B11_140P2023R0020_NAMA_318722_PreProposalConfSlides_20230306_0001.pdf

PDF 2 MB Posted

Attached to
NAMA 318722 Rehabilitate Seawalls and Shoreline
Solicitation number
140P2023R0020
Issued by

About this file

This pre-proposal presentation outlines requirements for a design-build contract to rehabilitate seawalls and shorelines within the National Mall and Memorial Parks. The scope of work includes designing and constructing repairs to approximately 6,400 linear feet of historic seawalls, restoring historic landscaping, and providing flood protection across four zones. Offerors must complete design to 100% and construction within 1,248 days from notice to proceed. The presentation identifies sequencing preferences and notes two concurrent infrastructure projects that may impact access. The two-phase solicitation will evaluate offerors on technical approach, past performance, technical and schedule details, and price before selecting up to three for phase two proposals and final award. Compliance with small business participation goals and prevailing wage determinations is required. No site visit is scheduled but offerors are expected to inspect the work areas and consider access restrictions. Questions are due by the date specified, with answers provided to all offerors via SAM.gov.

View the file

Other files

File Type Posted
B08_Attch_07_NAMA_318722_NPS_Checklists_Amend0002_20230314_0002.pdf PDF
B12_RFP_QuestResp_140P2023R0020_NAMA_318722_20230314_0002.pdf PDF
Sol_140P2023R0020_Amd_0002.pdf PDF
B08_140P2023R0020_NAMA_318722_Amendment_02_0002.pdf PDF
Sol_140P2023R0020_Amd_0001.pdf PDF
B11_140P2023R0020_NAMA_318722_Pre-proposal_Conf_Attendance_20230306_0001.pdf PDF
B08_140P2023R0020_NAMA_318722_Amendment_01_Prepreposal_Conference_0001.pdf PDF
B08_Attch_03a_NAMA_318722_BDR_01to850.pdf PDF
B08_Attch_09_SubKPlanForm.docx DOCX document
B08_Attch_02a_NAMA_318722_Project_Prrogram_1thru53.pdf PDF
B08_Attch_04_NAMA_318722_SD_PrefAlt_DwgsB.pdf PDF
B08_Attch_03b_NAMA_318722_BDR_851to1713.pdf PDF
B08_Attch_01_NAMA_318722_Design-Build_Project_Scope.pdf PDF
B08_Attch_05_NAMA_318722_Specs.pdf PDF
B08_Attch_02b_NAMA_318722_Project_Program_54thru94.pdf PDF
B08_Attch_04_NAMA_318722_SD_PrefAlt_DwgsA.pdf PDF
B08_Attch_06_NAMA_318722_Geotech_Data_Rpts.pdf PDF
Sol_140P2023R0020.pdf PDF
B08_PreProposal_Conf_Registration_Instructions_NAMA_318722_20230222.pdf PDF
B08_Attch_08_Wage_Determination_DC20230001_2023-01-06.pdf PDF
B08_Attch_07_NAMA_318722_NPS_Checklists.pdf PDF
B08_140P2023R0020_NAMA_318722_SF1442_Clauses_20230222.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Proposal Conference & Project Overview Rehabilitate Seawalls and Shoreline at National Mall and

Memorial Parks

E X P E R I E N C E Y O U R A M E R I C A

PMIS #: NAMA 318722

Solicitation: 140P2023R0020

March 6, 2023

AGENDA

• Introductions

• Project Overview

• Scope of Work

• Project Area

• Sequencing

• General Information

• Solicitation Information

• Solicitation Questions

• Conclusion

E X P E R I E N C E Y O U R A M E R I C A

Complete the design of the project to a 100% Final level of completion.

The restoration of approximately 6,400 linear feet of historic seawall which has experienced settlement and loss of fill.

Restore the historic landscaping and provide a level of protection against flooding.

Permitting/compliance.

See Design-Build scope in the solicitation.

3E X P E R I E N C E Y O U R A M E R I C A

PROJECT OVERVIEW

Project Scope

4E X P E R I E N C E Y O U R A M E R I C A

Project Area

5E X P E R I E N C E Y O U R A M E R I C A

Four Seawall Zones

West Potomac Park North

West Potomac Park South

Tidal Basin West

Tidal Basin East

Schedules which demonstrate an ability to provide substantial completion of design and construction for the Tidal Basin (CLINs 0002 AND 0003) prior to June 01, 2026, will be viewed more favorably.

Both Tidal Basin and West Potomac Park can be completed concurrently.

E X P E R I E N C E Y O U R A M E R I C A

Sequencing Plan

General Contract Information

• The work shall be conducted within 1248 days from NTP, negotiable.

• At this time, there are two larger projects that will be occurring in and around the Tidal Basin and West Potomac Park with similar schedules. Site access and staging areas may be.

