This document is a set of construction drawings for roof and gutter deicing system details for the restoration of the Second Bank of the United States building at Independence National Historical Park. The drawings show plans and sections for installing electric heating cables in the roofing, gutters, and chimneys to prevent ice buildup. Notes call out that heating cable runs will start in the attic and extend vertically approximately 36 feet to the gutters. Power connection boxes will be mounted in the attic. Pole gutters will be covered with double runs of heating cable. Sensors will monitor gutters at chimney locations. The related federal contract opportunity is for the overall restoration project at the Second Bank building, including repairs to the roof, exterior marble, and wood windows. The solicitation was issued by the National Park Service for work at Independence National Historical Park.

View the file

Other files

File Type Posted
Sol_140P2021R0055_Amd_0005.pdf PDF
140P2021R0055-0005_Att03-RevDrg_391-168574_SubsheetA8_2_210712_0005.pdf PDF
140P2021R0055-0005_Att01-QuestionsAndResponses-Final_01-31_210713_0005.pdf PDF
140P2021R0055-0005_Att06-RevSpec-013592_CollectionMoveAndStorageProcedures_210713_0005.pdf PDF
140P2021R0055-0005_Att05-RevSpec-040140_52_StoneMasonryCleaning_210712_0005.pdf PDF
140P2021R0055-0005_Att04-1964RoofReplacementDrawingsAndSpecifications_640518_0005.pdf PDF
140P2021R0069-0005_Att08-WD_PA03_Philadelphia-Bldg_210709_0005.pdf PDF
140P2021R0055-0005_Att02-RevDrg_391-168574_SubsheetG0_0_210712_0005.pdf PDF
140P2021R0055-0004_Att04-2004SecondBankStoneSurvey-FinalReport_040601_0004.pdf PDF
140P2021R0055-0004_Att01-ClausesAndProvisions-Revised_210702_0004.pdf PDF
140P2021R0055-0004_Att05-FinalPDReport-RoofAndAssociatedFeatures_200414redacted_0004.pdf PDF
140P2021R0055-0004_Att06-WD_PA03_Philadelphia-Bldg_210702_0004.pdf PDF
Sol_140P2021R0055_Amd_0004.pdf PDF
140P2021R0055-0004_Att02-QuestionsAndResponses_01-24_210702_0004.pdf PDF
140P2021R0055-0004_Att03-RevSpec-013592_CollectionMoveAndStorageProcedures_210701_0004.pdf PDF
Sol_140P2021R0055_Amd_0003.pdf PDF
140P2021R0055-0002_Att01-PreProposalMtg-Presentation_210617_0002.pdf PDF
Sol_140P2021R0055_Amd_0002.pdf PDF
140P2021R0055-0002_Att02-PreProposalMtg-Sign-InSheet_210617_0002.pdf PDF
140P2021R0055-0001_Att-04b-PSPsample_210609_0001.pdf PDF
140P2021R0055-0001_Att-04a-PSPdocuments_210609_0001.zip ZIP file
140P2021R0055-0001_Att-03_FAR52_236-27rev_210609_0001.pdf PDF
140P2021R0055-0001_Att-01_Specifications-Final_210512_0001.pdf PDF
140P2021R0055-0001_Att-02_CombinedDrawings-Final_210527_0001.pdf PDF
Sol_140P2021R0055_Amd_0001.pdf PDF
B08_140P2021R0055_Att-04b-PSPsample_210608.pdf PDF
B08_140P2021R0055_Att-04a-PSPdocuments_210608.zip ZIP file
Sol_140P2021R0055.pdf PDF
B08_140P2021R0055_Att-01_Specifications_210409.pdf PDF
B08_140P2021R0055_Att-02_Combined_Drawings-Final_210409.pdf PDF
B08_140P2021R0055_Att-03__WD_PA03_Philadelphia-Bldg_210604.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A1.5

SIM

A1.5

A1.5

A1.5

A1.5

SIM

A1.5

SIM

ICE MELT

HEATING CABLES

POLE GUTTER,

SEE 4/A6.1

ROOF TYPE 2

SLOP

ED

PREFAB

COPPER

CABLE COVER

EXIST

CHIMNEY

PREFAB

COPPER

CABLE

COVER

ROOF TYPE 2

ICE MELT

HEATING

CABLE

CHIMNEY CRICKET

RIDGE BEYOND

A .5

A

.5 POLE GUTTER

DOUBLE CABLE

RUN WITH PREFAB

COPPER CABLE

COVER

ROOF TYPE 2

SINGLE CABLE

RUN WITH PREFAB

COPPER CABLE

COVER

ROOF TYPE 1

ROOF EDGE

A .5

GIT-1 GUTTER

DEICING SENSOR,

SEE ELECTRICAL

ATTIC

35.75'

ICE MELT

HEATING CABLE,

SEE ELECTRICAL

RUBBER COLLAR

W/ COPPER

FLASHING BASE

ROOF TYPE 1

SEAM TYPE 6

SEAM TYPE 4

ROOF TYPE 1

SEAM TYPE 5

COPPER

GOOSENECK

CABLE FLASHING

GIT-1 GUTTER

DEICING SENSOR,

SEE ELECTRICAL

CONDUCTOR

CABLE, SEE

ELECTRICAL

6 6

SCALE OF INCHES

3 0

2 0 2 4

SCALE OF FEET

8 24

SCALE OF FEET

0 8 16

A/E FIRM - P15PC00037

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

PRIME/ARCH:

GWWO, INC.

BALTIMORE, MD

CONSERVATION:

BCA, INC.

PHILADELPHIA, PA

ELECTRICAL:

HENRY ADAMS

BALTIMORE, MD

STRUCTURAL:

SGH INC.

WASHINGTON, D.C.

HAZMAT:

ARC

BALTIMORE, MD

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SCALE B

SCALE C

:2 :3

P M

B

IM

N P S D S C

IN

D E S e c o n d

B a n k o f th e

U n it e d

S ta te s

P re s e rv a ti o n a n d

R e h a b il it a ti o n n d B a n k A rc h it e c tu ra l.

rv t

ROOF AND GUTTER

DEICING SYSTEM DETAILS

INDEPENDENCE NATIONAL HISTORICAL PARK

168574

224697,176914, 177564

20 58

A1.5

BCW, LKM

NY

JRG

04/09/2021

DETAILS

SCALE AA1.5

1 ROOF AND GUTTER DEICING SYSTEM PLAN

SCALE CA1.5

DOUBLE CABLE RUN

AT POLE GUTTER - TYP. SECTION DETAIL

SCALE CA1.5

SINGLE CABLE RUN AT CHIMNEY

- TYP. SECTION DETAIL

SCALE B

A6.4

CHIMNEY - ENLARGED PLAN

SCALE CA1.5

ICE MELT CABLE -

TYP. SECTION DETAIL

SCALE CA1.5

6 DEICING SENSOR - TYP. SECTION DETAIL

NOTES ON THIS SHEET REFER TO

PMIS 224697 BID OPTION 3

Wesley_M Callout Do these notes mean that all runs of heat trace cable are to start in the attic and have a vertical distance of approx. 36ft from their start in the attic up to the gutters? If so, are all power connection boxes to be mounted in the attic to start the cable runs up to the roof then out into the gutters? Please provide electrical drawings so I can see more details about what this note means and also to see what power is available for the heat trace system.

Wesley_M Line

Wesley_M Oval

Wesley_M Oval

Wesley_M Oval

Wesley_M Callout Are the pole gutters to be covered with heat trace or will these be downspouts where the cable will need to run down into as well? Is the note about "double cable run at pole gutter" possibly in reference to the cable running down inside the pole gutter then back up again to be considered a "double run"? If so, please advise the vertical height of the pole gutters and please provide drawing 4/A6.1 as listed here.

Wesley_M Oval

Wesley_M Oval

Wesley_M Oval

Wesley_M Callout Are all GIT-1 gutter sensors to be placed only at the chimneys? Can you advise how wide the gutters will be?