B08_DB_RFP_Body_140P2022R0105_-_GLBA_266667_Amd1_0001.pdf
PDF 155 KB Posted
- Attached to
- GLBA 266667-Replace Concessioner Housing
- Solicitation number
- 140P2022R0105
About this file
This solicitation document requests proposals for the replacement of concessioner housing and maintenance buildings at Glacier Bay National Park and Preserve in Alaska. Offerors are invited to submit Phase 1 proposals by June 13th, 2022 for consideration to participate in Phase 2. Up to three offerors will be selected to submit Phase 2 proposals within 14 calendar days of invitation. The selected awardee will receive a single contract to complete the design-build project. Relevant details include conducting work in federal buildings, requiring key personnel, and adhering to specifications in the solicitation attachments.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 6/1/2022 Amd 1
Document No.
140P2022R0105
Document Title GLBA 266667 – Replace Concessioner Housing (DB)
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.
(b) The use in this solicitation of any Department of Interior Acquisition Regulation (48 CFR Chapter 14) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of provision)
INSTRUCTIONS FOR THE SUBMISSION OF OFFERS AND OTHER INFORMATION –
COMPETITIVE SOURCE SELECTION
A. GENERAL
1. Submit, at a minimum, an offer that conforms to the solicitation documents. By submission of an offer, the offeror unconditionally assents to the terms and conditions in this solicitation, and in any solicitation attachments.
Proposals offering alternative stipulations to the requirements of this solicitation will NOT be considered or accepted.
2. Offerors shall submit proposals and the Government will conduct the source selection process per the following
Two-Phase Design-Build Selection Procedures, in accordance with FAR 36.3: Offerors are invited to submit Phase 1 proposals, as outlined in this Section L provision of the solicitation. After evaluation of Phase 1 proposals, the Government will select up to three (3) Offerors to participate in Phase 2 of this solicitation. The Contractor Officer will notify those selected to participate in Phase 2 and those not selected by letter, using electronic means (i.e. email). The Government intends to award a single contract as a result of this solicitation.
B. QUESTIONS
Pre-Proposal Questions shall be submitted no later than 12:00 pm MT June 13th, 2022, via email, to the following:
• Contracting Officer, Amber Hughes – amber_hughes@nps.gov
• Contract Specialist, Kat O’Neil-Dreher - kathleen_oneil-dreher@contractor.nps.gov
C. OFFER DUE DATE AND LOCATION
To be considered for selection to Phase 2 and any potential award, Phase 1 proposals must be received no later than the date and time noted in Block 13.a of the SF-1442 contained in this solicitation. Phase 2 proposals must be received by the date and time established upon invitation to participate in Phase 2 of this solicitation. The Government anticipates that Phase 2 proposals will be required 14 calendar days after the invitation is sent to selected Offerors.
D. SUBMISSION REQUIREMENTS
1. Proposals shall be submitted via email. Proposals submitted via any means other than email will not be accepted.
2. Proposals shall be sent to all of the following:
• CS_DSC_Proposal_Submission@nps.gov
• Contracting Officer, Amber Hughes - amber_hughes@nps.gov
• Contract Specialist, Kat O’Neil-Dreher - kathleen_oneil-dreher@contractor.nps.gov
3. Subject lines for all proposal submissions shall contain the solicitation number, Park-PMIS, and number of total emails, per the following example: “140P2022R0105, GLBA 266667, email 1 of 2.”
4. Submit proposals for Phase 1 ONLY. If selected to participate in Phase 2, proposal shall be submitted in separate VOLUMES (I & II), in the FORMATS specified, containing the CONTENTS required. Each volume shall be submitted in separate email attachments.
