B08_Attachment_08_Price_Schedule_Rev_1_0004.pdf
PDF 51 KB Posted
- Attached to
- GRSM 149368 Rehabilitate Sugarlands Headquarters
- Solicitation number
- 140P2024R0032
About this file
This document is a Contract Price Schedule for Solicitation Number 140P2024R0032, which is a federal contract opportunity to rehabilitate the Sugarlands Headquarters and Headquarters Annex Building for the Great Smoky Mountains National Park.
The scope of work includes renovation of the Sugarlands Headquarters, replacement of the water system, and rehabilitation/replacement of the wastewater system. The solicitation also includes several optional line items, such as exterior trim work, repointing of site masonry, extension of the water/wastewater system, replacement of the sanitary sewer and manholes, improvements to the Sugarlands Pump House, water main replacement, tree removal, and pipe relining. Offerors are required to submit pricing for the base line items as well as all optional line items. Pricing is provided on a lump-sum basis for most line items, with some unit pricing for items such as stone repointing, wood flooring repairs, and plaster restoration. The solicitation is being issued by the Department of the Interior, National Park Service.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule National Park Service (NPS) - Denver Service Center (DSC)
Solicitation Number: 140P2024R0032
PARK - PMIS: GRSM - 149368
(Project Management Information System)
Developed Area: Great Smoky Mountains
Project Title: Rehabilitate Sugarlands Headquarters and HQ Annex Building
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Contract Line
Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price
1 Sugarlands Headquarters Renovation 1 LS
2 Water System Replacement 1 LS
3 Wastewater System Rehab/Replacement 1 LS
TOTAL BASE PRICE (Contract Line Item Number 1 through 3) ---------------------------------------------------------------------------------
4 Headquarters Option 1 (Ext. Trim) 1 LS
5 Headquarters Option 2 (Repoint Site Masonry) 1 LS
6 Water/Wastewater Option 1 (Extended System) 1 LS
Water/Wastewater Option 2 (Replacement of
Sanitary Sewer)
1 LS
Water/Wastewater Option 3 (Replacement of
Sanitary Manholes)
1 LS
Water/Wastewater Option 4 (Sugarlands Pump
House Improvements)
1 LS
Water/Wastewater Option 5 (Install 6-in HDPE Water
Main by Pipe Bursting Existing 4-in Main)
1 LS
11 Water/Wastewater Option 6 (Tree Removal) 1 LS
12 Water/Wastewater Option 7 (CIPP-Line Pipes) 1 LS
TOTAL OPTIONS PRICE (Contract Line Item Number 4 through 12) --------------------------------------------------------------------------
TOTAL PROPOSED PRICE ------------------------------------------------------------------------------------------------------------------------------------
UNIT PRICES (Refer to Section 01 22 00 "Unit Prices" for Definitions
1 Stone Repointing 1200 LF
2 Plug Repairs to Wood Flooring 100 EA
3 Wood Flooring Replacement 150 SF
4 Interior Plaster Restoration 3500 SF
5 Roof Slate Resetting/Replacement 100 EA
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.