B09_Amend_001_RG1486_Big_Thompson_COMPILED_0001.pdf
PDF 4 MB Posted
- Attached to
- ROMO 327127 Bridge Preservation Federal contract opportunity
- Solicitation number
- 140P2024R0146
About this file
This document is a set of bridge drawings and specifications for the rehabilitation of the Big Thompson River Bridge located in Rocky Mountain National Park, Colorado. The key details are:
The drawings include plans, elevations, sections, and details for the repair and replacement of the bridge's deck joints, concrete deck overlay, steel girders and railings. The work involves removing and replacing the existing aluminum railing with a new steel tube-backed timber bridge railing system, repairing the concrete deck, and applying a thin bonded epoxy overlay. Estimated quantities are provided for key pay items such as concrete, reinforcing steel, steel railing, and epoxy overlay. The specifications reference the AASHTO Standard Specifications for Highway Bridges and FHWA Standard Specifications for Construction. The work is to be performed under Federal Contract Opportunity 16efc3b012fb4cd3bace335defc1dd37 for the "ROMO 327127 Bridge Preservation" project, issued by the National Park Service. No additional details on the solicitation, award, or pricing are provided in this document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2024R0146_Amd_0002.pdf | ||
| B09_Amend_002_Questions_and_Answers__0002.pdf | ||
| B09_Amend_002_Addional_Material_Storage_0002.pdf | ||
| B09_Amend_001_PreProposal_Mtg_-_Attendance_report_10-01-24_(1)_0001.pdf | ||
| B09_Amend_001_ROMO_121_60124_Aspenglen_COMPILED_0001.pdf | ||
| Sol_140P2024R0146_Amd_0001.pdf | ||
| B09_Amend_001_PreProposal_Mtg_Transcripts_0001.pdf | ||
| B09_Amend_001_Questions_and_Answers__0001.pdf | ||
| B07_Attach_2__Drawings.pdf | ||
| B08_Attach_1__Specifications.pdf | ||
| Sol_140P2024R0146.pdf | ||
| B08_Attach_8_LmtOnSubconRpt.xlsx | XLSX spreadsheet | |
| B08_Attach_6_PSP_Vol_I_PastPerf.docx | DOCX document | |
| B08_Attach_7_Experience.docx | DOCX document | |
| B08_Attach_3_PriceSchedule.xlsx | XLSX spreadsheet | |
| B08_Attach_4_WD_Larimer_CO20230014_08_02_2024.pdf | ||
| B08_Attach_5_WD_Grand_CO20230013_08_01_2024.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING INDEX:
Measu red alon g gu tterl ine
Measured along gutterline
B ig T h o m p s o n R iv e r
A
PLAN
L
RG2808-F.
joint. See
Replace Abut. 2
See RG2808-H.
hinge near Pier 2.
Replace joint at
See RG2808-G.
hinge near Pier 1.
Replace joint at
See RG2808-F.
Replace Abut. 1 joint.
R=954.93’
C Rdwy.
L
PLAN
C Rdwy.
L
L L
L
L
L
1"= 40’-0"
1’-8" (typ
Pay Limits for Removal of Bridge Railing = 364’-2"
Pay Limits for Removal of Bridge Railing = 366’-3"
R=938.93’
Gutterline
R=968.93’
Gutterline
K. EIKERMANN
Pay Limit for Steel Tube Backed Timber Bridge Railing (Guardrail System SBTC) = 360’-10"
Pay Limit for Steel Tube Backed Timber Bridge Railing (Guardrail System SBTC) = 362’-11"
(See Rdwy. Plans)
(Guardrail System SBTA)
Steel Backed Timber Guardrail
(See Rdwy. Plans)
(Guardrail System SBTA)
Steel Backed Timber Guardrail
"8 116’-7 "8
112’-5
(See Rdwy. Plans)
(Guardrail System SBTA)
Steel Backed Timber Guardrail
(See Rdwy. Plans)
(Guardrail System SBTA)
Steel Backed Timber Guardrail
(typ. @ all 4 corners)
See RG2808-E for transition rail details.
D. CHRISTENSEN 1
DECK JOINT REPAIR - HINGE 2
DECK JOINT REPAIR - HINGES
DECK JOINT REPAIR ABUTS.
TRANSITION RAIL DETAILS
RAIL DETAILS
RAIL NOTES & DETAILS
GENERAL NOTES AND ESTIMATE
PLAN
Drawing Title
H
G
F
E
D
C
B
A
Drawing No.
Measu red alon g C Rdwy.
L
102’-5" "2 177’-7
124’-11"
Begin Bridge @ C Rdwy.
C Pier 1 @ C Rdwy. C Pier 2 @ C Rdwy.
End Bridge @ C Rdwy.
railing or starting construction.
Contractor shall verify all dimensions before preparing shop drawings for bridge at all times. Provide temporary traffic barrier during construction.
Perform joint and railing replacement work in stages to accomodate 1 lane of traffic
Notes: Existing bridge is approximately located between Stations 431+81 and 434+85.
26’-0"
ELEVATION
Fixed hinge
Expansion hinge
Abut. 1 Abut. 2Pier 1
Pier 2 backed timber bridge railing.
(both sides) and replace with steel tube
Remove existing aluminum bridge railing prior to applying overlay.
bridge deck (15" x 15")
Repair area in concrete
Special Contract Requirements.
epoxy overlay. See Section 579 of
" thin bonded8 3approx.
Overlay concrete deck with
See section 563 of Special Contract Requirements.
and all below deck structural steel (Option X only).
Clean and paint steel girders, stringers, diaphragms, NO. SHEETS
REGION STATE PROJECT
SHEET TOTAL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
CO
of 8 RG2808-
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
-J u l-
:5
P
M N
C O r o m o (2
B r id g e R
G C
A D
F il e s D
G N
F il e s p e .d g n
BEAR LAKE ROAD
PRA ROMO 12(2)
KARL EIKERMANN
IMR
BIG THOMPSON RIVER BRIDGE REHAB
ROCKY MOUNTAIN NATIONAL PARK
BEAR LAKE ROAD
LARIMER COUNTY, COLORADO
S
B. ROBINSON
S49
NPS PMIS NO.: 53237
NOVEMBER 2010
GENERAL NOTES AND ESTIMATE
SPECIFICATIONS:
DESIGN: AASHTO Standard Specifications for Highway Bridges, 17th Edition, 2002.
CONSTRUCTION: Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects, FP-03.
DEAD LOAD:
CONCRETE:
REINFORCING STEEL:
Item No. Item Quantity Unit
All concrete shall be structural concrete Class A(AE) with a minimum 28-day compressive strength f’c=4000 psi.
All reinforcing steel shall conform to AASHTO M31 or M322, Grade 60 deformed. The minimum concrete covering to the face of any bar shall be 2 inches, unless shown otherwise on the plans.
GENERAL NOTES:
NOTES:
K. EIKERMANN
NONE
MISCELLANEOUS STRUCTURAL STEEL:
conform to AASHTO M169. Guard angle assemblies shall be galvanized after fabrication.
Structural metal for guard angles shall conform to ASTM A36. Welded anchors for guard angles shall
K. EIKERMANN B2D. CHRISTENSEN
to Subsection 712.01(g).
inch, unless noted otherwise on the plans. Backer rod shall conform to 4 3Chamfer exposed edges of all concrete
56301-2000 Painting Steel Structure All Req’d. Lump Sum(7)
(7)
(6)
(5)
(4)
(3)
(2)
(1)
EPOXY OVERLAY: 3 lbs. per square foot applied to clear deck area.
STEEL TUBE BACKED TIMBER BRIDGE RAILING: 55 lbs. per linear foot.
CONCRETE: 150 lbs. per cubic foot. STRUCTURAL STEEL: 490 lbs. per cubic foot.
Includes cost of surface preparation, coating application and material, disposal of waste, and containment system.
Include repair of concrete deck area (estimated area = 10 square feet).
timber railing, attachment hardware, and drilling and installing epoxy anchors.
Includes cost of furnishing and installing structural steel plates, posts and tubes, included in quantity = 490 lbs.) and reinforcing steel mechanical couplers.
Includes cost of furnishing and installing miscellaneous structural steel for guard angle assemblies (estimated weight
Includes cost of plate removal at expansion joint, and removal of existing joint material as shown on the plans.
(estimated quantity = 37 linear feet).
Includes cost of non-sag silicone joint sealer (estimated quantity = 110 linear feet) and rapid cure silicone sealant
Contract Quantity
ESTIMATE (OPTION X):
61701-4020
57903-0000
55401-1000
55222-0000
55201-0200
20305-1000
20302-0150
Guardrail system SBTC (bridge railing)
Concrete Overlay (Thin Bonded Epoxy Overlay)
Reinforcing Steel
Grout (polymer mortar)
Structural Concrete, Class A (AE)
Removal of Concrete
Removal of Bridge Railing
1.0
2.5
2.5
Linear Feet
Square Yard
Pound
Cubic Feet
Cubic Yard
Cubic Yard
Linear Feet
(5)
(6)
(4)(1)
(2)
(1)
(3)
EXISTING STRUCTURE:
Central Federal Lands Highway Division, Denver, CO, for plans of existing bridge.
See "Big Thompson River Bridge" plans, RG1486, dated July 1959, as prepared by the Federal Highway Administration, PAINTING:
See Section 563 of Special Contract Requirements.
NO. SHEETS
REGION STATE PROJECT
SHEET TOTAL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
-J u l-
:5
P
M N
C O r o m o (2
B r id g e R
G C
A e s D
G N
F il e s p e .d
KARL EIKERMANN
IMR
BIG THOMPSON RIVER BRIDGE REHAB
ROCKY MOUNTAIN NATIONAL PARK
BEAR LAKE ROAD
LARIMER COUNTY, COLORADO
S
B. ROBINSON
S49
2"
1"
3"
NEW RAIL SECTION AT BRIDGE
EXISTING RAIL TYPICAL SECTION NEW RAIL SECTION AT WINGWALL
2"
2’-6"
2"
2’-6"
2’-6"
"2
�"= 1’-0"
"8
RAILING NOTES:
"4 11’-4
"8 38"8
"4 11’-4
"8 38"8
"8
"4 31"8
15"8
"4
& C baseplate
C Post
"8 ty p
" PL8
BASEPLATE DETAIL
RAIL POST BASE SHIM
1" PL
holes (typ.)
C 1" x 3" slotted
11"
"2
L
L
L
C Post
2"
" PL4
detail baseplate
See
"4
POST ASSEMBLY
PL WASHER
rail post
W 6 x 20
(typ.)
in post flange
3C L
L
BRIDGE RAIL NOTES & DETAILS
STEEL TUBE BACKED TIMBER
No Scale
No Scale
No Scale
No Scale
UNLESS NOTED
K. EIKERMANN
C3 hex nut (typ.).
washers (2) and hardened steel curb.
with surface of
Cut bolts flush hole (typ.). See notes.
epoxied in drilled hole (typ.). See notes.
epoxied in drilled
TIMBER: Conform to Subsection 710.08.
ERECTION: Erect the rail parallel to grade. Erect posts normal to grade.
mixture of cement and water mixed to a smooth viscous paste.
NEAT CEMENT GROUT: Provide neat cement grout consisting of a
Rail splices shall be provided between posts with expansion joints.
continuous over a minimum of three posts.
RAIL SPLICE ASSEMBLIES: Section lengths of HSS 4" x 4" rails shall be
ANSI/AASHTO/AWS D1.5, and shall be performed by a certified welder.
locations, and fastener lengths. Welding shall conform to section lengths, splice locations, rail post spacing, filed measured deck joint
CO for approval prior to fabrication. Provide drawings showing rail and vertical alignment of the structure. Submit shop drawings to the
FABRICATION: Structural steel shall be shop fabricated to the horizontal coating the entire length in curb.
so that when rod is inserted in the hole (only once), the rod displaces the epoxy, manufacturer’s recommendations. Place a sufficient amount of gel in the holes drilled holes with Sikadur Injection Gel or CO approved equal. Install per
" fully2
7RAIL CONNECTION: Anchor material shall be fasteners shall conform to ASTM A307 and be hot dip galvanized.
Type 3. Hex nuts shall conform to ASTM A563, Grade C3 or DH3. All other for rails shall conform to ASTM A847. Hex bolts shall conform to ASTM A325, and plate washers shall conform to ASTM A588. Structural tubing
MATERIALS: Steel for rail posts, base plates, shims, splice sleeves, April 2002.
Transportation Traffic Rail Type T101 standard drawing dated
GENERAL: This rail is modified from the Texas Department of a p p r o x a p p r o x overlay thin bonded epoxy
" 8 3top of approx.
a p p r o x a p p r o x
HACP
top of
K. EIKERMANN D. CHRISTENSEN
NO. SHEETS
REGION STATE PROJECT
SHEET TOTAL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
-J u l-
:5
P
M N
C O r o m o (2
B r id g e R
G C
A e s D
G N
F il e s r a il .d
KARL EIKERMANN
IMR
BIG THOMPSON RIVER BRIDGE REHAB
ROCKY MOUNTAIN NATIONAL PARK
BEAR LAKE ROAD
LARIMER COUNTY, COLORADO
S
B. ROBINSON
S49
NO SCALE
"2
End of timber rail
"4 383"
C Post
C Post
"4
9"
3" base plate. Shim as needed for vertical alignment.
Apply thin layer of neat cement grout under Gutterline
Transition railing
C Rail splice
1’-8" 8’-4" max.
" TUBES ELEVATION4
1HSS 4" x 4" x
BRIDGE RAIL ELEVATION
SECTION C-C E
E
SECTION E-E
PLAN VIEW @ POST
VIEW B-B
C
C
C tube (typ.)
C Post (typ.)
6" x 10" timber rail
" deep in timber rail.2
3Predrill slotted holes.
" horiz.2 1" x 18
At rail splice provide adjacent to rail splice.
(typ.) except @ locations tube (typ.)
" 4 1HSS 4" x 4" x
" x 8" lag screw (typ.)8 of timber rail, typ.)
" (C post to end4 counterbore (typ.)
" deep 4
2’-5" 2’-5"
= 3’-6"
3 spa. @ 1’-2"
SECTION D-D
SECTION A-A
in tubes (typ.)
slotted holes
" x 3" horiz.4 necessary for lateral adjustment.
standard washer as shim between the tubes and post as provide standard washer with hex nut and hex jam nut. Use splice. At rail splice hand tighten bolts to snug position and washer, and hex nut, (typ.) except @ locations adjacent to rail
L
L LL
L
L
L
L
L timber rail (typ.)
C sleeve
3" splice
C rail
"8
& C sleeve
C tube
6" 6"
2’-0" opening (typ.)
" rail4
"4
"8
G typ.
galvanizing.
assure slip fit after
Grind all edges to slip fit after galvanizing.
Size sleeve to provide of tube
Post side
A
A
RAIL SPLICE DETAIL
SECTION A-A SLEEVE
slot in rail
"16 9" x 4
" PL.4
1from splice sleeve
Fabricate rail
L
L
L
L
B B
A A
D D
(typ.)
" bolts8 3for
Drill & tap sleeve in tube.
1Provide with hardened washer.
BRIDGE RAIL DETAILS
STEEL TUBE BACKED TIMBER
K. EIKERMANN
D4
See RG2808-E.
min.
2’-4" min.
