This document contains three scaffolding inspection reports for the Tortugas Harbor Lighthouse and related maintenance checklists. The reports were conducted by Enterprise Scaffolding, Inc. on October 2nd, 2018, December 1st, 2018, and November 23rd, 2019. They found the scaffolding and shoring to be in generally good condition with minor adjustments needed. Some screw jacks and wall brace clamps showed signs of corrosion but no structural issues. The November 2019 report noted a portion of the catwalk was unsafe.

The related federal contract opportunity is for scaffolding and shoring maintenance at Dry Tortugas National Park, Florida under Solicitation 140P2020R0004 from the Department of the Interior National Park Service. The incumbent contractor appears to be Enterprise Scaffolding, Inc. based on the inspection reports. No pricing, response dates or award dates are included in the provided documents.

View the file

Other files

File Type Posted
Sol_140P2020R0004_Amd_0004.pdf PDF
Sol_140P2020R0004_Amd_0003.pdf PDF
Amend 3 Attach 1 DRTO 241934 QA Part 2_0003.pdf PDF
Amend 2 Attach 4 Lighthouse Scaffolding-Shoring 2017.01.30.pdf PDF
Amend 2 Attach 6 Tortugas Harbor Lighthouse FINAL Report_170414.pdf PDF
Amend 2 Attach 8 SAFA Report 1811-Phase 2.pdf PDF
Amend 2 Attach 7 SAFA Report 1618-Metals Analysis-1.pdf PDF
Amend 2 Attach 5 Original 1875 Lighthouse Drawings.pdf PDF
Amend 2 Attach 1 DRTO_241934_Q and A part 1 02.25.2020_0002.pdf PDF
Amend 2 Attach 2 DRTO 2017 Emergency Action Plan_0002.pdf PDF
Sol_140P2020R0004_Amd_0002.pdf PDF
Amend 2 Attach 3 EVER DRTO 2019 Hurricane Plan_0002.pdf PDF
Attendance Sheet Feb 13 2020_0001.pdf PDF
Sol_140P2020R0004_Amd_0001.pdf PDF
B08_DRTO 241934_Solicitation - Attach 01 Final Specifications.pdf PDF
B08_DRTO 241934_Solicitation - Attach 2 Final Construction Plans.pdf PDF
B08_DRTO_241934_Solicitation - Attach 03 Wage Determination.pdf PDF
B08_DRTO_241934_Solicitation 140P2020R0004.pdf PDF
B08_DRTO_241934_Solicitation - Attach 07 Proposed Equals.doc DOC document
B08_DRTO_241934_Solicitation - Attach 08 General References.doc DOC document
B08_DRTO_241934_Solicitation - Attach 04 Project Experience.docx DOCX document
Sol_140P2020R0004.pdf PDF
B08_DRTO_241934_Solicitation - Attach 05 Performance Questionnaire.docx DOCX document
B08_DRTO_241934_Solicitation - Attach 10 Blank Bid Schedule.xlsx XLSX spreadsheet
B08_DRTO_241934_Solicitation - Attach 09 Small Business Sub-Contracting Plan.doc DOC document
B08_DRTO_241934_Solicitation - Attach 06 Bid Bond Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scaffold and Shoring Maintenance Procedure o o o o o o o

Scaffold and Shoring Maintenance Checklist

TORTUGAS HARBOR LIGHTHOUSE

SHORING INSPECTION REPORT

INSPECTION DATE: OCTOBER 2, 2018

The existing shoring was inspected by Enterprise Scaffolding, Inc. The inspection was performed by certified competent persons with extensive knowledge in scaffolding and shoring.

The scaffolding / shoring was found to be in good condition. The scaffolding /shoring is structurally sound and required minimal adjustments, mostly at the base where some settling had occurred. The scaffolding / shoring was green tagged and safe to use for it’s intended purpose.

The scaffolding is not to be used as a means of access to perform work on the lighthouse.

