This document is a Questions and Answers (Q&A) file for a federal construction project (Solicitation Number 140P2025R0078, CHCU 310250) dated 8-22-2025. The project involves demolition and new construction of residential buildings in a sensitive cultural site, with key specifications including on-site or off-site wood frame modular construction, archaeological monitoring by the government, and limited on-site camping for up to 10 people.
The Q&A covers numerous technical and logistical details, including construction methods, site access, utility connections, hazardous material handling, and personnel requirements. Notable specifications include: contractors must supply their own water for construction, existing utilities will be disconnected, all communication cabling will be new, HVAC and plumbing fixtures are contractor-furnished, and an independent third-party must perform HVAC testing and commissioning. The anticipated Notice to Proceed (NTP) is in October 2025, with the contractor responsible for project scheduling, safety, and quality control. Specific requirements address asbestos and lead abatement, electrical and fire suppression systems, and reuse of salvaged stone from existing masonry walls.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# Question Answer 1 After completing a more thorough review of the drawings and specifications, it appears this project is designed for onsite construction. Will you accept off-site wood frame permanent modular construction built to the same building codes as an alternative delivery method? This methodology will allow for less disruption (people, material deliveries, and equipment) to this very sensitive cultural site, it will also provide better quality control and schedule improvement resulting in lower GCs and earlier use of the facilities.
Yes, both on-site and off-site construction is acceptable
2 Have you considered opting for a modular building as oppose to stick-built? We believe we could be a vital solution that offers you the most for your time and money.
Yes, both on-site and off-site construction is acceptable
3 Will on-site (dry) camping (in RVs) be permitted? Yes, no more than 10 people will be allowed to camp at site. Space will be limited.
4 Please confirm the Government will provide archeological monitoring.
Yes, Govenerment will provide archeological monitoring
5 Assuming proper notification and coordination, when artifacts are encountered and work is stopped, will the project schedule be adjusted? Will the contractor have any recourse for stand-by or shut-down time?
Yes, the project schedule will be adjusted if these activities follow within the critical path
6 Please confirm if water will be available on site. Contractor shall supply own water for construction. Limited potable and non-potable is available for personal use.
7 Modular or panelized building construction was mentioned on the site visit. How should offerors proceed to ensure all are bidding to the same specifications?
Specifications allow for both options to build on-site or off-site.
8 What is to be done with any contents or furniture remaining in the buildings to be demolished?
All remaining furniture and material will be apart of the demolition efforts of the contractors
140P2025R0078, CHCU 310250, Q&A as of 8-22-2025
9 Can the SSHO and QCM positions be "double hatted"? Yes, the superintendent shall be a separate, full time, on-site postion. The site safety specialist and quality control specialist can be the same person if they carry both certifications.
10 The Building Material Hazard Survey identifies asbestos in the 12 x 12 vinyl tiles only in the furnace closets of Buildings 7, 10, and 11. It was observed on the site visit that a wood flooring overlay was installed in all of the buildings. This overlay was likely installed on top of existing vinyl tile which was not tested. Please advise
Please assume vinyl tile is under wood flooring overlay in all units.
11 Is the existing building demolition to be included in CLIN 1—Site Work?
Yes.
12 It was discussed at the site visit that the cultural monitor is not in the general contractor’s scope of work. Please confirm.
Please confirm if you are referencing a cultural monitor or an archeological monitor. Both archeological and cultural monitors not being required by the contractor. Govenerment will provide archeological monitoring
13 Under spec section 01 50 00 – 4, article 2.2.B, it includes details for a Contracting Officers field office and states “Field office shall be a separate structure from Contractor’s office.” Does the government want the contractor to include a separate office for the Contracting Officer in its scope or is the government to provide and maintain this Contracting Officer’s field office?
The Governement field office will be provided by the contractor for the use of the on-site Construction Management Representative (CMR) and government personel when on-site for site visits.