(Typical between posts & without deck joints) (Typical between posts & with deck joints) of wingwall)
(Typ. @ end wingwall bridge
End of
C deck joint
8’-4" max.
varies (2’-0" min.)varies (2’-0" min.)
washer & hex nuts.
washer, hardened
72 -
D. CHRISTENSEN
(typ.)
slotted hole in tube
" x 3"4 3C tube & C
K. EIKERMANN
NO. SHEETS
REGION STATE PROJECT
SHEET TOTAL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
-J u l-
:5
P
M N
C O r o m o (2
B r id g e R
G C
A e s D
G N
F il e s r a il .d
KARL EIKERMANN
IMR
BIG THOMPSON RIVER BRIDGE REHAB
ROCKY MOUNTAIN NATIONAL PARK
BEAR LAKE ROAD
LARIMER COUNTY, COLORADO
S
B. ROBINSON
S49
NO SCALE
Transition rail splice
Steel-backed timber guardrail timber bridge rail
Steel tube-backed
Note.
posts, see
Additional steel
(modified for steel post).
guardrail, Type A
Steel-backed timber
G typ.
No Scale slip fit after galvanizing.
Size sleeve to provide
C Sleeve
Sleeve cap
C post
3" 3" 3" 3" G Rail
Top of curb
10"
10’-0"
2’-6" 2’-6" 2’-6" 2’-6" 5’-0" 5’-0"
1’-8"
1’-3"
9" 9"
"4
6’-8"
5’-5"
"2 11’-4 2’-3"
" (typ.)16
" PL4
RAIL TRANSITION ELEVATION
RAIL TRANSITION PLAN
SLEEVE CAP DETAIL
SECTION B-BSECTION A-A
TRANSITION RAIL SPLICE DETAIL
B
BA
A
No Scale
C Post (typ.)
Steel plate
" (typ.).4 3corners
" PL. Cope4
SLEEVE
slip fit after galvanizing.
Grind all edges to assure
Steel rail (See Special 617-60) tube (typ.)
" 4 1HSS 4" x 4" x
" PL.4
1sleeve from
Fabricate rail splice
(modified for steel post).
See Standard 617-60, Steel-backed timber guardrail, Type A
3plate, and
" slot in steel2 1" x 2 4
3bolts with plate washer and hex nut, a
5Note: At each additional post provide 2- L
L
L
RAIL TRANSITION
STEEL TUBE BACKED TIMBER
K. EIKERMANN
(Guardrail System SBTC) timber bridge rail
Pay limit for steel tube-backed
(Guardrail System SBTA) timber guardrail
Pay limit for steel backed wingwall
End of bridge
5 E min.
K. EIKERMANN D. CHRISTENSEN
NO. SHEETS
REGION STATE PROJECT
SHEET TOTAL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
-J u l-
:5
P
M N
C O r o m o (2
B r id g e R
G C
A e s D
G N
F il e s r a il .d
KARL EIKERMANN
IMR
BIG THOMPSON RIVER BRIDGE REHAB
ROCKY MOUNTAIN NATIONAL PARK
BEAR LAKE ROAD
LARIMER COUNTY, COLORADO
S
B. ROBINSON
S49
UNLESS NOTED
�"= 1’-0" m in
C Brg.
each leg, staggered. Weld to angle with full penetration butt weld.
No Scale
(2 req’d.)
C Rdwy.
or End Bridge
Begin Bridge be removed
Concrete to flush with deck edge)
Waterstop (to be cut
No Scale
No Scale
No Scale backwall
1’-3"
" Joint4
Concrete curb (typ.)
L
L
A A
ABUTMENT 1 PLAN
(ABUTMENT 2 SIMILAR)
B
B
SECTION A-A AT EXISTING JOINT
GUARD ANGLE DETAIL
SECTION B-B
SECTION A-A AT NEW JOINT
backwall
1’-3"
Joint
"4 m in
8"
6"
ELEVATION
SECTION 1’-0" (typ.)
1’-0" (typ.)
3L 3 x 3 x placing concrete.
Blast clean before place (typ.).
to remain in
Reinforcing bars
See Detail.
New guard angle.
joint installation.
necessary to facilitate new
Note: Remove existing joint as
Concrete Class A(AE)
New Structural vertical bars
#4A1 tied to existing
ALL DIMENSIONS ARE OUT TO OUTMARK MARKNO. NO.SIZE SIZELENGTH LENGTH
LOCATION
STRAIGHT BARS BENT BARS BENDING DIAGRAMS
A1 62 4 1-8
8 4 16-0
A1
DECK JOINT REPAIR - ABUTS.
