This document is a construction specification for a project to rehabilitate the Sugarlands Headquarters building and to rehabilitate the water and wastewater systems at the Sugarlands location in Great Smoky Mountains National Park.

The project consists of the following key elements:

  • Rehabilitation of the existing Sugarlands Headquarters building, including exterior and interior repairs, HVAC, plumbing, and electrical system upgrades, and site improvements.
  • Replacement of the potable water system, including water mains, service lines, meters, valves, and fire hydrants.
  • Rehabilitation of the wastewater system, including CIPP lining of defective pipe segments, manhole lining and root treatment, and replacement/re-routing of sanitary pipe and manholes.
  • Addition of a new chemical storage room to the existing Sugarlands pump house.

The project is being bid as a single prime contract with several bid options for additional scope items. The contractor will be required to coordinate closely with the National Park Service on scheduling and access, and comply with environmental and historic preservation requirements. A detailed construction schedule and time impact analysis procedures are specified.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRSM Sugarlands Pump House Water &

Wastewater System Rehabilitation

Project Manual

NATIONAL PARK SERVICE

MARCH 2024

HDR Project No. 10317619

This page intentionally left blank.

Sugarlands W-WW Rehabilitation Construction Documents March 2024

GRSM – 149285 00 01 02-1

TABLE OF CONTENTS

TABLE OF CONTENTS

COVER & TABLE OF CONTENTS

COVER

TABLE OF CONTENTS

DIVISION 01 — GENERAL REQUIREMENTS

01 45 33 - IBC 2015 - CODE-REQUIRED SPECIAL INSPECTIONS AND PROCEDURES

01 81 10 - WIND AND SEISMIC DESIGN CRITERIA

DIVISION 03 — CONCRETE

03 00 00 - DIVISION DIVIDER

03 00 05 - CONCRETE

03 05 05 - CONCRETE TESTING AND INSPECTION

03 15 19 - ANCHORAGE TO CONCRETE

DIVISION 04 — MASONRY

04 00 00 - DIVISION DIVIDER

04 01 20 - MASONRY CLEANING

04 05 13 - MASONRY MORTAR AND GROUT

04 05 23 - MASONRY ACCESSORIES

04 05 50 - COLD AND HOT WEATHER MASONRY CONSTRUCTION

04 22 00 - CONCRETE MASONRY

DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES

06 00 00 - DIVISION DIVIDER

06 10 00 - ROUGH CARPENTRY

06 17 53 - SHOP-FABRICATED WOOD TRUSSES

DIVISION 07 — THERMAL AND MOISTURE PROTECTION

07 00 00 - DIVISION DIVIDER

07 21 00 - BUILDING INSULATION

07 26 00 - UNDER SLAB VAPOR RETARDER

07 31 13 - ASPHALT SHINGLES

07 46 17 - FLAT LOCK ZINC SIDING

07 62 00 - FLASHING AND SHEET METAL

07 84 00 - FIRESTOPPING

07 92 00 - JOINT SEALANTS

DIVISION 08 — OPENINGS

08 00 00 - DIVISION DIVIDER

08 11 00 - HOLLOW METAL DOORS AND FRAMES

08 70 00 - FINISH HARDWARE

08 90 00 - LOUVERS AND VENTS

DIVISION 09 — FINISHES

09 00 00 - DIVISION DIVIDER

09 29 00 - GYPSUM BOARD

09 96 00 - HIGH PERFORMANCE INDUSTRIAL COATINGS

DIVISION 10 — SPECIALTIES

10 00 00 - DIVISION DIVIDER

10 14 23 - SIGNAGE

10 44 33 - FIRE PROTECTION SPECIALTIES

DIVISION 22 — PLUMBING

22 00 00 - DIVISION DIVIDER

22 05 03 - PIPE AND PIPE FITTINGS PLUMBING SYSTEMS

22 05 23 - GENERAL DUTY VALVES FOR PLUMBING PIPING

Sugarlands W-WW Rehabilitation Construction Documents March 2024

GRSM – 149285 00 01 02-2

TABLE OF CONTENTS

22 05 29 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

22 07 00 - PIPE AND EQUIPMENT INSULATION

22 20 00 - PLUMBING FIXTURES AND EQUIPMENT

DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING

23 00 00 - DIVISION DIVIDER

23 05 13 - COMMON MOTOR REQUIREMENTS FOR HVAC AND PLUMBING EQUIPMENT

23 05 53 - IDENTIFICATION FOR HVAC, DUCTWORK, PIPING AND HVAC EQUIPMENT

23 05 93 - HVAC SYSTEMS BALANCING AND TESTING

23 31 00 - HVAC - DUCTWORK

DIVISION 26 — ELECTRICAL

26 00 00 - DIVISION DIVIDER

26 00 00 - ELECTRICAL WORK

DIVISION 31 — EARTHWORK

31 00 00 - DIVISION DIVIDER

31 10 00 - SITE CLEARING

31 23 00 - EARTHWORK

31 23 17 - ROCK EXCAVATION

31 23 19 - DEWATERING

31 23 33 - TRENCHING, BACKFILLING, AND COMPACTING FOR UTILITIES

31 25 00 - SOIL EROSION AND SEDIMENT CONTROL

DIVISION 32 — EXTERIOR IMPROVEMENTS

32 00 00 - DIVISION DIVIDER

32 12 16 - ASPHALTIC CONCRETE VEHICULAR PAVING

32 13 13 - CONCRETE PAVEMENT

32 92 00 - SEEDING, SODDING AND LANDSCAPING

DIVISION 33 — UTILITIES

33 00 00 - DIVISION DIVIDER

33 01 30.14 - CLEANING OF SEWER PIPE

33 01 30.16 - CLOSED- CIRCUIT TV (CCTV) INSPECTION OF SEWER PIPE4

33 01 30.73 - CURED-IN-PLACE PIPE (CIPP)

33 01 30.83 - MANHOLE REHABILITATION

33 05 07 - HORIZONTAL DIRECTIONAL DRILLING

33 05 16 - PRECAST CONCRETE MANHOLE STRUCTURES

33 05 23 - PIPELINE UNDERCROSSINGS

33 05 33 - POLYETHYLENE UTILITY PIPE

33 11 13 - WATER MAIN CONSTRUCTION

33 12 19 - FIRE HYDRANT

33 31 11 - GRAVITY SEWER PIPELINE AND MANHOLE CONSTRUCTION

DIVISION 40 — PROCESS INTERCONNECTIONS

40 00 00 - DIVISION DIVIDER

40 05 00 - PIPE AND PIPE FITTINGS - BASIC REQUIREMENTS

40 05 07 - PIPE SUPPORT SYSTEMS

40 05 19 - PIPE - DUCTILE IRON

40 05 51 - VALVES - BASIC REQUIREMENTS

40 05 61 - GATE VALVES

40 05 63 - BALL VALVES

Rehab Sugarlands Headquarters, Water and Wastewater Systems

GRSM – 149368, 149285 01 11 00 - 1

SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This project includes PMIS 149368 and PMIS 149285 Sugarlands Rehabilitation projects.

B. Work for this Project includes PMIS 149368, the rehabilitation of a historic building.

C. Work for this Project GRSM 149285 includes replacement of water system piping and components;

rehabilitation of sewer piping and manholes; and expansion of an existing pump house. New water and sanitary utilities will service the Headquarters Building.

D. Integrate all elements of work across the Sugarlands area to establish and permit site access, staging, and support facilities for both projects. Coordinate scheduling and planning for utility connections with

Contracting Officer and utility project Contracting Officer’s Representative.

E. This Section includes the following:

1. Work covered by the Contract Documents.

2. Work under other contracts.

3. Contractor use of premises.

4. Public use of site.

5. Occupancy requirements for buildings.

6. Work Restrictions.

7. Special Construction Requirements.

8. Additional Reports.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Sugarlands Headquarters Building, 107 Park Headquarters Rd., Gatlinburg, TN 37738;

Little River Ranger Station, 139 Park Headquarters Rd., Gatlinburg, TN 37738; Residential Area, Sugarlands Residence Road; Maintenance Yard, Park Headquarters Rd, Gatlinburg, TN 37738.