14 Under spec section 01 11 00 – 3, article 1.5.H, it details permission for the contractor to establish a “Construction Camp” in the Park Staff Area. At the site visit, this topic was discussed and the government clarified it was still looking at the details. Please clarify if a construction camp will be allowed for the contractor and if so, to what extent will staff be allowed to stay onsite? Will it be only the contractor’s field supervision team or will subcontractors be allowed to camp onsite as well? Will RVs/campers be allowed?
Yes, no more than 10 people will be allowed to camp. Personal use water is available at the existing Mission 66 housing. Campground near site has a dump station for personal use. Space will be limited. Contractor will be required to contact electrical service provider for temporary electric service paid by the contractor.
15 Under spec section 01 50 00 – 1, article 1.3.B, it states “Water Service: Potable Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs.” At the site visit it was discussed that it is still unclear if there is water available onsite for construction operations. We anticipate needing thousands of gallons of water per day during earthwork activities. Please clarify if there is a water source available onsite for construction operations and if it has the capacity to meet the needs of construction. Also, if there is a source onsite, is it located within the boundaries of the project or another location within the park? If another location, please provide the approximate distance from the water source to the project site.
Contractor shall supply own water for construction. Limited potable and non-potable is available for non-construction use.
16 The solicitation is requiring resumes for the contractor’s project manager, superintendent, on-site quality control specialist, and on-site safety specialist. With a project of this size, is it acceptable to have one individual assume the combined roles of on-site superintendent, quality control specialist, and safety specialist?
No. The intent is that the PM is an off-site position. The superintendent shall be a separate, full time, on-site postion. The site safety specialist and quality control specialist can be the same person if they carry both certifications.
17 Is there an area within the project site or adjacent area where a concrete batch plant would be allowed during construction activities?
The contract shall conduct construction operations within the limits of disturbance and existing road between the demolition homes and new home site.
The contractor may mix/batch material within these areas.
18 Details 4,5,6,7 on sheet A902 (kitchen tower and uppers cabinets) call for ¾” plywood shelves while details 2 & 3 on sheet A902 (base cabinet and island) call for PLAM shelves. Is it the intent to have differing materials?
Intent is to include 3/4" Laminated plywood shelves
19 Cabinets details on sheet A902 call for melamine interiors but PLAM shelf, are finishes to be mismatched?
No finishes intended to match.
20 The cabinet brand specified in the documents does not appear to meet the stated specifications. Please clarify if we should base our bid on brand called out or specifications.
Refer to specification, see salient characteristics.
21 Structural details shown on Drawing S300 (Details 1,2 and 3) are for stick built construction, with the wall structure not connected the flooring system. Detail 2 on A701 shows the same construction detail, with the wall system disconnected from the buildings flooring system.
Please confirm the intent of the project is to provide a modular housing solution?
No, modular design is not proposed. It will be the contractor's responsibility to provide foundation details/specifications submittals for approval if deviating from the provided design. See questions 22 and 23 below
22 If the intention of the project is to provide a modular housing solution in lieu of stick built construction, will the government redesign the foundation to accommodate a modular solution?
No, it will be the contractor's responsibility to provide foundation details/specifications submittals for approval if deviating from the provided design.
23 Will the government allow the contractor to backfill against the modular structure? The Architectural details show a 9" space between grade and the bottom of the wall assembly, but the modular structure will take up most of this space from top of foundation to bottom of wall assembly.
No, modular design is not proposed.
24 The bump out at the front entry of the A unit adds significant cost and complication to a modular solution.
Will the government consider redesigning the unit to remove the bump out and reduce the overall cost to the project? This can be accomplished by extending the plan east wall out to maintain the square footage of the unit and relocating the front entrance to the east as well.
For this soliciation, please match the provided design.
25 Can the existing structure that is not in the rock fall zone be utilized as a construction office?
Once the contractor takes posession of the site, it is their responsibility to conduct work as they assess safety to their work plan. The government will not dictate terms after construction award unless immediate and health and safety and observed per the specifications.
