
| Pdf Page 80/84, Factor 4 states that the Offeror is to “assume access to the site will open on June 15th each year and end on October 15th each year”. Block 11 of the SF 1442 indicates all work to be complete within 2190 calendar days, which calculates to six (6) years. Please confirm it is the intent of this contract that all work be completed within six (6) four (4) month long construction seasons, for a total construction time of 24 months. | |||
| Pdf Page 79/84, Factor 2 directs the Offeror to provide experience at “Construction at remote sites with difficult access, in extreme environmental conditions under limited construction seasons similar to the scope, magnitude, and complexity of this solicitation.” If the offeror does not have experience at remote sites with limited construction seasons, but meets all other experience criteria, will the Offeror’s proposal be evaluated? | CO | the proposal may be evaluated but may increase the RISK in that specific factor. | |
| Pdf Page 80/84 Factor 5 requires the Offeror to submit resumes for key personnel, including Project Executive, Project Manager, Superintendent, On-site Quality Control Specialist, and On-site Safety Specialist. Specification 01 40 00, paragraph 1.5.B.2 details that the QC Supervisor is to ban an individual with a minimum of 5 years combined experience as Project Superintendent, QC Supervisor, Project Manager, Project Engineer or Construction Manager on similar size and type or construction Contracts, AND have at least 2 years experience as QC Supervisor. No resume / experience requirement for a On-Site Quality Control Specialist. Please confirm that the On-site Quality Control Specialist shall meet the same resume / experience requirements of the QC Supervisor. | DSC/CO | ||
| Pdf Page 18 / 84, Special Requirement 3: Key Personnel indicates the Offeror is to provide names for and assign to this project a Project Executive, Project Manager, Job Site Superintendent, Job Site Quality Control Manager, Job Site Safety Manager. Are these names to be furnished with our proposal, and if so within which volume? | CO | ||
| Pdf Page 18 / 84, Special Requirement 3: Key Personnel indicates the Offeror is to provide names for and assign to this project a Project Executive, Project Manager, Job Site Superintendent, Job Site Quality Control Manager, Job Site Safety Manager. These position titles differ from those listed under Factor 5 requiring resume submission with the Offerors Proposal. Please clarify if these are the same personnel, or if there are two sets of personnel to be identified. | CO | ||
| Pdf Page 80/84 Factor 5 requires the Offeror to submit resumes for key personnel, including Project Executive, Project Manager, Superintendent, On-site Quality Control Specialist, and On-site Safety Specialist. Specification 01 35 23, paragraph 1.4.C details Qualifications of the Site Safety Supervisor. No resume / experience requirement for a On-Site Safety Specialist. Please confirm that the On-site Safety Specialist shall meet the same resume / experience requirements of the Site Safety Supervisor. | DSC/CO | ||
| Pdf Page 79/84, Factor 2 - Please confirm that for Offerors belonging to large firms with multiple departments, divisions or Sister Companies, the required Project Experience may be provided by these other departments, divisions and/or Sister companies as long as Offer clearly establishes how the other departments, divisions and/or Sister companies will have meaningful involvement in this project. | CO | Correct as long its clear in the proposal |