B. Work for the Rehabilitation of the Headquarters, rehabilitation of the wastewater system, construction of the water system, and construction of the new chemical storage room addition to the pump house will be a single phase under a single prime contract.

C. The Work consists of the following for PMIS 149368:

1. Sugarlands Headquarters Building: The Work includes the exterior and interior rehabilitation of the existing headquarters building at Great Smoky Mountains National Park. The project includes, but is not limited to, exterior repairs, interior reconfiguration, a new elevator, overhaul and replacement of exiting HVAC, plumbing, and electrical systems and telecom systems, fire suppression systems, waterproofing, and targeted site improvements to improve accessibility and site and building drainage. Temporary office facilities for limited administrative personnel will be provided while construction is underway.

2. Headquarters Project is designed to comply with NPS sustainability standards, to a level equivalent with the Silver Certification Level according to the U.S. Green Building Council's Leadership in

Energy & Environmental Design (LEED) Rating System, as specified in Division 01 Section

"Sustainable Design Requirements." Certification of the project with USGBC is not required for this project.

D. The Work consists of the following for PMIS 149285:

GRSM – 149368, 149285 01 11 00 - 2

SUMMARY OF WORK

1. Replacement of the potable water system throughout the Sugarlands area, including the water mains, service lines, meters, valves, and fire hydrants.

2. Rehabilitation of the wastewater system, including CIPP lining of defective pipe segments, lining and root treatment of sanitary manholes, and replacement and re-routing of sanitary pipe and manholes receiving flow from the Visitor’s Center

3. Addition of a chemical storage room to the existing Sugarlands pump house, including reinstalling all pump house fixtures and restoring the pump house to its current operation.

1.3 WORK UNDER OTHER CONTRACTS

A. Maintenance Facility Replacement: A separate project is planned for replacement of the existing maintenance facility located on Headquarters Road.

1.4 CONTRACTOR USE OF SITE

A. General: Contractor shall have full use of each site for construction operations during the construction period, within the work and staging limits indicated on Drawings. Contractor's use of the site is limited only by the Government's right to perform work or to retain other contractors on portions of project.

B. Staging, Storage of Materials, and Parking: Confine staging areas, material laydown and storage areas, temporary facilities, and parking for construction personal to limits indicated on Civil and Architectural

Site drawings, or as otherwise approved by Contracting Officer.

C. Government will vacate the existing Sugarlands Headquarters Building until it is completed and ready for occupancy.

D. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with

Contracting Officer and remove agreed on roots and branches that interfere with construction.

4. Do not fasten ropes, cables, or guys to existing trees.

5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

E. Driveways and Entrances: Construction entrance and driveway locations are indicated on Drawings. Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Cover trenches in any areas affecting traffic flow around driveways and entrances (e.g., by providing temporary plates) and do not leave trenches open overnight. Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

F. Construction Camp: Establishment of a camp within the park will not be permitted.

G. Site Access: Great Smoky Mountains National Park is heavily visited by the public during the months of

June, July, August, and October, resulting in heavy traffic on inbound and outbound roadways. Plan for traffic delays during these periods.

H. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed

GRSM – 149368, 149285 01 11 00 - 3

SUMMARY OF WORK

by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

1. Commercial Vehicles are not permitted on Newfound Gap Road, which traverses the Park from points South. Stage and coordinate deliveries and site access from Gatlinburg, TN.

1.5 PUBLIC USE OF SITE

A. The building will be closed to the public during construction.

B. Conduct operations to ensure the least inconvenience to the public. Road closures will only be permitted upon specific approval of Contracting Officer, based on demonstrated need.

1.6 OCCUPANCY REQUIRMENTS FOR BUILDINGS

A. Existing Buildings

1. Government will not occupy the premises during construction. Adhere to the following:

a. Maintain existing building in weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building during construction period until project completion.

b. Obtain a Certificate of Occupancy from the NPS before Government occupancy.

c. Before Government occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Government will operate and maintain mechanical and electrical systems serving occupied portions of building.

d. On occupancy, Government will assume responsibility for maintenance and custodial service for occupied portions of building.

1.7 CONDUCT OF OPERATIONS

A. At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests 7 days in advance of the work to the Contracting Officer for approval.

C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

1.8 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 6:00 a.m. to 6:00 p.m., Monday through Friday, except when otherwise indicated.

1. Weekend Hours: Coordinate hours with the Contracting Officer.

2. Early Morning Hours: Coordinate hours with the Contracting Officer.

3. Hours for all noisy activity: Coordinate hours with the Contracting Officer.

B. Existing Utilities

GRSM – 149368, 149285 01 11 00 - 4

SUMMARY OF WORK

1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities that remain occupied by

Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Contracting Officer’s written permission.

3. Limit time of authorized utility interruptions to occupied facilities to a maximum of four hours.

D. Smoking is not permitted within the building or on the project site, except for designated smoking area.

Obtain Contracting Officer’s approval for location of designated smoking area. Designated smoking area must be within the project work or staging area limits and will not be permitted within 25 feet of the building or any occupied structure.

1.9 SPECIAL CONSTRUCTION REQUIREMENTS

A. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction stage.

1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project

Website.

B. PMIS 149368 for Headquarters project will adhere to DOI section standards. Preservation of Headquarters

Features: Refer to Section 013591 for full Historic Preservation Treatment. Treat the historic building respectfully. Carefully respect existing conditions and treat existing materials as irreplaceable. Do not remove, alter or disfigure any existing materials, elements or finishes, unless indicated on Drawings, specified herein, or directed by Contracting Officer.

C. Special project-related requirements to be determined by Contracting Officer.

D. Construction Sequencing Constraints.

1. Contractor to not conduct road work during month of October.

2. All tree removal required by the project shall occur between October 01 to March 31.

1.10 ADDITIONAL REPORTS

A. Refer to Section 00 31 26 for hazardous materials reports related to the project.

B. Refer to Historic Structure Report, attached as an appendix to the Headquarters Project Manual, for general background requirements and significant character-defining features in the Headquarters Building to be preserved and maintained. The Historic Structure Report is provided for reference only and does not govern the scope, extent, or type of work to be performed for this Project.

C. Refer to Appendices for Geo-Technical Report.

D. Refer to Appendices for Mitigation Summary reports (PEPC, SOF). It is the responsibility of the Contractor to follow these reports.

GRSM – 149368, 149285 01 11 00 - 5

SUMMARY OF WORK

E. If conflicts occur between reports and drawings or specifications, the drawings and specifications govern.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

GRSM – 149368, 194285 01 22 00 - 1

UNIT PRICES

SECTION 01 22 00 - UNIT PRICES

PART 1 - GENERAL

1.0 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.1 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Related Requirements:

1. Section 01 26 00 "Contract Modification Procedures" for procedures for submitting and handling

Change Orders.

2. Section 01 40 00 "Quality Requirements" for field testing by an independent testing agency.

1.2 DEFINITIONS

A. Unit price is an amount incorporated into the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.3 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Contracting Officer reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Government's expense, by an independent surveyor acceptable to Contractor.

D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the

Part 3 "Schedule of Unit Prices" Article contain requirements for materials described under each unit price.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.0 SCHEDULE OF UNIT PRICES– GRSM 149368 HEADQUARTERS

A. Unit Price No. 1: Stone Repointing

1. Description: Rake and repoint existing stone masonry mortar joints in accordance with Section 04

01 40.62 “Stone Repointing.”

2. Unit of Measurement: Per linear foot of joint repointed, based on survey of total quantity of repointed stone mortar joints.

GRSM – 149368, 194285 01 22 00 - 2

UNIT PRICES

3. Estimated Base Quantity for Bid: 1,200 SF

4. Estimated Base Quantity for Bid Alt 2: 21,402 SF

B. Unit Price No. 2: Plug Repairs to Wood Flooring.

1. Description: Repair holes greater than one-eighth inch in diameter in existing hardwood flooring that is otherwise sound, by drilling out and infilling with hardwood plugs matching the species of the surrounding flooring, set and sanded to provide a uniform surface ready to receive indicated finishes.

2. Unit of Measurement: Per hole repaired, based upon survey of total quantity of repairs.

3. Estimated Base Quantity for Bid: 100

C. Unit Price No. 3: Wood Flooring Replacement

1. Description: Replace finish hardwood flooring where damaged or deteriorated, in kind with new hardwood flooring matching the species, profile, dimensions and attachment methods of surrounding existing flooring to remain.

