This document summarizes a pre-proposal conference for a federal solicitation seeking restoration of concrete seawalls and installation of a new stormwater drainage system. The National Park Service is soliciting proposals to partially replace over 3,300 linear feet of deteriorated concrete seawalls and install a new stormwater drainage system including two lift stations and controls at Perry's Victory and International Peace Memorial. The pre-proposal conference presentation provided an overview of the project scope, which includes restoring the seawalls, improving stormwater management, and enhancing the visitor experience. Offerors must submit any questions by August 6, 2021, with proposals due August 16, 2021. The project is estimated to exceed $10 million and must be completed by November 30, 2023.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2021R0133 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
07/27/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/15/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PEVI 200745 - Restore North and South Seawalls at Perry's Victory and International Peace Memorial
Amendment 0002 issued to do the following:
1. Change the time of the preproposal site visit from 9:00 am ET to 10:00 am ET to be held on Thursday July 29th, 2021.
2. To attach the preproposal meeting sign-in sheet.
3. Post the virtual preproposal meeting slidedeck.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Bai Perney
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
United States Department of the Interior
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
12795 W. Alameda Parkway
P.O. Box 25287 Denver, Colorado 80225-0287
Pre-Bid Sign-in Sheet
Date: 9:00 a.m. EDT; Tuesday, July 27, 2021 Project: PEVI 200745 - Restore North and South Seawalls at Perry's Victory and International
Peace Memorial Solicitation #: 140P2021R0133
Name Company Telephone e-mail Dennis Brookie NPS-DSC 303-969-2493 dennis_brookie@nps.gov
Bai Perney NPS-DSC 303-987-6766 bai_perney@npd.gov
Jesse DeCoteau NPS-DSC (720) 415-1832 jesse_decoteau@nps.gov
Joy Ewalt NPS-DSC 303-969-2394 joy_ewalt@nps.gov
Rodney Karr Perry's Victory and International Peace
Memorial 419-285-2184 x1236 rodney_karr@nps.gov
Emma Blanch Jacobs - emma.blanch2@jacobs.com
McKenzie Banahan Jacobs - mckenzie.banahan@jacobs.com
Derek Lobedan Jacobs - derek.lobedan@jacobs.com
Michele Holland Jacobs - michele.holland@jacobs.com
Quinn Lawrence E.S. Wagner CO. 419-467-3208 qlawrence@eswagner.com
Derrek Offutt International Subsea Consulting 832-257-0813 doffutt@int-subsea.com
Matt Wilson Kokosing Industrial 216-288-1501 maw2@kokosing.biz
Patrick Lilienthal Kokosing Industrial 614-914-9779 jpl2@kokosing.biz
Mike Pasche Luedtke Engineering Company 231-352-9631 mike.pasche@luedtke-eng.com
Pat Cervenik Nerone & Sons 216-662-2235 pat@nerone.biz
Damon Halsey UFP Industries (513) 200-6505 damon.halsey@ufpi.com
Ryan Frazier Arrowhead Contracting - rfrazier@arrowheadbuild.com
Pre-Proposal Teleconference
PERRY'S VICTORY AND INTERNATIONAL PEACE
MEMORIAL
RESTORE NORTH AND SOUTH SEAWALLS AT PERRY’S
VICTORY TO SAFEGUARD SITE
Solicitation: 140P2021R0133
NPS PMIS #: PEVI 200745
THIS MEETING WILL BE RECORDED
July 27, 2021
E X P E R I E N C E Y O U R A M E R I C A
AGENDA
• INTRODUCTIONS (Contracting)
• Attendees List will be included in an amendment
• Meeting Participation logistics – Agenda posted with Solicitation amendments
• PROJECT OVERVIEW - SITE LAYOUT AND ORIENTATION (A/E)
• PROJECT OVERVIEW - SCOPE OF WORK – OVERALL (A/E)
• SITE /PROJECT CONSIDERATIONS (Project Manager)
• BID INFORMATION (Contracting)
• BID CLINS (Contracting)
• PRE-PROPOSAL CONFERENCE QUESTIONS (Contracting)
• CONCLUSION
P r o j e c t O v e r v i e w
NPS – Restore North and South Seawalls at Perry’s Victory
1. Site Background
2. Project Background
3. Seawall Scope
4. Stormwater Scope
5. Existing Utilities
6. Landscape Improvements
7. Construction
• The Park sits at the site of Perry’s Victory on a low-lying isthmus connecting the east and west sides of South Bass Island. Historically, Put-in-Bay was two separate islands with marsh in between. Without the seawalls the site would return to marsh habitat.
• The seawalls protecting the site were originally constructed in 1936 to protect the site from Lake Erie and prevent shoreline erosion.
• The seawalls have been raised and expanded, most recently in 1976, to better maintain and protect the nationally significant site.
Site Background
Historic image of the site
Historic image of the site
Presenter Presentation Notes Let’s start with the site background. Historically Put in Bay was two separate islands with marsh in between- Which is now the site of the Perry’s Victory & International Peace Memorial.
Flooding is an issue the park has been dealing with since the monument was built and the seawalls are a direct response to protect the site and prevent shoreline erosion.
The original seawall was constructed in 1936. In 1976 the north seawall was raised and expanded to the east and west. The south seawall was also rebuilt further into Lake Erie.
Project Background
• Restore the existing seawalls to prevent further deterioration and undermining.
• Limit wave overtopping and manage stormwater at the project site.
• This project will ensure the integrity of the historic Perry’s Victory International Peace Memorial monument and ensure safe and appropriate visitor opportunities within the historic landscape of the Park.
View of the monument and north seawall
Presenter Presentation Notes The purpose of this project is to restore the existing seawalls, limit wave overtopping and to manage stormwater at the project site. The project protects the cultural resource of the site (the monument), helps ensure the health and safety of the public, and enhances the visitor experience.
Project Background- Need for Action
• The current condition of the seawalls is poor.
With significant deteriorate and undermining issues at certain sections.
• If the seawalls are not restored, deterioration will continue, and the memorial would not be adequately protected.
• The stormwater drainage system is not adequately sized to manage large rainfall events. Access to the east side of the island has been impacted by flooding at the site. Significant flooding throughout the site would continue to occur.
Deterioration at the south seawall
Wave over-topping at the north seawallFlooding throughout the Park following a storm event
Presenter Presentation Notes The need for the project is a result of decades of extreme environmental conditions which have led to the current poor condition of the seawalls. Significant undermining and deterioration has occurred and would continue to occur if the seawalls are not restored.
Additionally, the stormwater drainage system is not adequately sized to manage large rainfall events causing flooding at the site which impedes travel between the east and west sides of South Bass Island.
Explain pictures
Project Scope
• Restore Seawall
• Improve Stormwater System
• Improve Visitor Experience- Landscape Architecture
Legen d
Stormwater LineSidewalk Project Area
Restored Seawall
Elements of the NPS proposal
Presenter
The project scope includes the three components, restoring the seawalls, improving the stormwater system and improving the overall visitor experience at this site.
Seawall Scope
• 3,340 linear feet of seawalls will be restored to address deterioration and raised to a new elevation ranging 12-24” above existing.
• North Seawall-Center which was built in 1936 will be entirely demolished and replaced.
• The remaining North Seawall will be partially demolished and repaired.
• The South Seawall will be partially demolished and repaired.
• An 80-foot extension will be added to the South seawall.
Seawall Designation
Presenter Presentation Notes Just over 3,300 linear feet of seawalls will be restored and raised one to two feet above the existing height. The seawall height was carefully considered to balance decreasing wave overtopping while maintaining existing viewsheds.
The location, material and profile of the restored seawall will match the existing seawall.
The North Center Section of seawall (located here) will be fully demolished and replaced. All other portions of the north and south seawalls will be partially demolished and rebuilt to the raised height.
An 80-foot extension would be added to the south seawall (located here).
We did a dive inspection and found that there is also one underwater spall repair that needs to be completed on the south seawall.
Existing Raised Section Partially Demolished
Presenter Presentation Notes The images show the partially demolished and replaced seawall segments, the top approximately 3 feet of the existing seawall would be removed and rebuilt to a higher height.
This applies to the North East, North West and South Seawalls.
The demolition needs to be done in away not to damage or affect the structural integrity of the wall to remain.
Existing New South West Extension
Presenter
The images show the new south seawall west extension. This exposed area that is currently a planter would be replaced with new rip rap and a concrete seawall extension.
Existing New North Center Section
Presenter Presentation Notes The north center section of seawall is being replaced entirely. The existing wall will be demolished and replaced with a new Galveston wall which has a similar profile to the existing NW and NE walls. We did have the opportunity to revisit different options for the reconstruction but found the Galveston profile results in the lowest elevation with the same overtopping results compared to other profiles.
