This document is a pre-proposal presentation for a solicitation seeking hurricane repair services at Biscayne National Park. The National Park Service is seeking proposals for repairs to boardwalks, trails, docks, shoreline erosion, and roads across multiple park sites damaged during Hurricane Irma. Offerors must submit separate technical and price volumes by November 20, 2020. The contract will be a one-year firm fixed price award. Evaluation criteria include experience with similar coastal construction projects, technical approach, key personnel qualifications, schedule, and past performance. The successful offeror must demonstrate experience navigating logistics in remote marine environments while protecting natural and cultural resources.

View the file

Other files for this federal contract opportunity

Other files attached to BISC Various, newest first.
File Type Posted
RFIs and Responses-11.25.20_0007.pdf PDF
Amendment 5_0007.pdf PDF
Sol_140P2020R0147_Amd_0007.pdf PDF
Sol_140P2020R0147_Amd_0006.pdf PDF
Amendment 4_0006.pdf PDF
Sol_140P2020R0147_Amd_0005.pdf PDF
Amendment 3_0005.pdf PDF
BISC Multiple Hurricane Repairs GeoTechnical Report_0005.pdf PDF
Amendment 2_0004.pdf PDF
Solicitation 140P2020R0147 Updated 10292020_0004.pdf PDF
SOLICITATION 140P2020R0147 RFIs and Responses_0004.pdf PDF
Contracting PreBid Powerpoint Updated 102920_0004.pdf PDF
Attendance List_0004.pdf PDF
Sol_140P2020R0147_Amd_0004.pdf PDF
Sol_140P2020R0147_Amd_0003.pdf PDF
Solicitation 140P2020R0147 Updated 10262020_0002.pdf PDF
Amendment 1_0002.pdf PDF
Sol_140P2020R0147_Amd_0002.pdf PDF
B08_Section J Attachment 6a Contracting Powerpoint.pptx PPTX presentation
B08_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_Section J Attachment 2_Drawings.pdf PDF
B08_Section J Attachment 4_Wage Determination.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
B08_Section J Attachment 6a Technical Powerpoint.pptx PPTX presentation
B08_Solit_PSP_Vol_II_HazMat.doc DOC document
B08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Solit_PSP_Vol_II_Equals.doc DOC document
B08_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Solit_PSP_Cover.rtf RTF text file
B08_Section J Attachment 3_Contract Price Schedule.xlsx XLSX spreadsheet
Sol_140P2020R0147.pdf PDF
B08_Section J Attachment 1_Specifications.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Proposal Teleconference & Virtual Site Visit

Hurricane Irma Repairs Biscayne National Park

Solicitation No:140P2020R0147

NPS PMIS #: BISC 244358, 244359, 244361,

244362, 244363, 251121 AND 251215

THIS MEETING WILL BE RECORDED

October 29, 2020 1PM EDT/11 AM MDT

E X P E R I E N C E Y O U R A M E R I C A

OPENING

• INTRODUCTIONS

• ATTENDEE’S LIST WILL BE INCLUDED IN AN AMENDMENT

• PURPOSE OF THE PRE-PROPOSAL CONFERENCE/VIRTUAL SITE VISIT

PRE-PROPOSAL CONFERENCE QUESTIONS

• QUESTIONS ONLY AFTER PRESENTATION IS COMPLETE – PLEASE DIRECT QUESTIONS TO

CONTRACTING OFFICER (CO) ALBERT O’MARA.

• PLEASE STATE YOUR NAME AND COMPANY BEFORE YOU ASK YOUR QUESTION. THE

QUESTION WILL BE REPEATED AND RESPONSE PROVIDED. QUESTIONS THE CO REQUESTS

IN WRITING NEED TO BE PROVIDED VIA EMAIL TO BOTH Albert_Omara@nps.gov and Michael_Smith@contractor.nps.gov.

• RESPONSES TO QUESTIONS DO NOT CHANGE THE SOLICITATION DOCUMENT.

• CHANGES TO THE SOLICITATION DOCUMENT SHALL BE MADE BY FORMAL AMENDMENT

ONLY.

