This document is an amendment to a federal solicitation for the partial replacement of concrete seawalls, new concrete sidewalk construction, and installation of stormwater drainage infrastructure including a lift station, pumps and controls at the Perry's Victory and International Peace Memorial. The National Park Service seeks these renovations and issues Amendment 0006 to incorporate answers to questions from offerors. The response due date remains August 23, 2021 at 2:00 PM MDT. The amendment provides clarification around certification requirements, reinforcement materials, payment for stored materials, asbestos details from prior drawings, and subcontractor small business qualifications.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2021R0133 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

08/17/20210006

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/15/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PEVI 200745 - Restore North and South Seawalls at Perry's Victory and International Peace

Memorial

Amendment 0006 is issued to to do the following:

1. Incorporate Questions and Answers.

2. The proposal due date remains August 23, 2021 at 2:00PM, MDT.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Bai Perney

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140P2021R0133 Amendment 0006

Questions and Answers

1. Question: Are the existing invert elevations available for the catch basins that are to be removed and replaced?

Answer: See provided survey that shows the existing catch basins elevations. The Contractor shall field verify prior to work beginning.

2. Question: Per Spec 01 40 00, a NICET certification is required for a number of the Concrete and Soils inspections. Would the Government consider waiving these certification requirements?

Answer: The certification requirements cannot be waived. However, ACI, ODOT and NETTCP certifications are acceptable for concrete and soil inspectors. Also see response to Question 31 in Amendment 0003.

3. Question: It appears the specifications call for plain reinforcement steel in the new concrete portion, Section 03 30 00. Is this the case or should the reinforcement be epoxy coated?

Answer: Epoxy coated reinforcement is not required. All reinforcement should be plain steel as detailed in the specifications.

4. Question: Will the contractor receive payment for delivered and approved materials before they are incorporated in the work, if the approved materials are delivered, accepted, and properly stored on the project or stored in acceptable storage places in the vicinity of the project?

Answer: Yes, stored materials may be invoiced via progress payment(s) per the Contractor's Schedule of Values (see Specification 01 31 00 and 01 32 16 for more information on Schedule of Values).

5. Question: In reference to the Government’s previous response to Question 34 in Amendment 0003, Would the Gov’t be able to provide any additional clarification on the dimensions of the “6-inch wide asbestos boards”? Are these 6-inch thick boards that are continuous through the entire cross-section of the seawall, or are they a thinner board that only extends into the seawall 6” from the surface? If there is a detail drawing from the 1976 As-Built drawings that show these joints and asbestos boards it would be very helpful.

Answer: See provided highlighted detail drawing from the 1976 As Builts and full As Built set provided for information only. Also see response to Question 44 in Amendment 0003.

6. Question: Small Business Participation Requirement – What proof is needed to provide that our subcontract / Supplier is a Small Business? Does the subcontractor need to be registered with the SAM.Gov?

Answer: Small businesses are self-certified. If the subcontractors are claiming HUBZONE, Women-owned, or SDVOSB, then they will have to be registered and certified through the Small Business Administration.

Subcontractors does not need to be registered in SAM.

1976 As Builts‐For information only