A low seawall elevation was desired to maintain existing viewsheds and to maintain the existing visitor experience.
Stormwater Scope
• The stormwater system will be upgraded to minimize flooding.
• Lake water that overtops the wall and stormwater that lands in the Park will be conveyed to the lake through a combination of gravity outlets and two packaged pumping stations.
• A hydrodynamic vortex separator is proposed to treat stormwater for the north catchment area prior to discharge.
Elements of the NPS proposal
Presenter Presentation Notes Next we have the proposed stormwater system improvements.
The existing stormwater system relies on gravity flow. Due to high lake levels in Lake Erie, drainage is not occurring and water is backing up into the park.
The proposed system resolves this by tying existing catch basins together, adding two packaged pump stations in the NW corner of the site (here) and the SE corner of the site (here). Stormwater and water that overtops the wall would be drained through the system and pumped into Lake Erie.
The proposed stormwater system also includes a vortex separator for the north catchment area. The vortex separator would provide additional pretreatment of water coming from the north catchment area which contains hardscapes. Hardscapes are impervious areas where water cannot seep into the ground – in this case we are referring to state highway 357 and the proposed north sidewalk.
Existing Utilities North Seawall
• UGT (telephone), Frontier Communications: UGT will be abandoned in place and permanently relocated to south side of S.R. 357. Relocation work will be performed by the utility in 2021.
• CATV (cable television), Spectrum Charter: CATV will be temporarily relocated above ground to the south side of S.R. 357 during construction.
• UGE (electric), Ohio Edison: UGE will be temporarily relocated overhead on the south side of S.R. 357 during construction. Contractor to install (2) 6-inch conduit along north seawall before backfilling for Ohio Edison to reestablish service underground after construction is completed.
• Water, Put-In-Bay Water Department: An existing 8” PVC water main will be lowered in 2 locations to maintain required separation from new storm drain. This work will be performed by the Contractor and is included in the Contract Documents.
South Seawall
• Sanitary Sewer - No relocation required.
Landscape Improvements
• New Planting Beds
• New South Seawall Sidewalk
• Seating areas with benches (optional)
• Embedded Lighting (optional)
• North Seawall Sidewalk (optional)
• Interpretive Plaza (optional)
Rendering of the south seawall and seating area Rendering of the north seawall and new sidewalk
Locations of visitor experience elements
Presenter Presentation Notes These renderings show some of the site improvements that are part of this project. The sidewalk at the South Seawall will be raised relative to the seawall increase.
A new sidewalk along the North Seawall is proposed as an option along with seating areas with benches at both seawalls.
Embedded step lighting within the seawalls is also being considered.
Some of these items are optional and NPS will decide if all options will be completed or selected options based on pricing.
Landscape Improvements
Presenter Presentation Notes This image shows the new planting beds at the North West property boundary. This is being installed to mask some of the utilities in that corner.
Some plants will also be installed on top of the RipRap at the South West Extension.
Landscape Improvements - Interpretive Plaza
• Interpretive Plaza will illustrate plan view of the decks of the
US Brig Niagara and the HMS Detroit from the Battle of Lake Erie in the War of 1812.
• New wayfinding panels will help visitors connect with history and learn more about the memorial.
Location of Interpretive plaza
Interpretive Plaza Rendering
Engraving Layout
Presenter Presentation Notes Another enhancement being considered is an interpretive plaza which would allow visitors to better connect with the history of the site. This plaza would be located directly across from the memorial along the North Seawall.
The plaza includes engravings in the concrete of two ships significant to the Battle of Lake Erie. Wayfinding panels would be installed with information about the history of the site and ships.
Construction Phases
Presenter Presentation Notes Construction is scheduled to occur over two years with the North wall occurring in 2022 and the South wall occurring in 2023 between April and November (or between first and last ferry service to the island). Construction areas and staging areas are shown in the map (here).
Construction on the North seawall west and south seawall west improvements and extension on the south will be restricted to be completing before July 1st of each season to minimize impacts to the public beach and neighboring properties.
Construction- Restrictions to Means and Methods
• Waterside staging is restricted to 150ft from the Seawall
• Temporary structures may not be built on or supported by the existing seawall.
• Load adjacent to the Seawall is limited to 150psf
• The Contractor can not use Earthen Materials to construct temporary shoring system (earthen fill, rip rap, concrete etc.)
• Temporary lane closures of State Highway 357 would be necessary to allow construction and ensure visitor safety. Single lane closures would be limited to 6 hours. Full road closures would be limited to 2 hours. The contractor is responsible for all permits and coordination for traffic control.
