Sol_140P2021R0153_Amd_0003.pdf
PDF 94 KB Posted
- Solicitation number
- 140P2021R0153
About this file
This document is an amendment to a solicitation for design-build services. The National Park Service is seeking proposals for the Moraine Park Campground and Headquarters Utilities project located in Rocky Mountain National Park, Colorado. Through this amendment, the period of relevant project experience being considered is expanded from five to ten years. Additionally, previously obtained past performance questionnaires from agencies like NAVFAC and USACE will be accepted if included with proposals. The solicitation requests information in three factors: relevant project experience of up to eight projects in the last ten years, qualifications of key personnel, and past performance references. Proposers should complete one SF330 form and include any additional details to fully address the experience and qualifications requested in Factors 1 and 2. No SF1442 form is required for acknowledging amendments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P2021R0153_Amd_0005.pdf | ||
| SF330_0004.docx | DOCX document | |
| Sol_140P2021R0153_Amd_0004.pdf | ||
| Sol_140P2021R0153_Amd_0002.pdf | ||
| Sol_140P2021R0153_Amd_0001.pdf | ||
| SF330.pdf | ||
| Past_performance_Questionnaire.docx | DOCX document | |
| Project_Experience_Form.docx | DOCX document | |
| B08_Solit_DB_RFCPh1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2021R0153 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
09/28/20210003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/16/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROMO/239689: Moraine Park Campground and HQ Utilities- Design-Build-GAOA
Amendment 0003 is issued to incorporate Questions and Answers into the solicitation.
Question 1: In the opening statement of FACTOR 1-PROJECT EXPERIENCE, it states
"Submit...EIGHT (8) relevant projects completed in the last 10 years. However, later in section the requirements read Project(s)...shall have been completed, including all options, within the past five years of issuance of the RFP. Please clarify if the period of consideration for relevant experience is the last five or last 10 years so offerors can best assess their qualifications and experience for this contract.
Answer 1: Correct FACTOR 1-PROJECT EXPERIENCE, paragraph 4, second sentence, from "...and
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Bai Perney
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2021R0153/0003 shall have been completed, including all options, within the past five years of issuance of the
RFP." to "...and shall have been completed, including all options, within the past 10 years of issuance of the RFP."
Question 2: Will previously obtained Federal /
DoD past performance questionnaires (e.g.
NAVFAC/USACE Form PPQ-0; sample attached) be accepted as compliant with requests for PPQ in
Factor 3 Past Performance, provided they can be included with the proposal (not incorporated by reference.)
Answer 2: Yes.
Question 3: Page 2, Factor 1 paragraph 1, says we can up to eight projects "completed within the last 10 years." On page 3, the third paragraph down also says "within the past ten (10) years."
However, on page 3 at the end of the second paragraph, it says "within the past five years."
Answer 3: See Question 1.
Question 4: We did not see an SF 1442 in the solicitation documents. We will need that document for acknowledging amendments, etc. Will this be posted on Sam.Gov.
Answer 4: SF 1442 is not part of Design-Build
Phase 1 process. Your acknowledgement is submitting the signed amendments with your response.
Question 5: The solicitation requires Factors 1, 2 and 3, but does not state where in the proposal to include the SF330 document sections that are not a part of those three Factors (i.e., A, B, C, G, H, etc.).
Answer 5: Please complete SF330 per the instructions on pages 1-8. Factor 1, submit the attached "Project Experience" form addressing specific experience elements below for up to
EIGHT (8) relevant projects completed in the last
10 years, and to supplement SF330 as Section F has limited space. Factor 2, at a minimum, resumes for the following personnel will be included in the standard form 330: Civil/Water
Engineer, Electrical Engineer, Mechanical
Engineer, Landscape Architect, Cost Estimator, Architect, Project Engineer, Project Manager, Superintendent, Quality Control Manager, Safety
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2021R0153/0003
Manager. These information are captured in
Sections C through G. Provide additional pages if more information are needed to support the key personnel's experiences and qualifications.
Question 6: Should the SF330 document be included as an attachment to Factors 1, 2 and 3?
Answer 6: There should only be one (1) SF330 submitted. Make sure all information in Factors
1 and 2 are in the perspective sections of the
SF330. If you run out of space, then note that there are additional attached pages to support your response. For Factor 1, "...Each Offeror shall complete and provide the attached standard form 330 for the AE and GC on the DB team and documentation sufficient to demonstrate the extent of the Offeror's past experience for at least three (3)..." For Factor 2, "...At a minimum, resumes for the following personnel will be included in the standard form 330... Resumes should demonstrate that Key Personnel have participated on the projects listed in Factor 1 or projects similar to this project and have the requisite qualifications and experience to perform the work requirements."
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .