Att_10_RFIs_4-1-25_0002.pdf

PDF 127 KB Posted

Attached to
CRLA 245275 - Intelligent Transportation System Federal contract opportunity
Solicitation number
140P2025R0017
Issued by
Department of the Interior National Park Service National Office

About this file

This document is a Request for Information (RFI) for the Crater Lake Intelligent Transportation System project, Solicitation 140P2025R0017, dated April 1, 2025. The RFI contains two key questions and answers addressing technical and scheduling considerations for potential bidders.

The first question addresses the acceptability of precast concrete foundations, with the response specifying that precast foundations are permitted only if anchor bolts are cast into the foundation during fabrication and match the pole manufacturer's base plate hole layout. The second question concerns a bid extension, which was granted, extending the due date to April 23, 2025, at 4:00 pm MDT. The solicitation is being issued by the Department of the Interior National Park Service National Office for an Intelligent Transportation System project at Crater Lake, with specific considerations for extreme weather conditions and construction challenges.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFIs

CRLA 245275 Intelligent Transportation System

Solicitation 140P2025R0017

April 1, 2025

1. Question: Are precast concrete foundations in lieu of cast-in-place acceptable? (Due to the extreme weather conditions and the short work window at Crater Lake, this can allow us to expedite schedule without the longer cure times required for the cast foundations.)

Answer: Precast concrete foundations may be used only if anchor bolts are cast into the foundation during fabrication. Anchor bolt layout needs to match the pole manufacturer's base plate hole layout. Anchor bolts will not be permitted to be installed after fabrication of the concrete foundation.

2. Question: We are respectfully requesting a 2-week bid extension for Solicitation

140P2025R0017 – Crater Lake Intelligent Transportation Systems project if that is at all possible.

Answer: Yes, that’s fine. Due date is now April 23, 2025, 4:00 pm MDT.