26 Verify that the site is balanced and no import will need to take place and that on-site soils will be acceptable for backfill.
The intent of the design is for the site to have a balanced earthwork scope which requires no import or export of material. On-site soils shall be acceptabl for backfill
27 Confirm that the existing utility connections will be disconnected by NPS before demolition begins?
The governement will suspend electrical service to exsiting meters. If contractor would like to use existing electrical meters/pedestal, then the contractor shall conduct Jimenez electrical to take over meter.
28 Is it acceptable to set up a water storage tank on site of up to 12,000 gallons to be filled ahead of the beginning of construction activities. We would anticipate using at most 3,000 gallons a day during the heavy excavation.
Then the tank can refill as needed when not in use. Give that information will NPS provide access to water for construction purposes from the on site well?
Yes it is acceptable to set up a water storage tank. No the government will not provide water for construction.
29 Can you provide the recharge rate of the onsite water well?
No, the well is not accessible to the contractor for construction activities.
30 There was no attached ‘Project Experience’ form or PPQ form attached to the solicitation. Will the government please provide these forms?
Issued as part of the amendment A0002.
31 Please confirm that prior completed PPQs are acceptable in place of the new PPQ form.
Use PPQ form issued in amendment A0002.
32 Will the Government accept any dual-hating of key personnel roles?
Yes, the superintendent shall be a separate, full time, on-site postion. The site safety specialist and quality control specialist can be the same person if they carry both certifications.
33 Confirm that components of the fire sprinkler (backflow etc.) will be house in the crawl space.
No backflow, water is from a dedicated fire protection service. Drawings indicated that the required components are to be located in the crawl space.
34 Is there any areas where a man camp can be established or can any of the camping spots be allocated for on site staff to be housed? Do the camping spots have electrical, water and sanitary hookups?
Yes, no more than 10 people will be allowed to camp at site. Space will be limited.
One site camping spot is located on north side of existing road that may utilized by contractor. This spot has electrical, water, and sewer available for trailer. All other
35 Given the cultural and historical significance of the area.
Are there any holidays or ceremonies that contractors need to be aware of that would cause any down time?
No, see specification for Government Holidays.
36 Can you clarify what the procedure is to catalogue the salvaged stone mentioned page C-5 Demo Note 6?
The intent is to carefully disasemble stones and store them for reinstallation if a stone wall is selected as a bid additive. Catolaguing stone is just intended for reinstallation purposes to recreate a stone wall.
37 Pages C-22 and C-23 scale appears to be incorrect.
Scale should be 1’=10” but shows 1’=20’. Please confirm that 1’=10’ is correct.
The engineering scale for Sheets C-22 and C-23 should be 1'=10'.
38 Confirm a passive radon system is acceptable. Follow design specified.
39 Based on the Hazard Assessment, only the exposed floor tiles inside utility closets was noted as having asbestos.
During our site walk of the existing buildings the existing flooring consisted of 2-layers of flooring material as seen between the crawlspace access hatch and floor vents in various rooms. Are we to assume the flooring beneath the exposed "floating floor" is also asbestos tile? Likewise are we to assume all of the texture, drywall and window putty is ACM?
Please assume vinyl tile is under wood flooring overlay in all units.
40 Plan C-2 calls out building #16 which is a brick shed behind building #11 (to be demolished). Building #16 appears to be within the landscape protection area, however it is not noted in drawing C-3 or the C-5 drawing for demolition. Is this building to be excluded from abatement and demolition?
Building #16 is excluded from any abatement or demolotion.
41 The hazard assessment report identified asbestos in window putty and lead in various paints on site. These are precisely the types of materials from an at-risk era that are known to potentially contain PCBs which were typically used in construction during the 50's thru the 70's. PCB's were widely used as plasticizers and for durability in materials such as caulking, glazing, sealants, paints and adhesives used for flooring and tiles. Will the base bid or bid alternate require this EPA regulated material be tested by the abatement sub-contractor for site characterization of these materials prior to abatement?