• QUESTIONS AND ANSWERS WILL BE ISSUED BY A FORMAL AMENDMENT TO THE

SOLICITATION FOR INFORMATION ONLY

REQUEST FOR PROPOSAL NO.140P2020R0069

SOLICITATION AND AWARD INFORMATION

• PRE PROPOSAL MEETING – 1:00PM EDT, October 29, 2020

• PRE PROPOSAL QUESTION CUTOFF DAY– Monday November 13, 2020 5:00 PM MDT

• OFFERS/PROPOSAL DUE – November 20, 2020 5:00 PM MDT

• SECTION L – 52.216-01 – Type of Contract – Firm Fixed Price

• NAICS Code: 237990 - Small Business Size Standard $39.5M

• THIS IS A COMPETIVE , FULL AND OPEN PROCUREMENT

• 365 calendar day period of performance from (estimated) Notice to Proceed date of Jan 4,

• Notice of award (estimated) to be on or around December 18, 2020

BASIS FOR AWARD

1. The Government will conduct a source selection using the Best Value Continuum Tradeoff Process defined at FAR Part 15.1. The Contracting Officer (CO) will obligate and award a contract to the offeror who submits a proposal the Source Selection Authority (SSA) determines conforms to solicitation requirements; is fair and reasonable; and provides the best value to the government considering all evaluation factors combined as detailed below. For this acquisition, the CO is the SSA.

2. The Government may accept other than the lowest priced proposal when the perceived benefits of a higher priced proposal merit the price differential.

3. Additionally, pursuant to FAR 52.215-1(f), Contract Award, contained herein:

• The Government may reject any or all proposals if such action is in the Government’s interest.

• The Government may waive informalities and minor irregularities in proposals received.

• The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the CO later determines them to be necessary.

EVALUATION FACTORS

RELATIVE IMPORTANCE: FACTOR 1 – Project Experience is the most important factor followed in descending order of importance by FACTOR 2 – Project Technical & Management Approach, by FACTOR 3 – Key Personnel & Key Subcontractors, and by FACTOR 4 – Construction Schedule. The rating scheme for Technical Factors 1-4 is numerical. FACTOR 5, Past Performance is approximately equally important to Technical Factors 1 – 4 when combined, and its rating scheme is adjectival.

Overall: All evaluation factors other than price (technical and past performance), when combined are significantly more important than price.

Submission Requirements: VOLUME I, TECHNICAL PROPOSAL & VOLUME 2, BUSINESS

& PRICE PROPOSAL

1. Proposals shall be submitted via email. Proposals submitted via any means other than email shall not be accepted.

2. Proposals shall be sent to: CS_DSC_ Proposal_Submission@nps.gov

3.Title subject line for all proposal submissions shall contain the solicitation number, Park-PMIS, and number of total emails, per the following example:

Subj: 140P2020R0147, BISC Multiple Hurricane Repairs, email 1 of 3

4. Submit proposals in separate VOLUMES (I and II) in the FORMATS specified, containing CONTENTS required. Each volume shall be submitted in separate email attachments.

5. Size limits:

a. Individual email attachments shall be no larger than 38 MB.

b. Each email shall be no larger than 100 MB

6. Offerors shall verify receipt of proposals.

VOLUME I, TECHNICAL PROPOSAL – FORMAT, ORGANIZATION, CONTENTS

FORMAT: Submit (1) one electronic copy. No hard copies shall be submitted.

ORGANIZATION: Include a Table of Contents with folders and files for electronic formats named as follows:

FACTOR 1 – PROJECT EXPERIENCE

FACTOR 2 – PROJECT TECHNICAL & MANAGEMENT APPROACH

FACTOR 3 – KEY PERSONNEL AND KEY SUBCONTRACTORS

FACTOR 4 – CONSTRUCTION SCHEDULE

FACTOR 5 – PAST PERFORMANCE

OTHER SUBMITTALS (to be included in two sections - Technical Proposal and Business & Price Proposal)

• Proposed Equals

• Hazardous Materials Identification Listing

Factor 1: PROJECT EXPERIENCE Submit the attached "Project Experience" form addressing specific experience elements below for up to four (4) relevant projects completed in the last three (3) years. Submit separate forms for each project.

NOTE: Submit the same project information for Past Performance (FACTOR 5) as submitted under this factor. Relevant project experience includes the following:

Logistics, Coordination and Process - Construction in area of high public interest and public use that are similar in scope, magnitude, and complexity to this solicitation while maintaining safe public access, full use of adjacent buildings, complying and coordinating with on-site security, and minimizing visitor and public disruption.