Climbing on the scaffolding should be prevented unless performing scheduled inspections. There are no work platforms, guard rail system or means of safe access as required by OSHA. The scaffolding was constructed to secure, stabilize, and provide supplemental support to the existing structure.

Please view inspection finding and photos on the following pages.

Enterprise Scaffolding, Inc.

60 Belamose Avenue, Rocky Hill, CT 06067

Tel (860) 785-8744

Fax (860) 888- 453-5233 www.EnterpriseScaffolding.com

Inspection Details

STABILITY:

The scaffolding /shoring structure is rigid and stable. While performing the inspection, the scaffolding did not sway or move while climbing around the structure. There was no evidence of the scaffolding moving at any time since construction.

SCAFFOLDING BASE / SCREW JACKS AND MUDSILLS:

The blocking/mudsills beneath the adjustable screw jack were in good condition. The wood blocking was not rotting or splitting and was in overall good condition. Several of the adjustable screw jacks needed adjustment where the vertical columns were installed on top of soil or sand, as some settling had occurred. The screw jacks were inspected and adjusted as necessary where the settling occurred. Screw jacks with longer screw arms showed no signs of surface rust or rot. The small arm screw jacks show signs of rot, but the rot has not compromised the structural integrity of the screw jack

VERTICAL STANDARDS, HORIZONTAL LEDGERS AND DIAGONAL BRACING

All wedge lock connections were inspected and hammered tight. The connections were in good condition and very few connections required additional tightening. The condition of the main support structure was good and did not show signs movement or weakening.

WALL BRACING / 2” DIAMETER TUBING AND CLAMPS

The wall bracing did not require additional tightening. The wall braces were tight to the structure. Surface rust was apparent on the hollow 2” diameter tubing. The rust is limited to the surface and did not appear to affect the strength of the tubes. The clamps connecting the tubes were in good condition. The rust on the clamp threads has not affected the ability to tighten or loosen the clamps.

NEEDLE BEAMS AND CANTILEVERED BEAMS

The steel beams bracing and installed thru the lighthouse were in good condition. The clamps securing the beams to the supporting structure showed no signs of movement and the clamps were tight. Full bearing was in place were the main support beams rested on the support beams.

LANTERN BRACING AND BLOCKING

The lantern bracing, steel I-beams and blocking were in good condition. The wood wedges were still in place and tight. All blocking was tight to the lantern and there were no signs of movement.

INTERIOR SHORING

Due to limited access and lighting, photos of the interior shoring are not shown as they were not clear enough to show the condition of the interior shoring. The interior shoring is in good condition and did not show signs of movement.

The upper steel beams had full steel on steel bearing and the intersecting beams steel beams are in good condition with only minor surface rust.

Enterprise Scaffolding, Inc.

60 Belamose Avenue, Rocky Hill, CT 06067

Tel (860) 785-8744

YES NO

If no, explain in

"note" section below

X

X No grade changes

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

Gerry Doncaster Inspection Date: 10/2/2018

Enterprise Scaffolding, Inc.

Scaffold and Shoring Maintenance Checklist

Company:

Inspection performed by :

Notes: See full report

Are the needle beams securely fastened to the scaffolding?

Are the needle beams in good condition? (Note: The needle beams were not painted when installed and some surface corrosion is to be expected. Needle beams can be considered in "good" condition with surface rust, tightly adhered corrosion, and/or section loss of less than five percent.)

Is the blocking between the scaffold and/or shoring beams tightly fitted?

Is the blocking in good condition?

Are the ledgers level or, if not level, as designed?

Are the ledgers correctly secured?

Are the joints in the ledgers correctly secured?

Is the bracing in good condition?

Are the ties in good condition and properly fixed or otherwise secured to the structure?

Is the scaffolding stable?

Are soleboards in serviceable condition?

Are soleboards secure?

Are baseplates in serviceable condition?

Are the baseplates secure?

Are the scaffolding standards bearing firmly on soleboards and/or baseplates?

Are the standards plumb or, if not plumb, as designed?

Is public protection sound

INSPECTION DATE: DECEMBER 1, 2018

The existing shoring was inspected by Enterprise Scaffolding, Inc. The inspection was performed by certified competent persons with extensive knowledge in scaffolding and shoring.

The scaffolding / shoring was found to be in good condition... The scaffolding / shoring was green tagged and safe to use for it’s intended purpose.

The scaffolding is not to be used as a means of access to perform work on the lighthouse.

Climbing on the scaffolding should be prevented unless performing scheduled inspections.

There are no work platforms, guard rail system or means of safe access as required by

OSHA. The scaffolding was constructed to secure, stabilize, and provide supplemental support to the existing structure.

Please view inspection finding and photos on the following pages.

Enterprise Scaffolding, Inc.

60 Belamose Avenue, Rocky Hill, CT 06067

Tel (860) 785-8744

The scaffolding /shoring structure is rigid and stable. While performing the inspection, the scaffolding did not sway or move while climbing around the structure. There was no evidence of scaffolding movement since the last inspection.

SCAFFOLDING BASE / SCREW JACKS AND MUDSILLS:

The blocking/mudsills beneath the adjustable screw jack were in good condition. The wood blocking was not rotting or splitting and was in overall good condition. Screw jacks with longer screw arms showed no signs of surface rust or rot. The small arm screw jacks show signs of rot, but the rot has not compromised the structural integrity of the screw jack

All wedge lock connections were inspected and were found to be in good condition. The condition of the main support structure was good and did not show signs movement or weakening.

WALL BRACING / 2” DIAMETER TUBING AND CLAMPS

The wall bracing did not require additional tightening. The wall braces were tight to the structure. Surface rust was apparent on the hollow 2” diameter tubing. The rust is limited to the surface and did not appear to affect the strength of the tubes. The clamps connecting the tubes were in good condition. The rust on the clamp threads has not affected the ability to tighten or loosen the clamps.

NEEDLE BEAMS AND CANTILEVERED BEAMS

The steel beams bracing and installed thru the lighthouse were in good condition. The clamps securing the beams to the supporting structure showed no signs of movement and the clamps were tight. Full bearing was in place were the main beams rested on the support beams.

The lantern bracing, steel I-beams and blocking were in good condition. The wood wedges were still in place and tight. All blocking was tight to the lantern and there were no signs of movement.

INTERIOR SHORING

Since the last inspection on October 2nd, 2018, several of the wood cribbing timbers supporting the underside of the lantern platform had been removed. Due to the location of the cribbing timbers that were removed and the area from which they were removed, I’m assuming they were removed to access the lantern platform, as the cribbing timbers blocked access to the lantern platform. The cribbing timbers were reinstalled to ensure full bearing on the underside of the lantern platform.

The upper steel beams had full steel on steel bearing and the intersecting beams steel beams are in good condition with only minor surface rust.

Tel (860) 785-8744

"note" section below

X

X No grade changes

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

Gerry Doncaster Inspection Date: 12/1/2018

Enterprise Scaffolding, Inc.

Scaffold and Shoring Maintenance Checklist

Company:

Inspection performed by :

Notes: See full report

Are the needle beams securely fastened to the scaffolding?

Are the needle beams in good condition? (Note: The needle beams were not painted when installed and some surface corrosion is to be expected. Needle beams can be considered in "good" condition with surface rust, tightly adhered corrosion, and/or section loss of less than five percent.)

Is the blocking between the scaffold and/or shoring beams tightly fitted?

Is the blocking in good condition?

Are the ledgers level or, if not level, as designed?

Are the ledgers correctly secured?

Are the joints in the ledgers correctly secured?

Is the bracing in good condition?

Are the ties in good condition and properly fixed or otherwise secured to the structure?

Is the scaffolding stable?

Are soleboards in serviceable condition?