5. Individual emails, inclusive of attachments, shall be no larger than 38MB.
mailto:amber_hughes@nps.gov mailto:kathleen_oneil-dreher@contractor.nps.gov mailto:CS_DSC_Proposal_Submission@nps.gov mailto:amber_hughes@nps.gov mailto:kathleen_oneil-dreher@contractor.nps.gov
| PART I – THE SCHEDULE |
| SECTION A – SOLICITATION / CONTRACT FORM |
| SECTION B – BID SCHEDULE |
| SECTION C – SPECIFICATIONS / DRAWINGS |
| SECTION D – packing and marking |
| SECTION E – Inspection and Acceptance |
| SECTION F – Deliveries or Performance |
| 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) |
| 52.211-12 Liquidated Damages—Construction (SEPT 2000) |
| 52.211-13 Time Extensions (SEPT 2000) |
| 52.242-14 SUSPENSION OF WORK (APR 1984) |
| SECTION G – Contract Administration Data |
| 1452.201-70 Authorities and delegations (SEPT 2011) |
| 1452.204-70 RELEASE OF CLAIMS—DEPARTMENT OF THE INTERIOR (JUL 1996) |
| NOTICE TO CONTRACTORS - CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC 2015) |
| ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INTERNET PAYMENT PLATFORM (APR 2013) |
| SECTION H – Special Contract Requirements |
| Special requirement 1: key personnel |
| SPECIAL REQUIREMENT 2: Working in federal buildings or federally controlled indoor workspaces |
| 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996) |
| PART II – Contract Clauses |
| SECTION I – Contract Clauses |
| 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) |
| 1452.203-70 RESTRICTIONS ON ENDORSEMENTS (JUL 1996) |
| 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (jUNE 2020) |
| 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021) |
| 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES AND EQUIPMENT (NOV 2021) |
| 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF THE INTERIOR (APR 1984) |
| 52.219-14 LIMITATIONS ON SUBCONTRACTING (SEP 2021) (DEVIATION SEP 2021) |
| 52.223-9 Estimate of Percentage of Recovered Material Content for EPA- Designated Products (May 2008) |
| 52.225-11 BUY AMERICAN – CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2021) |
| 1452.228-70 Liability Insurance. (JUL 1996) |
| 52.236-1 Performance of Work by the Contractor (apr 1984) |
| 52.236-2 Differing Site Conditions (apr 1984) |
| 52.236-3 Site Investigation and Conditions Affecting the Work (apr 1984) |
| 52.236-4 Physical Data (apr 1984) |
| 52.236-5 Material and Workmanship (apr 1984) |
| 52.236-6 Superintendence by the Contractor (apr 1984) |
| 52.236-7 Permits and Responsibilities (nov 1991) |
| 52.236-8 Other Contracts (apr 1984) |
| 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (apr 1984) |
| 52.236-10 Operations and Storage Areas (apr 1984) |
| 52.236-11 Use and Possession Prior to Completion (apr 1984) |
| 52.236-12 Cleaning Up (apr 1984) |
| 52.236-13 Accident Prevention (nov 1991) |
| 52.236-14 Availability and Use of Utility Services (apr 1984) |
| 52.236-15 Schedules for Construction Contracts (apr 1984) |
| 52.236-17 Layout of Work (Apr 1984) |
| 52.236-21 Specifications and Drawings for Construction (feb 1997) - Alternate I (1984) |
| 52.236-22 DESIGN WITHIN FUNDING LIMITATIONS (APR 1984) |
| 52.236-23 RESPONSIBILITY OF THE ARCHITECT-ENGINEER CONTRACTOR (APR 1984) |
| 52.236-25 REQUIREMENTS FOR REGISTRATION OF DESIGNERS (JUN 2003) |
| 52.236-26 Preconstruction Conference (feb 1995) |
| 1452.236-70 Prohibition Against Use of Lead-based Paint (jul 1996) |
| 52.252-6 Authorized Deviations in Clauses (Nov 2020) |
| PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS |
| SECTION J – List of Attachments |
| PART IV – REPRESENTATIONS AND INSTRUCTIONS |
| SECTION K – Representations, Certifications and Other Statements of Offerors |
| 52.204-8 annual representations and certifications (JAN 2022) |
| 52.204-24 Representations Regarding Certain Telecommunications and Video Surveillance Services and Equipment (nov 2021) |
| 52.204-26 Covered Telecommunications Equipment or Services-Representation (OCT 2020) |
| 52.209-7 Information Regarding Responsibility Matters (OCT 2018) |
| 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (NOV 2021) |
| SECTION L – Instructions, Conditions and Notices to OFFERORS |
| 52.252-1 PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) |
| 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (June 1988) |
| 1452.215-71 Use and Disclosure of Proposal Information—Department of the Interior (apr 1984) |
| 52.216-1 Type of Contract (apr 1984) |
| 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (feb 1999) |
| 52.225-12 Notice of buy american requirement – construction materials under trade agreements (may 2014) |
| 52.228-1 BID Guarantee (sep 1996) |
| 52.233-2 Service of Protest Department of the Interior (sept 2006) (Deviation) (JUL 1996) |
| 52.236-27 Site Visit (Construction) – alternate I (feb 1995) |
| 52.252-5 Authorized Deviations in Provisions (Nov 2020) |
| Instructions for the Submission of Offers and Other Information – Competitive Source Selection |
SECTION M – Evaluation Factors for Award
File details come from the government source that posted it. Updated .