This document is an amendment to Solicitation 140P2024R0083 for the GLAC 307606 - Replace Swiftcurrent Water Distribution System project in Glacier National Park, Montana. The purpose of this amendment is to provide responses to questions received and to make changes to two construction specifications.
The key changes include:
- Revising Construction Specification 01 11 00 - Summary of Work, specifically updating the work phasing details regarding the waterline work and tank draw.
- Revising Construction Specification 01 35 05 - Environmental Protection and Special Controls, including changes to oversize/overload vehicle permit requirements and material source approvals. The amendment also provides details on coordination required with the Federal Highways Administration project in the area. All other terms and conditions of the solicitation remain unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08-140P2024R0083-Amd_5_0005.pdf | ||
| Sol_140P2024R0083_Amd_0005.pdf | ||
| B08-140P2024R0083-Amd4_0004.pdf | ||
| Sol_140P2024R0083_Amd_0003.pdf | ||
| B08-140P2024R0083-Amd3_0003.pdf | ||
| Sol_140P2024R0083_Amd_0002.pdf | ||
| B08-140P2024R0083-Amd2_0002.pdf | ||
| Sol_140P2024R0083_Amd_0001.pdf | ||
| B08-Section_J-Attachment_1_-Swiftcurrent_Construction_Specifications_05222024-1432-Final.pdf | ||
| Sol_140P2024R0083.pdf | ||
| B08-140P2024R0083-Complete_Package-2.pdf | ||
| B08-Sectdion_J_-_Attachment_2-GLAC_307606_Swiftcurrent_Water_System_CDs_Drawings_March_2024-Stamped-.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2024R0083 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
07/29/20240004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/08/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
GLAC 307606 - Replace Swift Current Water Distribution System
The purpose of this amendment is to provide for the following:
1. Responses to Questions received to date.
In addition, the following Construction Specifications are hereby changed:
1. Remove Construction Specification 01 11 00 dated May 22, 2024 and replace with
Construction Specification 01 11 00 dated July 26, 2024.
a. Summary of Work 1.3 Work Phasing A.4.b.1. is changed as follows: "Tank Draw
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Vicki Freese-supler
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2024R0083/0004
Waterline St 21+40 to St 22+90, St 220+00 to St
230+00 and St 170+00 to St 170+20."
b. Summary of Work - Subparagraph F4, Item 4
A single lane will be available for travel along
Rte 3 while work is being conducted by FHWA. The work associated with FHWA may lead up to 30 minute delays in travel along Rte 3. Coordinate with CO regarding delay times, dates and other details.
c. Addition of Subparagraph F.4.5 under
Section 1.4 of Construction Specification 01 11
00 - "5. Details of the Federal Highways Project are generally called out in the contract drawings but should not be relied upon for contractual obligations associated with the project.
Coordinate with CO to confirm project schedule, dates, extents, staging areas, and other elements within the project areas.
2. Remove Construction Specification 01 35 05
Environmental Protection and Special Controls dated May 22, 2024 and replace with Construction
Specification 01 35 05 Environmental Protection and Special Controls dated July 26, 2024.
a. Replace all of Subparagraph E.1 under
Section 3.1 as follows: 1) Access to the project site will involve using three existing bridges.
Submit overload and oversize permits for non-legal loads transported within the park boundary to the CO utilizing the FLH Bridge
Oversized or overload vehicle permit request form."
b. Remove all of Subparagraph F.1 under
Section 3.2.
c. Remove all of Subparagraph E.3 under
Section 3.1 and changed as follows: "2.
Material sources are subject to continual inspections and approvals for each year of use".
All other terms and conditions of the solicitation remain unchanged.