The window putty tested positive for asbestos and should be abated per the provided specification. Paint tested positive for lead and should be abated per the provided specification. No testing of PCB’s is intended for this project.
41 Verify the required R-Value for the roof of each building. Refer to drawings and specifications for the R Value of both the walls and roof system.
42 Is archeological monitoring to be provided by the government or contractor?
Yes, Govenerment will provide archeological monitoring
43 The Division 12 specifications call for solid wood face frames while cabinetry details appear to be frameless cabinetry. Please clarify if desired cabinetry is to be framed or frameless construction.
Follow the specifications, provide Face framed cabinetry.
44 Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?
Yes, the superintendent shall be a separate, full time, on-site postion. The site safety specialist and quality control specialist can be the same person if they carry both certifications.
45 Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
Please bid project to be delivered within the period of performance (POP). The Contracting Officer will determine post award if market conditions will affect the
POP.
46 Please provide the site visit attendee sign in sheet. To be attached as part of the amendment.
47 Are soil boring reports available? If not, it will be assumed that excavation will be clear of rocks and obstructions.
Geotechnical was provided in the solicitation documents. See attachment #5.
48 Is there a bulk water fill i.e. a hydrant or water source we can pump from for construction operations in close proximity?
No. Contractor shall supply own water for construction. Limited potable and non-potable is available for personal use.
49 Please confirm whether asbestos or lead is present on this project, and if so, provide the relevant documentation.
Please see hazardous material report within solicitation package. See attachment #6.
50 Does this project require phasing? Phasing on contractor for means and methods - however, recommendations can be found on D010, note 2.04
51 Is this project tax exempt? No, contractor responsible for all taxes.
52 When do you anticipate on site work starting? Anticipated NTP October 2025 - means and methods on contractor with associated schedule.
53 Are third party inspections required? Please reference Quality Requirements, specification (01 40 00) for required inspections 54 Is permitting required? Please reference document 2024.10.07 CHCU 310250 100% CD Final
Permitting Status Memo.pdf 55 Is any landscaping restoration required for this project?
For example; topsoil, seeding, and fertilizer.
Please reference specification section 32 92 00 and L series drawings
56 Are mock-ups required for the cast-in-place concrete?
And if so, please provide additional details on what is required.
No. Refer to specifications for additional requirements.
57 Please confirm the extent of work for masonry cleaning, repair, & repointing.
No repair of existing masonry walls are specified. Intent is to repoint and clean stone as needed for reinstallation of masonry wall if bid additive selected.
58 Please confirm whether or not dewatering will be required and/or provide additional information regarding the existing water table.
Please reference geotechnical report.
59 Please confirm whether footings can be "neat dug" or if they need to be formed.
please reference specification section 03 30 00 for form requirements
60 Please confirm that mock-ups are not required for specification section 04 43 00 - Stone Masonry.
Mockups required for stone masonry if additive selected.
61 The Hazard Assessment dated October 12, 2022 identifies asbestos-containing materials, lead-based paint, and mercury thermostats in Buildings 6, 7, 10, and
11. Please confirm if this is the most current hazardous materials survey. Have any abatement or remediation activities been performed since the date of the report?
Who is responsible for removal and disposal costs of hazardous materials encountered during construction — the Contractor or the Owner?
Yes, this is the recent survey. No activities have been performed. Contractor responsible for removal.
62 For mercury-containing thermostats noted in the hazard report, please confirm if replacement thermostats are contractor-furnished and what type is acceptable for replacement (digital, programmable, etc.).
Thermostats will be removed and not replaced
63 Please confirm whether existing water supply and pressure are adequate for the new fire suppression systems as designed, or if any offsite/hydraulic upgrades are anticipated.
No offsite hydraulic upgrades are anticipated.
64 Are there any special requirements for fire alarm and sprinkler tie-ins, including work hours, outage durations, or notification procedures to the Park?
Please reference specification division 21 for fire suppression requirements
65 Please confirm if existing water, sewer, and vent connections are to be reused in place or replaced up to a designated point of connection.
See construction documents for what is to be demolished and to remain.
66 Are there any special requirements for coordination with the park’s utility services during shutdowns or tie-ins, including after-hours work or seasonal restrictions?
See specification and electrical requirements.
67 Please confirm if all HVAC equipment is contractor-furnished, or if any items are government-furnished equipment (GFE).
HVAC equipement is contractor furnished
68 Are there temporary heating or cooling requirements during equipment changeover for any occupied units?
New build; temporarty heat provided as requried for construction.
69 Please confirm if all existing branch circuits serving areas to be demolished will be de-energized and removed back to source, or only disconnected at the nearest panel.
Disconnect back to source.
70 For electrical shutdowns impacting occupied areas, please clarify acceptable outage durations and any required temporary power provisions.
See specifications.
71 Please confirm if all communications cabling (data, voice) is to be replaced in full or only where shown on the drawings.
All communication cabling inside residences is new.
72 Are there existing communications service providers on site? If so, please provide contact information for coordination of service cutovers.
Communications contact is in specification Dividion 01 as Frontier.
73 Please confirm if salvaged stone from masonry walls (noted on demolition drawings) is to be reused on this project, and if so, provide installation requirements or acceptance criteria.
As noted on sheet L2.00. details 1, 2, and 4, stone from the masonry walls noted on sheet L1.10 is to be reclaimed and reused on the new walls.
74 For demolition of existing utilities, should all abandoned piping/conduit be fully removed or may they be abandoned in place if capped?
Abandon underground sections of piping / conduits and cap or plug. Cut off anything above finished grade.
75 Please confirm the required duration for fire alarm and sprinkler system outages during tie-ins and whether temporary protection measures are required during those outages.
New build, no temporary protection required
76 Is the use of CPVC piping for residential sprinkler lines acceptable, or must all interior sprinkler piping be metallic?
CPVC is a listed material in the project specification
77 Please confirm if all plumbing fixtures are to be contractor-furnished per specification, or if any will be government-furnished.
All Contractor furnished
78 For water service tie-ins, will the park provide the shutoff/turn-on, or is the contractor responsible for full coordination and execution?
Contractor responsible for full coordiantion and execution. Coordinate with park staff for all shutoff/turn-on.
79 Please confirm whether all new HVAC ductwork is to be fabricated from galvanized sheet metal, or if alternate materials (e.g., aluminum) are acceptable for specific applications such as crawl spaces.
Aluminum would be considered; metal gauge would need to be increased as required by SMACNA duct construction standars for use of aluminium.
80 Please confirm whether TAB (testing, adjusting, and balancing) of HVAC systems is required to be performed by an independent third-party certified contractor, or if the installing contractor may perform the TAB if certified.
Intependent Third Party
81 Are there any arc flash study updates or coordination studies required for the new electrical distribution systems, or will the existing documentation be considered sufficient?
Coordination study required per specification section 262825, 1.5 to be performed under contractor's direction.
82 Please confirm if underground secondary electrical service from the utility to the building is to be replaced in its entirety or only up to the nearest junction point.
Drawing E010 indicates electrical service requirements.
83 Please confirm if the communications backbone cabling between buildings is to be installed in new conduit pathways or if existing pathways may be reused.
New conduit pathways.
84 For data outlets, are faceplate colors and labeling schemes specified by the park or left to contractor standard?
Data outlet faceplate colors and labeling to match receptacle and swiitch faceplate colors.
85 Please confirm if the fire alarm system monitoring connection to the park’s central station is within the scope of this contract.
Yes, requirement for connection to off-site monitoring is shown on drawing E501.
86 Will existing security system wiring and devices be reused, or should all be replaced new to match the new construction?
New to match
87 Please confirm whether commissioning of HVAC systems will be contractor-furnished under this contract or provided by the Government, and if contractor-furnished, whether it must be performed by an independent commissioning agent.
Contractor furnished, independent commissioning agent