• Temporary utility shutdowns would be necessary. Water shutdowns would be limited to 4 hours.
Electric/phone/cable shutdowns would be limited to 2 hours.
Presenter Presentation Notes
These are some of the main restrictions to the construction means and methods. Refer to the specifications and drawings for all of them.
So Waterside staging is restricted to 150ft from the Seawall Temporary structures may not be built on or supported by the existing seawall.
Load adjacent to the Seawall is limited to 150psf Earthen Materials cannot be used to construct temporary shoring system We have shown a suggested temporary support, but it is the responsibility of the contractor to design the shoring system. This needs to be approved by the us the Engineers.
Lane closures are limited to 6hrs for single lane and 2hrs for full road closures Utility shutdowns are limited to 2hrs for electrical, phone and cable and 4 hrs for water
SOLICITATION NO.140P2021R0133
SUMMARY OF SOLICITATION AND AWARD INFORMATION
Refer to the Solicitation for complete information.
• PRE PROPOSAL MEETING – July 27, 2021
• SITE VISIT – July 29, 2021, 9:00 a.m. Meet at the Park’s Maintenance Building
• PRE PROPOSAL QUESTIONS DUE – August 6, 2021
• OFFERS DUE – August 16, 2021 2:00 PM MT / 4:00 PM ET
• SUBMISSION – Electronic only to: Bai_Perney@nps.gov and Joy_Ewalt@nps.gov
• SECTION L – 52.216-1 – Type of Contract – Firm Fixed Price
• NAICS Code: 237990
• ESTIMATED PRICE RANGE: Over $10 Million(note the estimated price range per the allowable ranges in FAR 36.204.
• THIS IS A COMPETIVE PROCUREMENT THAT IS FULL AND OPEN
• PERIOD OF PERFORMANCE: Project will begin this year and must be completed by November 30, SOLICITATION INFORMATION & CRITERIA mailto:Bai_Perney@nps.gov mailto:Joy_Ewalt@nps.gov
PRE-PROPOSAL CONFERENCE QUESTIONS
• Administrative questions are the only questions permitted to be asked and answered during this conference. Please state your name and company before you ask your question. The question will be repeated, and responses provided. The CO requests all non-administrative questions be submitted in writing via email to both the CO, Bai Perney, and the CS, Joy Ewalt as follows:
Bai_Perney@nps.gov Joy_Ewalt@nps.gov Responses to questions that may be stated during the pre-solicitation site visit do not change the Solicitation document.
• Changes to the Solicitation document shall be made as an amendment to the solicitation document. Answers to questions received will be issued as an amendment to the solicitation.
• Offerors are required to fill out and sign the acknowledgment of amendments received (SF1442 Section 19) and include this when submitting their offer on the Form 1442.
PRE-PROPOSAL CONFERENCE QUESTIONS
QUESTIONS AFTER PRE-PROPOSAL CONFERENCE
• Direct all questions the CO requests that they be submitted in writing via email to both the
CO, Bai Perney, and the CS, Joy Ewalt, as follows:
Bai_Perney@nps.gov Joy_Ewalt@nps.gov
Questions and answers will be issued by written amendment posted as an amendment to the solicitation. Offerors are required to fill out and sign the acknowledgment of amendments received (SF1442 Section 19) and include this when submitting our offer on the Form 1442.
• The DEADLINE FOR QUESTIONS IS: August 6, 2021 2:00PM MT/ 4:00PM ET. This Virtual pre-proposal meeting will be available. There will not be any recording of the Site Visit.
PRE-PROPOSAL CONFERENCE QUESTIONS
Thank You For Your Interest in This Project
E X P E R I E N C E Y O U R A M E R I C A
National Park Service U.S. Department of the Interior
| PEVI 200745 PreBid Conference Presentation-7-27-21.pdf |
| �Pre-Proposal Teleconference��Perry's Victory and International Peace Memorial ��Restore North and South Seawalls at Perry’s Victory to Safeguard Site ��Solicitation: 140P2021R0133�NPS PMIS #: PEVI 200745 ��THIS MEETING WILL BE RECORDED�July 27, 2021 |
| AGENDA |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| PRE-PROPOSAL CONFERENCE QUESTIONS |
| QUESTIONS AFTER PRE-PROPOSAL CONFERENCE |
| Thank You For Your Interest in This Project |
File details come from the government source that posted it. Updated .