Are soleboards secure?

Are baseplates in serviceable condition?

Are the baseplates secure?

Are the scaffolding standards bearing firmly on soleboards and/or baseplates?

INSPECTION DATE: NOVEMBER 23, 2019

The existing shoring was inspected by Enterprise Scaffolding, Inc. The inspection was performed by certified competent persons with extensive knowledge in scaffolding and shoring.

The scaffolding / shoring was found to be in good condition... The scaffolding / shoring was green tagged and safe to use for its current purpose.

At this time, the scaffolding shouldn’t be used as a means of access to perform work on the lighthouse. The scaffolding requires work platforms, a guard rail system and means of safe access per OSHA requirements. Climbing on the scaffolding should be prevented unless performing scheduled inspections.

Please view inspection finding and photos on the following pages.

Enterprise Scaffolding, Inc.

60 Belamose Avenue, Rocky Hill, CT 06067

Tel (860) 785-8744

The scaffolding /shoring structure is rigid and stable. While performing the inspection, the scaffolding did not sway or move while climbing around the structure. There was no evidence of the movement since the September ‘19 inspection.

SCAFFOLDING BASE / SCREW JACKS AND MUDSILLS:

The blocking/mudsills beneath the adjustable screw jack were in good condition. The wood blocking was not rotting or splitting and was in overall good condition. Most of the screw jacks show signs of significant rust and corrosion. The corrosion has not compromised the structural integrity of the screw jack.

Although there is surface rust, the wedge lock connections were inspected and were found to be in good condition. The condition of the main support structure was good and did not show signs movement or weakening.

Wall bracing / 2” diameter tubing and clamps

The wall bracing did not require additional tightening. The wall braces were tight to the structure. Surface rust was apparent on the hollow 2” diameter tubing. The rust is limited to the surface and did not appear to affect the strength of the tubes. The clamps connecting the tubes are in poor condition. The rust on the clamp threads is significant. The clamps may need to be removed with an impact wrench and will require soaking in lubricant prior to dismantle (recommend spraying with lubricant the day before removal.

NEEDLE BEAMS AND CANTILEVERED bEAMS

The steel beams bracing and installed thru the lighthouse were in good condition. The clamps securing the beams to the supporting structure showed no signs of movement and the clamps were tight. Full steel on steel bearing was apparent at all overlapping beams.

The lantern bracing, steel I-beams and blocking were in good condition. Wood wedges were installed were necessary. All blocking was tight to the lantern and there were no signs of movement. A portion of the catwalk is unsupported and unsafe to walk on. I recommend closing off access to the catwalk and adding signage and/or red danger tape.

Interior Shoring

The wood cribbing timbers and shims supporting the underside of the lantern platform did not require additional shimming and were in good condition. The cribbing timbers had full bearing on the underside of the lantern platform.

Tel (860) 785-8744

"note" section below

X

X No grade changes

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

Gerry Doncaster Inspection Date: 11/23/2019

Enterprise Scaffolding, Inc.

Scaffold and Shoring Maintenance Checklist

Company:

Inspection performed by :

Notes: See full report

Are the needle beams securely fastened to the scaffolding?

Are the needle beams in good condition? (Note: The needle beams were not painted when installed and some surface corrosion is to be expected. Needle beams can be considered in "good" condition with surface rust, tightly adhered corrosion, and/or section loss of less than five percent.)

Is the blocking between the scaffold and/or shoring beams tightly fitted?

Is the blocking in good condition?

Are the ledgers level or, if not level, as designed?

Are the ledgers correctly secured?

Are the joints in the ledgers correctly secured?

Is the bracing in good condition?

Are the ties in good condition and properly fixed or otherwise secured to the structure?

Is the scaffolding stable?

Are soleboards in serviceable condition?

Are soleboards secure?

Are baseplates in serviceable condition?

Are the baseplates secure?

Are the scaffolding standards bearing firmly on soleboards and/or baseplates?