2. Unit of Measurement: Per board foot of hardwood flooring replaced, based upon survey of total quantity of repairs.

3. Estimated Base Quantity for Bid: 150 SF

D. Unit Price No. 4: Interior Plaster Restoration

1. Description: Repair water-damaged interior gypsum plaster finish, including removal of existing damaged and unsound plaster, application of plaster bonding agent, application of sanded gypsum plaster scratch coat to depth of existing adjacent scratch coat, application of plaster finish coat, and finishing and blending to provide a uniform final surface and appearance, ready to receive specified finish treatments.

2. Unit of Measurement: Per square feet, based upon survey of total quantity of repairs.

3. Estimated Base Quantity for Bid:

a. Ceiling: 2,500 SF

b. Walls: 1,000 SF

E. Unit Price No. 5: Roof Slate Resetting or Replacement

1. Description: In locations where, slate roofing is not otherwise indicated on Drawings to be removed and/or reset remove loose and damaged existing roof slates; reset intact existing slates; and replace damaged existing slates with roof slates from Government’s stock, in accordance with Section 07

31 26, “Repair of Slate Shingle Roofing.”

2. Unit of Measurement: Per slate reset or replaced, based upon survey of total quantity of repairs.

3. Estimated Base Quantity for Bid: 100 slates.

END OF SECTION 01 22 00

GRSM – 149368, 149285 01 23 00 – 1

ALTERNATES

SECTION 01 23 00 - ALTERNATES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for alternates.

1.3 DEFINITIONS

A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if the Government decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

1. Alternates may be referred to and identified in the Contract Documents as "Bid Options."

2. Alternates described in this Section are part of the Work only if enumerated in the Agreement.

3. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternates into the Work. No other adjustments are made to the Contract Sum.

1.4 PROCEDURES

A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

1. Include, as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation, whether or not indicated as part of alternate.

B. Execute accepted alternates under the same conditions as other Work of the Contract.

C. Schedule: A Part 3 "Schedule of Alternates" Article is included at the end of this Section. Specification

Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF ALTERNATES – HEADQUARTERS BUILDING

A. Alternate No. 1: Repair and Repaint Exterior Wood Trim and Porch Ceiling.

1. Base Bid: Do not perform work identified in the Contract Documents as Alternate 1.

2. Alternate: Repair, prep and paint existing exterior wood porch and ceiling as indicated on

Architectural Drawings.

B. Alternate No. 2: Repoint Existing Site Stone Masonry.

GRSM – 149368, 149285 01 23 00 – 1

ALTERNATES

1. Base Bid: Do not perform work identified in the Contract Documents as Alternate 2.

2. Alternate: Selectively repoint portions of existing stone masonry site retaining wall and site stairways as indicated on Architectural Drawings.

3.2 SCHEDULE OF ALTERNATES – WATER AND WASTEWATER SYSTEM REHABILITATION

A. Alternate No. 1: Extend Water and Wastewater Systems to Maintenance Yard

1. Base Bid: Construct systems to location near existing pump house indicated on Construction

Documents.

2. Alternate: Construct systems from existing pump house location to termination locations adjacent to existing maintenance yard.

B. Alternate No. 2: Replacement of Sanitary Sewer

1. Base Bid: CIPP-Lining of Sewer

2. Alternate: Remove Existing sewer lines and replace segments indicated on the Drawings for CIPP-

Lining, as well as segments with noted Sags.

C. Alternate No. 3: Replacement of Sanitary Sewer Manholes

1. Base Bid: Raising Manhole to Grade, Manhole Rehabilitation, and Root Treatment

2. Alternate: Replacement of entire manhole in place of rehabilitation as indicated on the Drawings.

D. Alternate No. 4: Sugarlands Pump House Improvements

1. Alternate: All work at Sugarlands pump house, including construction of new chemical room and related improvements

E. Alternate No. 5: Installation of 6-inch HDPE Water Main by Pipe Bursting Existing 4-inch

1. Alternate: All work to install Line by Pipe Bursting the Existing 4-inch Water Main, for approximate distance of 1,600 linear feet (LF)

F. Alternate No. 6: Tree Removal

1. Alternate: Remove trees in quantity and locations indicated on Drawings to facilitate installation of new construction.