11"
4�" hook (typ.)
Stirrups
Longitudinal A2
(typ.)
Gutterline
(to be removed)
Asphaltic rubber joint filler
(to be removed)
Premolded joint filler p la c e m e n t o f n e w S tr u c tu r a l
C o n c r e te
C la s s A A
E
P a y l im it s f o r R e m o v a l o f
C o n c r e te b a c k w a ll
"4 th r o a t
(to be removed)
Guard angle with anchors joint Stage const.
Length = 30’-4"
Note: Galvanize assembly after fabrication.
LC stage const. jt.
Longitudinal
BACKWALL (Qty. = 230 lbs.)
A3 8 4 14-0
F6
D. CHRISTENSEN K. EIKERMANN
at stage const. jt. (typ.).
Splice with mechanical couplers
#4A2 or #4A3 bars (4 tot.).
See detail.
New guard angle.
See detail.
Non-sag silicone joint sealant (typ.).
for details.
of curb (typ.). See Section B-B vertical and horizontal surfaces
Place silicone joint sealant in
K. EIKERMANN
to C ty p
M e a s u r e d r a d ia l
L
14’-2" 16’-2"
G
" from each end.4 1Grind galv. *
3" min. (typ.)
sand blasting must be filtered for oil and moisture.
residues, and other foreign matter that might prevent bond. Compressed air for surfaces must be clean, sound, frost free, free of oils, grease, curing compound by sand blasting or other mechanical means as approved by the CO. The concrete installation, concrete surfaces to which the sealant will adhere must be prepared
Non-sag silicone joint sealant per Subsection 712.01(e). Tool surface flat. Prior to
Top of concrete deck rubber waterstop
Remaining epoxy overlay
Thin bonded
NO. SHEETS
REGION STATE PROJECT
SHEET TOTAL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
-J u l-
:5
P
M N
C O r o m o (2
B r id g e R
G C
A e s D
G N
F il e s d e c k j o in ts .d
KARL EIKERMANN
IMR
BIG THOMPSON RIVER BRIDGE REHAB
ROCKY MOUNTAIN NATIONAL PARK
BEAR LAKE ROAD
LARIMER COUNTY, COLORADO
S
B. ROBINSON
S49
DECK JOINT REPAIR - HINGES
Section B-B, C-C & Detail D.
Note: See RG2808-H for
(to remain)
Rubber waterstop
HINGE NEAR PIER 1 PLAN
SECTION A-A AT NEW JOINT
AA
SECTION A-A AT EXISTING JOINT
HINGE NEAR PIER 2 PLAN
B B
C
See Detail D on RG2808-H.
UNLESS NOTED
�"= 1’-0"
C Rdwy.L
" Joint4
Concrete curb (typ.)
Joint
"4
C Rdwy.L
No Scale
No Scale
G7K. EIKERMANND. CHRISTENSEN
filler (to be removed).
Asphaltic rubber joint sealant and backer rod.
filler as necessary for new
Remove premolded joint on RG2808-F for details.
of curb (typ.). See Section B-B vertical and horizontal surfaces
Place silicone joint sealant in
"4 th r o a t
C
Gutterline
Gutterline
Concrete curb (typ.)
LC
ty p r a d ia l to
M e a s u r e d const. jt.
Stage joint
New expansion
Polymer mortar
Compressed air for sand blasting must be filtered for oil and moisture.
curing compound residues,and other foreign matter that might prevent bond.