1. The DC Water Potomac River Tunnel Project will directly affect the West Potomac Park portion of the seawall project in two locations along the river. An approximately 5.5-mile-long tunnel with an inside diameter of 18 feet will be mined from a shaft to be constructed within West Potomac Park. An emergency overflow structure will also be constructed along the Potomac River near the mining shaft. This area may be restricted from Seawall contractor access based on the timing of both projects occurring at the same time. The tunneling project will likely start prior and continue for several years after the Seawall project.

2. The Long Bridge Project is located south of this project and will have minimal spatial impact to this project. Given the “in-water” nature of the work, this project may impact the availability of marine contractors, marine equipment, and materials.

• Access to site, in areas near the Jefferson memorial, via security gate(s), screening of all deliveries is required, refer to contract documents for specific requirements.

E X P E R I E N C E Y O U R A M E R I C A

Design-Build Project Scope Project Program Basis of Design Report Schematic Design Preferred

Alternative (Drawings) Project Specifications Geotechnical Data Reports NPS Constructability, Sustainability Checklists & Permit Assessment Form

TECHNICAL DOCUMENTS

• Two-Phase Design-Build Procedures, FAR 36.3

• Phase One Qualifications Evaluation Selection of up to three (3) most highly qualified offerors to request a Phase 2 proposal submission

• Phase Two Proposal Evaluation

• Tradeoff Analysis

• Selection

SECTION M EVALUATION PROCESS

1. FORMAT: One electronic copy submitted via email

2. ORGANIZATION:

FACTOR 1 – GENERAL TECHINCAL APPROACH

FACTOR 2 – TECHNICAL QUALIFICATIONS

• Designer & Prime Construction Contractor

FACTOR 3 – PAST PERFORMANCE

PHASE ONE BUSINESS PROPOSAL

SECTION L: PHASE ONE TECHNICAL PROPOSAL

1. FORMAT: One electronic copy submitted via email

2. ORGANIZATION:

FACTOR 4 – TECHNICAL SOLUTION

FACTOR 5 – SCHEDULE

FACTOR 6 – SMALL BUSINESS PARTICIPATION

FACTOR 7 – PRICE

• Instructions for completing the Section B Contract Price Schedule in Note

PHASE TWO BUSINESS PROPOSAL

SECTION L: PHASE TWO TECHNICAL PROPOSAL

• Special Requirement H.3, Solicitation Section L, and Solicitation Section M describe this requirement.

• If at any point during the performance of the contract it becomes apparent that the plan will not be met a recovery plan will be requested, and adherence to the plan will be appropriately documented in the past performance record.

• Small Business Participation is separate from the Small Business Subcontracting Plan requirements at FAR 52.219-9

SMALL BUSINESS PARTICIPATION

• A sample plan template is attached to the solicitation. The Subcontracting Plan does not receive a rating and the award is not made until the subcontracting plan is acceptable. The clauses 52.219-9 and 52.219-16 provide further detail.

The plan is only required to be submitted by large businesses. Small businesses prime contract offerors do not need to submit a subcontracting plan.

• The plan should demonstrate the contractor’s proposed subcontracting percentages as they relate to the proposed amount and the small business goals identified in the solicitation.

SMALL BUSINESS SUBCONTRACTING PLAN

• Wage Determination:

• See current solicitation and any amendments for applicable Wage

Determination

• Ensure all subcontractor’s wages incorporate the current wage determination rates into their proposals.

• Work Hours:

• Ensure the work hours identified in Division 1 are considered when developing your proposed schedule

• Self-Performance:

• Clause 52.236-1 identifies the prime contractor self-performance requirement, the prime contractor is required to perform on site, with its own organization 12% of the total amount of work to be performed under the contract.

WAGE DETERMINATION / WORK HOURS / SELF

PERFORMANCE

• No formal organized site visit at the work location is planned

• The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation.

Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

• The virtual pre-proposal conference is not implied to relieve an offeror’s responsibilities pursuant to inspect the work area pursuant to the clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work.

DISCLAIMER:

Any information obtained from either site visit meeting shall not be interpreted as additional contract requirements or changes to the contract requirements. All terms and conditions are documented within the solicitation and its amendments. All proposals shall be based upon those documents.

SITE VISIT

• Submit all questions in writing to:

• aaron_vollbracht@nps.gov

• bryan_pemberton@nps.gov

• Government responses will be provided to all offerors via the SAM.gov advertisement

• Identities of offerors will be redacted

• Submit questions no later than 10 days prior to proposal due date

• Questions submitted after this time may not receive a Government response

SOLICITATION QUESTIONS

mailto:aaron_vollbracht@nps.gov mailto:bryan_pemberton@nps.gov

�Pre-Proposal Conference & Project Overview�Rehabilitate Seawalls and Shoreline at National Mall and Memorial Parks
AGENDA
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
PROJECT OVERVIEW�General Contract Information
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16

File details come from the government source that posted it. Updated .