END OF SECTION 01 23 00

GRSM – 149368, 149285 01 26 00 - 1

CONTRACT MODIFICATION PROCEDURES

SECTION 01 26 00 - CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

GRSM – 149368, 149285 01 26 00 - 2

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums, such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation to be made available.

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

GRSM – 149368, 149285 01 26 00 - 3

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces.

This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work. Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

GRSM – 149368, 149285 01 26 00 - 4

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)

b. Construction Blue Book

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized, then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit. Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:

a. Overhead………………10%

b. Profit……………......… 6.0%

GRSM – 149368, 149285 01 26 00 - 5

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, then the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to Part 1.3 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

PART 2 - PRODUCTS

PART 3 - EXECUTION

END OF SECTION 01 26 00

GRSM – 149368, 149285 01 27 00 - 1

DEFINITION OF CONTRACT LINE ITEMS

SECTION 01 27 00 - DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cutoff points where one item ends, and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line-Item No. 1: Sugarlands Headquarters Renovation.

1. This item includes all materials, labor and equipment required to complete the scope of work described in the Contract Documents for the Sugarlands Headquarters Building, except for base quantities for the work described in Section 012200 “Unit Prices.”

2. Payment will be made at the contract lump sum price according to the payment procedures set forth in the Contract Documents.

B. Contract Line-Item Number 2: Water System Replacement

1. This item consists of all materials, labor, mobilization, control measures, and equipment required to complete the scope of work described in the Contract Documents.

2. Payment will be made at the contract lump sum price according to the payment procedures set forth in the Contract Documents.

C. Contract Line-Item Number 3: Wastewater System Rehabilitation and Replacement

1. This item consists of all materials, labor, mobilization, control measures, and equipment required to complete the scope of work described in the Contract Documents.

2. Payment will be made at the contract lump sum price according to the payment procedures set forth in the Contract Documents.

D. Contract Line-Item 4: Bid Option 1, Sugarlands Headquarters Repair and Repaint Exterior Wood Trim and

Porch Ceiling

1. This item includes all materials, labor and equipment required to complete the scope of exterior wood trim repair and repainting identified under the scope of Headquarters Building Alternate No.

1, as described on Drawings and in Section 01 23 00.

2. Payment will be made at the contract lump sum price according to the payment procedures for Bid

Options set forth in the Contract Documents.

E. Contract Line-Item5: Bid Option 2, Sugarlands Headquarters Building, Repoint Existing Site Stone

Masonry

GRSM – 149368, 149285 01 27 00 - 2

1. This item includes all materials, labor and equipment required to complete the scope of site retaining wall and stairway stone masonry repairs identified under the scope of Headquarters Building

Alternate No. 2, as described on Drawings and in Section 01 23 00.

2. Payment will be made at the contract lump sum price according to the payment procedures for Bid

Options set forth in the Contract Documents.

F. Contract Line-Item 6: Water and Wastewater System Bid Option 1, Extend System to Maintenance Area

1. This item consists of all materials, labor, mobilization, control measures, and equipment required to complete the scope of work described in the Contract Documents as Water and Wastewater System

Alternate 1 and Section 01 23 00.

2. Payment will be made at the contract lump sum price according to the payment procedures for Bid

Options set forth in the Contract Documents.

G. Contract Line-Item 7: Sugarlands Water/Wastewater Bid Option 2, Additional Sanitary Sewer Replacement

1. This item consists of optional pricing for expanded scope of replacement of sanitary sewer pipe segments.

2. Payment will be made at the contract lump sum price according to the payment procedures for Bid

Options set forth in the Contract Documents.

H. Contract Line-Item 8, Sugarlands Water/Wastewater Option 3, Additional Sanitary Sewer Manhole

Replacement

1. This item consists of optional pricing for expanded scope of Manhole replacement in lieu of rehabilitation. All replacement manholes to be 4-foot diameter.

2. Payment will be made at the contract lump sum price according to the payment procedures for Bid

Options set forth in the Contract Documents.

I. Contract Line-Item 9, Sugarlands Water/Wastewater Option 4, Pump House Addition

1. This item consists of all materials, labor, control measures, and equipment required to complete the scope of work described in the Contract Documents for the addition and other modifications to the

Sugarlands pump house.

2. Payment will be made at the contract lump sum price according to the payment procedures set forth in the Contract Documents.

J. Contract Line-Item 10, Sugarlands Water/Wastewater Option 5, Water Line Pipe Bursting

1. This item consists of all labor, materials, control measures and equipment for pipe bursting of existing 4-in water line to 6-in water line AA, as indicated on the project plans. Includes 6-inch water main installation by HDD under Fighting Creek Gap Road as indicated on the Drawings, and all connections and appurtenances as required, for a distance of approximately 1,600 linear feet

(LF). If accepted, line must be constructed prior to replacement of Residential Road water lines.

Completion of this line will be considered a milestone.

Payment will be made at the contract lump sum price according to the payment procedures for Bid

Options set forth in the Contract Documents.

K. Contract Line-Item 11, Sugarlands Water/Wastewater Option 6, Tree Removal

1. This item consists of all labor, materials, control measures and equipment to complete selective removal of trees in locations indicated on Drawings, identified as a part of this Option. Engage an accredited arborist, possessing qualifications acceptable to the Contracting Officer, to complete this work.

GRSM – 149368, 149285 01 27 00 - 3

2. Payment will be made at the contract lump sum price according to the payment procedures for Bid

Options set forth in the Contract Documents.

END OF SECTION 01 27 00

GRSM – 149368, 149285 01 31 00 - 1

PROJECT MANAGEMENT AND COORDINATION

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Definitions

2. Construction Coordination.

3. Submittals

4. Coordination Drawings.

5. Requests for Information (RFIs).

6. NPS/DSC SharePoint Project Website.

7. Project meetings.

8. Environmental Coordination.

9. Permits

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

4. Section 01 91 14 “Total Building Commissioning” for coordinating the work with Government’s

Commissioning Authority.

5. Section 02 41 13 “Selective Site Demolition” for coordinating permitting and site demolition work

1.2 DEFINITIONS

A. Agency with Jurisdiction

B. Construction Permits - Contractor Provided

1.3 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

GRSM – 149368, 149285 01 31 00 - 2

5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

C. Coordinate work for this Project with other Government projects which will affect this project, as noted in

Section 011000 “Summary of Work.” Conduct coordination meetings with contractors and Contracting

Officers’ representatives as necessary to ensure efficient and coordinated completion of all work.

D. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Permit requirements.

7. Pre-installation conferences.

8. Project closeout activities.

9. Commissioning activities.

1.4 SUBMITTALS

A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.

1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination

Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements.

Provide alternate sketches to the Contracting Officer (CO) for resolution of such conflicts.

c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.

d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.

e. Indicate required installation sequences.

2. Sheet Size: At least 8-1/2 by 11 inches but no larger than 30 by 40 inches.

3. Number of Copies: Submit two opaque copies of each submittal. Contracting Officer will return one copy.

4. Refer to individual Sections for Coordination Drawing requirements for Work in those Section

B. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of visible

GRSM – 149368, 149285 01 31 00 - 3

ceiling-mounted devices relative to acoustical ceiling grid. Supplement plan drawings with section drawings where required to adequately represent the Work.

2. Plenum Space: Indicate subframing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within ceiling plenum to accommodate layout of light fixtures indicated on Drawings. Indicate areas of conflict between light fixtures and other components.

3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.

4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.

5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.

6. Mechanical and Plumbing Work: Show the following:

a. Sizes and bottom elevations of ductwork, piping, and conduit runs, including insulation, bracing, flanges, and support systems.

b. Dimensions of major components, such as dampers, valves, diffusers, access doors, cleanouts and electrical distribution equipment.

c. Fire-rated enclosures around ductwork.

7. Electrical Work: Show the following:

a. Runs of vertical and horizontal conduit 1-1/4 inches in diameter and larger.

b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire-alarm locations.

c. Panel board, switch board, switchgear, transformer, busway, generator, and motor control center locations.

d. Location of pull boxes and junction boxes, dimensioned from column center lines.

8.…