Sol_140P2021R0153_Amd_0001.pdf
PDF 89 KB Posted
- Solicitation number
- 140P2021R0153
About this file
This document is an amendment to a solicitation for the ROMO/239689: Moraine Park Campground and HQ Utilities- Design-Build-GAOA project. The National Park Service seeks a design-build contractor team to provide design and construction services. The amendment incorporates questions and answers to clarify submission requirements. For project experience, offerors must demonstrate design portions of relevant projects were completed within the past ten years using the Project Experience form or SF330 Section F. All sections of the SF330 must be submitted for the prime contractor and architectural/engineering firm. Resumes per SF330 Section E are required for key personnel. CPARS ratings may substitute for Past Performance Questionnaires where applicable. The solicitation number is 140P2021R0153 and responses are due by the time and date specified in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P2021R0153_Amd_0005.pdf | ||
| SF330_0004.docx | DOCX document | |
| Sol_140P2021R0153_Amd_0004.pdf | ||
| Sol_140P2021R0153_Amd_0003.pdf | ||
| Sol_140P2021R0153_Amd_0002.pdf | ||
| SF330.pdf | ||
| Past_performance_Questionnaire.docx | DOCX document | |
| Project_Experience_Form.docx | DOCX document | |
| B08_Solit_DB_RFCPh1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2021R0153 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
09/22/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/16/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROMO/239689: Moraine Park Campground and HQ Utilities- Design-Build-GAOA
Amendment 0001 is issued to incorporate Questions and Answers into the solicitation.
Question 1: For Factor 1, Project Experience, it is not clear what form is required to demonstrate AE and GC Project Experience. Do we use the Project Experience form or do we use SF330 Section F?
Answer 1: For project experience in relevant construction, use the Project Experience form;
for project experience in Design-Build construction, use the SF 330, but the Project
Experience form can be used to supplement SF 330 if more information is needed.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Bai Perney
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2021R0153/0001
Question 2: For Factor 1, Project Experience, it is not clear if the projects should have been completed (i.e., designed and constructed) in the past 10 years or the past 5 years.
Answer 2: If offerors are submitting design-build project experiences, the design portion of the contract shall have been completed within the past ten (10) years of the date of issuance of this RFP. This means that the construction project can still be active but the design portion should be completed.
Question 3: Please clarify that we are to use the
SF330 Section E resume form for all resumes of all of the key staff listed on page 3 of 4 of the solicitation.
Answer 3: At a minimum, use SF330 Section E as resumes for personnel identified in Factor 2.
Offeror can provide supplemental resumes/information to better support the key personnel's experience identified in SF330.
Question 4: Please clarify that we may submit a
Contractor Performance Assessment Reporting
System (CPARS) rating in lieu of submitting a
Past Performance Questionnaire.
Answer 4: CPARS past performance is acceptable in lieu of Past Performance Questionnaire. Past
Performance Questionnaire is needed for projects that are not in CPARS.
Question 5: Please clarify that only SF330
Section E (resumes) and Section F (project experience) [or the Project Experience form] are to be submitted for the AE and the GC, and that the other sections of the SF330 (i.e., A, B, C, etc.) are not required to be submitted.
Answer 5: All sections of the SF330 are required to be submitted. Section A and B are information of the Architect and Engineering firm offeror will be teaming with or they are part of offeror's company. Section C should list the team for this solicitation project. In Section D, provide an Organization Chart of the Proposed
Team.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .