B08_Attach_05C_Drawings_Base_Project_25-27_0001.pdf
PDF 2 MB Posted
- Attached to
- YOSE 215363 - Replace Tuolumne Meadows WWTP Federal contract opportunity
- Solicitation number
- 140P2026R0001
About this file
This document is a technical drawing set for the Tuolumne Meadows Wastewater Treatment Plant (WWTP) construction project in Yosemite National Park, dated March 2025. The documents include a detailed Piping Schedule and Area Classification Table for the facility. The Piping Schedule outlines specifications for multiple pipe services including air flow procedures, backwash supply, sanitary sewers, process drains, and various effluent lines, with details on exposure types, materials, sizes, joint types, and coating requirements. The Area Classification Table provides environmental and safety information for different facility areas, categorizing spaces by material selection, NFPA requirements, ventilation needs, and hazard classifications across multiple buildings and operational zones within the wastewater treatment plant complex.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
DESIGNED:
Y O
S E
P L
O T D
A T
E
P L
O T T
IM
E
:5
:2
P
M \0
\1
168247
215363
TUOLUMNE MEADOWS WWTP
YOSEMITE NATIONAL PARK,
CONSTRUCTION
NOT FOR
MARCH 2025
GENERAL
J MINOR
S GARNER
PIPING SCHEDULE
01G025
25 263
S GARNER
R E
E
NI
GN
E L
ANOISSEFORP DERETSI
G
E R
L
ACINAHCE
M
AINROFILAC FO E
TAT
S
DR
ALLI
BOR LEINAD
36246
03/20/2025
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
DESIGNED:
Y O
S E
P L
O T D
A T
E
P L
O T T
IM
E
:2
:1
A
M /1
/2
168247
215363
TUOLUMNE MEADOWS WWTP
YOSEMITE NATIONAL PARK,
CONSTRUCTION
NOT FOR
MARCH 2025
PIPING SCHEDULE
01G026
26 263
S GARNER
R E
E
NI
GN
E L
ANOISSEFORP DERETSI
G
E R
L
ACINAHCE
M
AINROFILAC FO E
TAT
S
DR
ALLI
BOR LEINAD
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
TITLE OF SHEET
CADD
0" 1"
BAR MEASURES 1" LONG
FULL SIZE DRAWINGS = 22"x34"
DESIGNED:
Y O
S E
P L
O T D
A T
E
P L
O T T
IM
E
:4
:5
A
M /4 /2
5 104
168247
215363
TUOLUMNE MEADOWS WWTP
YOSEMITE NATIONAL PARK,
CONSTRUCTION
NOT FOR
MARCH 2025
TABLE
01G027
AREA
CLASSIFICATION
27 263
S GARNER
R E
E
NI
GN
E L
ANOISSEFORP DERETSI
G
E R
L
ACINAHCE
M
AINROFILAC FO E
TAT
S
DR
ALLI
BOR LEINAD
File details come from the government source that posted it. Updated .