The concrete surfaces must be clean, sound, frost free, free of oils, grease, prepared by sand blasting or other mechanical means as approved by the CO.
to installation, concrete surfaces to which the sealant will adhere must be
Non-sag silicone joint sealant per Subsection 712.01(e). Tool surface flat. Prior
Top of concrete deck epoxy overlay
Thin bonded
NO. SHEETS
REGION STATE PROJECT
SHEET TOTAL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
-J u l-
:5
P
M N
C O r o m o (2
B r id g e R
G C
A e s D
G N
F il e s d e c k j o in ts .d
KARL EIKERMANN
IMR
BIG THOMPSON RIVER BRIDGE REHAB
ROCKY MOUNTAIN NATIONAL PARK
BEAR LAKE ROAD
LARIMER COUNTY, COLORADO
S
B. ROBINSON
S49
DECK JOINT REPAIR - HINGE 2
2"
C joint
Curb
Bridge deck
DETAIL D PART PLAN
SECTION C-C AT NEW JOINT
SECTION B-B AT NEW JOINT
SECTION B-B AT EXISTING JOINT
EXPANSION JOINT GENERAL NOTES:
L
C Rdwy.L
2’-6"
NONE
Varies
See table for "A" dimension.
H8
D. CHRISTENSEN K. EIKERMANN
Detail D, see RG2808-G.
Note: For location of Section B-B, C-C & plate.
" x 9" bridging4 3Existing
"8 55 vertical plate.
beneath. The weld connects the bridging plate to the
" fillet weld 16 3such that it projects to the toe of the oxy-acetylene torch cut edge smooth and square
Cut this portion of bridging plate. Grind the resulting m in
Closed cell backer rod
6" sealant. See notes.
Rapid cure silicone joint bridging plate with polymer mortar.
" deep recess from removed 4 3Fill
"A"
"A" const. jt.
Stage
(To gutterline)
Gutterline
E
SECTION E-E
E
K. EIKERMANN
See Notes.
Recess depth.
m in
See Notes.
Recess depth.
sealant. See notes.
Rapid cure silicone joint
F
F backer rod.
Closed cell
Polymer mortar
Pay limits of polymer mortar = 30’-1" +/-
(gutterline to gutterline) backer rod.
Closed cell
(continuous).
silicone sealant
Rapid cure
A
SECTION F-F
" min.2 backer rod.
Closed cell perimeter of curb joint).
and flush with edge of joint (typ. @ oxy-acetylene torch cut edge smooth
Cut bridging plate and grind the resulting
See Notes.
Recess depth.
See notes.
silicone joint sealant.
Premolded rapid cure base of the premolded sealant.
sides and along the horizontal joint sealant along the vertical
Place a bead of rapid cure silicone
(@ top of curb)
(@ vertical curb face) silicone joint sealant (typ.).
backer rod and premolded sealant placed between
Rapid cure silicone joint
92 90
52 85
32 80
13 60
73 50
93 45
113 40
153 30
34 20
Inches” F
T A specific installation instructions.
the manufacturer representative shall be contacted for
If the joint is to be sealed at a temperature below 50” F, ")8 168” F = T = 85” F (Recess =
OR
") 8 320” F = T = 45” F (Recess =
Section 552, is:
temperature (T), as determined by the procedure in
Note: The joint may be sealed only when the structure provided it will bond to itself.
traffic. The sealant may be discontinuous at the construction joint
3. The joint shall be constructed in stages with one lane open to for joint openings greater than 3".
of +100% and -50% for joint openings less than or equal to 3" and –50%
2. The rapid cure silicone joint sealant shall accommodate joint movements
Subsection 712.01(i) of Special Contract Requirements.
1. Use Dow Corning 902 RCS Joint Sealant or an approved equal conforming to
" +/-2 116’-0 " +/-2
114’-0
Polymer mortar epoxy overlay
Thin bonded
NO. SHEETS
REGION STATE PROJECT
SHEET TOTAL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
BRIDGE DRAWING DATE DRAWING NO.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
-J u l-
:5
P
M N
C O r o m o (2
B r id g e R
G C
A e s D
G N
F il e s d e c k j o in ts .d
KARL EIKERMANN
IMR
BIG THOMPSON RIVER BRIDGE REHAB
ROCKY MOUNTAIN NATIONAL PARK
BEAR LAKE ROAD
LARIMER COUNTY, COLORADO
S
B. ROBINSON
S49
File details come from the government source that posted it. Updated .