Factor 1: PROJECT EXPERIENCE (cont’d) Address experience and ability to:

• Mobilize and perform work in remote marine locations where all materials need to be delivered and removed via barge.

• Mobilize and perform work in a remote marine environment where construction /installation needs to be performed from a barge and/or with divers.

• Perform electrical, mechanical and fuel station installation/construction in marine environments.

• Install helical piles in a marine environment.

• Perform concrete work in a submerged marine environment.

• Perform masonry working in marine environment.

Factor 1: PROJECT EXPERIENCE (continued) Natural, Cultural, & Historical Resources - Construction and permitting complying with the National Environmental Policy Act (NEPA); and protecting natural (Threatened and Endangered flora and fauna species and Marine floor bed) and cultural resources (historic stone/masonry features) during construction of similar scope, magnitude, and complexity of this solicitation. Include experience and processes employed to meet all cultural resource and compliance requirements in the project.

Means/Methods – Coastal construction projects including shoreline erosion repair; trail repair; removal / repair / replacement of boardwalks; wayside replacement; repair / replace concrete docks/piles; road repair with processes employed that meet all cultural resource and compliance requirements on-time, within budget that are similar in scope, magnitude, and complexity to this solicitation.

Factor 1: PROJECT EXPERIENCE (continued) Project experience demonstrating (1) proven capability to successfully completed relevant projects of similar scope and magnitude to this solicitation; (2) strong technical knowledge and skill required in this solicitation; and (3) effective management, problem solving, communication, coordination, and organization present lower levels of risk and will be rated more favorably. Those not demonstrating these attributes present higher levels of risk and will be rated less favorably.

NOTE: The same projects evaluated for experience under this factor shall also be evaluated for Past Performance (FACTOR 5). Projects determined more relevant under this factor will be given more weight in the Past Performance evaluation.

Factor 2: PROJECT TECHNICAL & MANAGEMENT APPROACH Project technical and management approach is your means and methods to complete the technical aspects of the required work in this solicitation including organizational structure and business processes to manage, control, and oversee work. Submit a written narrative limited to five (5) pages describing your project technical approach and management for the specific elements below. Up to five (5) pictures can be included and will not count towards the page limitation. There is no preprinted form for this submittal.

Logistics, Coordination and Process - Submit a written detailed technical approach for performing this construction project. Address the successful execution of the project while protecting the parks resources, maintaining park operations, and minimizing impacts to Park visitors. Describe your proposed logistics of coordinating all transportation, hauling, and material deliveries within a constrained and secure work site and a heavily visited work area, and off-shore site locations. Consider any unique considerations relating to project scope, and creative and innovative ideas for executing the project in an expeditious manner.

Address processes to be employed to meet all cultural resource and compliance requirements of the project. Demonstrate a clear understanding of the project scope, sequencing, and offer realistic strategies and methods for addressing the overall project scope. Describe your ability and approach to manage and build multiple projects and project types simultaneously and concurrently.

(continued)

Management Approach – Submit a general management approach narrative for maintaining and managing project safety, quality control and coordination, cost management, and schedule management. Address how these general management procedures will be applied specifically to the scope, location, and schedule of this project. Describe how the subcontractors will be managed and coordinated, how safety requirements will be incorporated into all activities, and how the quality control requirements will be performed to ensure the Government receives a quality project. Describe management, coordination, and communication of efforts between the prime contractor, it’s subcontractors, and NPS. Include coordination with NPS relative to ongoing NPS operations and visitor activities.

Describe your approach to accomplish (specific trades – masonry, helical pile construction, submerged concrete construction, demo, sitework, boardwalk construction, electrical, mechanical, , etc.) to complete work within required schedule and budget for successful contract completion, and effective cost and quality control. Describe your approach to accomplish work at remote, off-shore locations.

Capacity - Submit a written narrative of your firm’s capabilities and assets that are available for this project.

Indicate existing capacity to perform this work concurrent with existing ongoing projects. Describe your firm’s resources and equipment that will be used for the work on this project.

Roles and Responsibilities - Submit an organizational chart identifying specific roles, responsibilities, and lines of authority of the proposed prime contractor, key personnel, and all subcontractors.

Technical approaches that comply with applicable contract requirements; are realistic, appropriate, and efficient; and demonstrate clear logic and scope understanding present lower levels of risk will be more favorably rated. Approaches not demonstrating these attributes present higher levels of risk and will be less favorably rated. Plans not demonstrating these attributes present higher levels of risk and will be less favorably rated.

Factor 3: KEY PERSONNEL AND KEY SUBCONTRACTORS Submit resumes limited to one (1) page each for Key Personnel as identified in this solicitation in Section H and listed below. All Key Personnel proposed are subject to substitution requirements contained in this solicitation. Key Personnel include: Project Manager, Job-site Superintendent, and Quality Control and Assurance Manager, Site Safety Manager.

Submit major subcontractor resumes limited to one (1) page for each subcontractor. There is no preprinted form for this submittal.

Key Trades - Describe experience and capability for the following Key Trades identified in Section H of this solicitation and listed below. Indicate whether or not you have previously worked with these firms on previous projects. All firms proposed as Key Trades are subject to substitution requirements contained in this solicitation. The offeror shall identify firms that will perform the following KEY TRADES under this contract. If Key Trades will be self-performed, note “self-performed” in the appropriate trade; otherwise provide the name(s) of assigned subcontractors.

Key Trades include contractor/subcontractors for the following: Shoreline Erosion Repair, Trail Repair, Boardwalk Repair/Replacement, Concrete Dock/Pile Repair/Replacement, Road Repair.

Factor 3: KEY PERSONNEL AND SUBCONTRACTORS (cont’d) Offerors are required to also provide resumes for the following:

• Professional Mangrove Trimmer (PMT), per 1996 Mangrove Trimming and Preservation Act. Refer to Florida Department of Environmental Protection.

• Masonry contractor

• Electrical and Mechanical contractor licensed in the State of Florida

• Structural Engineer, licensed in the State of Florida, preferably with helical and concrete experience.

• Civil Engineer, licensed in the State of Florida

Key Personnel and subcontractors experience demonstrating (1) proven capability in same or similar key personnel positions on successful relevant projects of similar scope and magnitude to this solicitation; (2) strong technical knowledge and skill required in this solicitation; and (3) effective problem solving, communication, coordination, and organization present lower levels of risk and will be rated more favorably. Those not demonstrating these attributes present higher levels of risk and will be rated less favorably.

Factor 4: CONSTRUCTION SCHEDULE Submit your proposed overall construction schedule showing completion within the required period of performance contained in this solicitation with accompanying schedule narrative. Submit your schedule in MS Project Gantt Chart format; assume a Notice to Proceed (NTP) date of 3/1/2020 and a completion date 365 calendar days after the NTP;

and include specific activities required for each of the different work sites and a clear critical path with major milestones and applicable predecessor activities. In your accompanying narrative, explain schedule logic, critical path activities, and key considerations and constraints. There is no pre-printed form for this submittal.

Include in the overall construction schedule separate sections that address separate geographic locations and the different types of work at each geographic location. Provide major and minor work tasks, milestones, critical path. Include start up (including but not limited to Division 1 submittals, mock-ups, shop drawings) and close-out tasks (Including but not limited to as-builts drawings, manuals and maintenance requirements). Include in the construction schedule and provide supporting narrative as to any concurrent/simultaneous construction activities at different geographic sites.

Factor 4: CONSTRUCTION SCHEDULE (continued) Construction schedules and narratives documenting (1) clear and efficient critical path and logical sequencing; (2) strong understanding of solicitation requirements; (3) procurement lead-time, subcontractor/trade coordination, on-site storage and staging, resource and time constraints; and (4) risk mitigation and successful completion within the required period of performance present lower levels of risk shall be rated more favorably. Schedules which do not demonstrate these attributes present higher levels or risk and will be less favorably rated.

Factor 5: PAST PERFORMANCE Submit Past Performance information for the same projects submitted under Project Experience (Factor 1) using the attached Past Performance Questionnaire. Information may be regarding the offeror's firm and/or its proposed major subcontractors performing key trades and/or other construction activities.

Subcontractor past performance will only be considered if it correlates to the work the subcontractor will be performing on this requirement. If Contract Performance Assessment Reporting System (CPARS.gov) evaluation reports exist for projects submitted under Project Experience (Factor 1) offerors are to include these in their past performance section of their Technical Proposal instead of obtaining Past Performance Questionnaire responses from customers.

Factor 5: PAST PERFORMANCE (continued) Submittal process for the Past Performance Questionnaire is as follows:

1) Complete Section A (Contractor Information) and B (Contract Information) only of the attached Past Performance Questionnaire and forward to your client reference. The reference shall be someone who was substantially involved with the project and can provide a complete, objective assessment of your performance. Direct them to complete and submit the survey to the email addresses and point of contacts noted in Section E. of the questionnaire by the due date and time for proposal receipt.

2) Submit copies of the questionnaire that you forwarded to your references with their questionnaire Section C (Reference) point of contact information in Technical Proposal Volume I.

3) Submit a narrative disclosing any instances of past performance that may be considered less than fully satisfactory. Describe pertinent facts, circumstances and any remedial action taken or to be taken to correct the deficiency. Failure to disclose such instances could result in an unfavorable assessment of the offeror's past performance record. The offeror shall be responsible for any follow-up communication required to ensure that all the forms are completed by the reference and are emailed to the NPS point of contacts no later than the date and time proposals are due.

Factor 5: PAST PERFORMANCE (continued) The TEP will evaluate past performance of offerors on projects provided in the Project Experience section (FACTOR 1) and on contracts with the Federal Government, other public agencies, or private organizations. Past performance demonstrating higher levels of success and quality on more relevant projects similar in scope and magnitude to this solicitation present lower levels of risk and will be more favorably rated. Projects that are more relevant to the requirements of this solicitation will be given more weight in the overall past performance rating. If an offeror has no past performance on similar work relevant to this solicitation, they will be evaluated neither favorably nor unfavorably. All submitted references may not be contacted. Sources other than submitted references may be contacted.

During proposal evaluations, exchanges between the Government and offerors may occur to clarify the relevance of past performance information and/or address adverse past performance information which an offeror has not yet had an opportunity to respond to.

Other Submittals:

Include the following submittals in both Volume I -Technical Proposal and Volume 2 - Business and Price Proposal.

Proposed Equals: Complete and submit the attached “Proposed Equals” form. Provide a list of any proposed equals anticipated to be used in performing this construction contract or state "none."

Hazardous Materials: Complete and submit the attached "Hazardous Materials Identification Listing" form.

Pursuant to FAR 52.223-3, Hazardous Material Identification and Material Safety Identify facility(ies) where concrete, metal and lumber will be recycled.

VOLUME II, BUSINESS AND PRICE PROPOSAL – FORMAT, ORGANIZATION, CONTENTS

1. FORMAT: Submit (1) one electronic copy. No hard copies shall be submitted.

2. ORGANIZATION: Include a Table of Contents with files for electronic formats named as follows:

SF1442

AMENDMENTS

SECTION B PRICE SCHEDULE

SCHEDULE OF VALUES

SF 24 BID BOND

SECTION K REPRESENTATIONS AND CERTIFICATIONS

GENERAL REFERENCES

SUBCONTRACTING PLAN WORKSHEET

(cont’d)

SF1442: Standard Form 1442, Solicitation, Offer, and Award, (Construction, Alteration, or Repair):

Complete blocks 14 through 20C only. An official having the authority to contractually bind the offeror’s company must sign the SF 1442 in accordance with the procedures prescribed in FAR 4.102. The SF- 1442 will be reviewed for completeness.

AMENDMENTS: Acknowledge all solicitation amendments using one of the methods set forth in Block 11 of Standard Form 30. Amendment acknowledgements will be reviewed for timely and proper acknowledgement.

SECTION B CONTRACT PRICE SCHEDULE: Enter the proposed dollar amount for each line item in the Price Schedule, including any optional items, if applicable. Proposed pricing will be evaluated for fair and reasonableness. Reasonableness will be determined considering comparisons to competitive pricing and to the independent Government Cost Estimate (IGCE). Proposed pricing that differs significantly from the competition or IGCE will be reviewed to assess potential performance risk and the offeror’s understanding of contract requirements. If multiple contract line items are included in the price schedule, prices will be evaluated to determine whether any line items are unbalanced. Offerors are cautioned to distribute costs appropriately.

SCHEDULE OF VALUES: Provide a detailed Schedule of Values that supports the Contract Price Schedule by line items and total price. Proposed Schedule of Values will be evaluated for completeness and that they support the Contract Price Schedule by line item and total price.

SF 24 BID BOND: Submit Standard Form 24, Bid Bond duly executed between the offeror and the bonding company.

Refer to clause 52.228-1.

SECTION K REPRESENTATIONS AND CERTIFICATIONS: Submit a completed copy of provision 52.204-8 shown in section “K” of this solicitation. Complete all required representations and certifications if they are not available at www.SAM.gov. Your firm must maintain current, active registration at www.SAM.gov to be eligible for award and you are encouraged to complete SAM registration before submitting your offer.

GENERAL REFERENCES: Complete and submit the attached “General References,” form. Information will be used in determining Responsibility pursuant to FAR 9.103.

SUBCONTRACTING PLAN WORKSHEET: Required for Large Business Only

CONTRACT PRICE SCHEDULE

Solicitation Number: 140P2020R0069 PARK - PMIS (Project Management Information System): BISC 244358, 244359, 244361, 244362, 244363, 251121, and 251215 Developed Area: Biscayne National Park Various Locations Project Title: Biscayne Multiple Hurricane Repairs Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. Refer to solicitation section “H” for additional information regarding contract options

Contract Line Item Number

(CLIN)

Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price

1 Contract General Conditions 1 LS $0.00

2 PMIS 244359 Repairs to Blackpoint Jetty Trail 1 LS $0.00

3 PMIS 244361 Repairs to Boardwalk and Trails at Convoy Point Visitor’s Center 1 LS $0.00

4 PMIS 244362 Demolish Boardwalk on Elliot Key 1 LS $0.00

5 PMIS 244363 Repairs to Docks at Convoy Point Waterfront 1 LS $0.00

6 PMIS 251215 Repairs to Park Entrance Road 1 LS $0.00

TOTAL BASE PRICE (Contract Line Item Number 1 through 6) ------------------------------------------------------------------------- -------- $0.00

7 OPTION A, 244358 Repair Shoreline Erosion on Boca Chita Key 1 LS $0.00

8 OPTION B, 251121 Replace Adams Key Dock 1 LS $0.00

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 7 through 8) ------------------------------------------------------ ----- $0.00

TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 8) -------------------------

- $0.00

All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

CONTRACT PRICE SCHEDULE – Definition of Contract Line Items

Contract Line Item No. 1 Contract General Conditions - This item consists of all General Conditions except as listed in other Contract Line Items below.

Contract Line Item No. 2 PMIS 244359 – Repairs to Blackpoint Jetty Trail - This item consists of all construction items related to Blackpoint Jetty Trail.

Contract Line Item No. 3 PMIS 244361 – Repairs to Boardwalk and Trails at Convoy Point Visitor’s Center - This item consists of all construction items related to the Boardwalk and Trails at Convoy Point Visitor’s Center.

Contract Line Item No. 4 PMIS 244362 – Demolish Boardwalk on Elliot Key- This item consists of demolition of the Elliot Key Boardwalk.

Contract Line Item No. 5 PMIS 244363 – Repairs to Docks at Convoy Point Waterfront- This item consists of all repairs to Convoy Point Waterfront Docks.

Contract Line Item No. 6 PMIS 251215 – Repairs to Park Entrance Road - This item consists of all repairs to the road at the Convoy Point Park Entrance.

CONTRACT PRICE SCHEDULE – Definition of Contract Line Items (cont’d)

Contract Line Item No. 7 – OPTION A - PMIS 244358 Repair Shoreline Erosion on Boca Chita Key - This item consists of all shoreline erosion repairs at Boca Chita Key.

Contract Line Item No. 5 – OPTION B - PMIS 251121 Replace Adams Key Dock- This item consists of all construction costs for the replacement of the dock at Adams Key.

PRE-PROPOSAL CONFERENCE QUESTIONS

• PLEASE STATE YOUR NAME AND COMPANY BEFORE YOU ASK YOUR QUESTION. THE

QUESTION WILL BE REPEATED AND RESPONSES PROVIDED FOR ADMINISTRATIVE-TYPE

QUESTIONS. FOR ALL/MOST OTHER QUESTIONS THE CO REQUESTS THAT THEY BE

SUBMITTED IN WRITING VIA EMAIL TO BOTH Albert_Omara@nps.gov and Michael_Smith@contractor.nps.gov.

• RESPONSES TO QUESTIONS DO NOT CHANGE THE SOLICITATION DOCUMENT.

• CHANGES TO THE SOLICITATION DOCUMENT SHALL BE MADE BY FORMAL AMENDMENT

ONLY.

• QUESTIONS AND ANSWERS WILL BE ISSUED BY A FORMAL AMENDMENT TO THE

SOLICITATION FOR INFORMATION ONLY

QUESTIONS AFTER PRE-PROPOSAL CONFERENCE

• DIRECT ALL QUESTIONS TO ALBERT O’MARA & ALAN STORMONT, BY E-MAIL:

Albert_Omara@nps.gov and Michael_Smith@contractor.nps.gov Include on email subject line: “BISC - Multiple Hurricane Repairs”

• ALL QUESTIONS AND ANSWERS WILL BE PROVIDED TO ALL PROSPECTIVE

OFFERORS BY AMENDMENT TO THE SOLICITATION.

• REQUEST FOR PROPOSAL (SOLICITATION DOCUMENT) SHALL ONLY BE

CHANGED BY FORMAL AMENDMENT ISSUED BY THE CONTRACTING OFFICER AT

THE WEBSITE beta.sam.gov.

• Cut-off day for questions is Monday, November 13, 2020

Thank You For Your Interest in This Project

E X P E R I E N C E Y O U R A M E R I C A

National Park Service U.S. Department of the Interior

�Pre-Proposal Teleconference & Virtual Site Visit ���Hurricane Irma Repairs�Biscayne National Park���Solicitation No:140P2020R0147�NPS PMIS #: BISC 244358, 244359, 244361, 244362, 244363, 251121 AND 251215���THIS MEETING WILL BE RECORDED��October 29, 2020 1PM EDT/11 AM MDT
OPENING
PRE-PROPOSAL CONFERENCE QUESTIONS
Slide Number 4
BASIS FOR AWARD
EVALUATION FACTORS
Submission Requirements: VOLUME I, TECHNICAL PROPOSAL & VOLUME 2, BUSINESS & PRICE PROPOSAL
VOLUME I, TECHNICAL PROPOSAL – FORMAT, ORGANIZATION, CONTENTS
Factor 1: PROJECT EXPERIENCE
Factor 1: PROJECT EXPERIENCE (cont’d)
Factor 1: PROJECT EXPERIENCE (continued)
Factor 1: PROJECT EXPERIENCE (continued)
Factor 2: PROJECT TECHNICAL & MANAGEMENT APPROACH
Factor 2: PROJECT TECHNICAL & MANAGEMENT APPROACH (continued)
Factor 2: PROJECT TECHNICAL & MANAGEMENT APPROACH (continued)
Factor 3: KEY PERSONNEL AND KEY SUBCONTRACTORS
Factor 3: KEY PERSONNEL AND SUBCONTRACTORS (cont’d)
Factor 4: CONSTRUCTION SCHEDULE
Factor 4: CONSTRUCTION SCHEDULE (continued)
Factor 5: PAST PERFORMANCE
Factor 5: PAST PERFORMANCE (continued)
Factor 5: PAST PERFORMANCE (continued)
Other Submittals:
VOLUME II, BUSINESS AND PRICE PROPOSAL – FORMAT, ORGANIZATION, CONTENTS
VOLUME II, BUSINESS AND PRICE PROPOSAL – FORMAT, ORGANIZATION, CONTENTS �(cont’d)
VOLUME II, BUSINESS AND PRICE PROPOSAL – FORMAT, ORGANIZATION, CONTENTS �(continued)
CONTRACT PRICE SCHEDULE
CONTRACT PRICE SCHEDULE – Definition of Contract Line Items
CONTRACT PRICE SCHEDULE – Definition of Contract Line Items (cont’d)
PRE-PROPOSAL CONFERENCE QUESTIONS
QUESTIONS AFTER PRE-PROPOSAL CONFERENCE
Thank You For Your Interest in This Project