Amend 2 Attach 3 EVER DRTO 2019 Hurricane Plan_0002.pdf
PDF 2 MB Posted
- Attached to
- DRTO 241934 - Harbor LighthouseDry Tortugas Nati
- Solicitation number
- 140P2020R0004
About this file
This document provides details for a federal solicitation seeking maintenance and repair services for a lighthouse located within Dry Tortugas National Park. The solicitation was issued by the National Park Service seeking a contractor to provide services including exterior painting, window repair, and structural repairs to the lighthouse. Responses are due by January 15th, 2020 and it is anticipated the contract will be awarded by February 2020. The contractor will be required to follow all applicable federal acquisition regulations and the period of performance is one year with options to extend for up to four additional years. The solicitation is designated as a small business set-aside and incumbent contractors are not specified.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Everglades and Dry Tortugas National Parks Hurricane Plan – 2019 version
Table of Contents
Introduction_______________________________________________________ 3
Summary of Incident Objectives by Operational Period__________________ 4
• General Hurricane Season (June 1 – November 30) 5 100 Hours before Landfall 5
• Preliminary Hurricane Prep (72-48 Hours Before Storm) 7
• Advance Hurricane Prep (48-24 Hours Before Storm) 8
• Final Hurricane Prep (24 Hours Before – Storm Duration) 9
• Post Hurricane Recovery (Aftermath of Storm) 10
• Hurricane Breakdown (Return to normal operations) 11
Organization Assignment List ICS-203________________________________ 13
Saffir-Simpson Hurricane Scale_______________________________________17
Command and General Staff Roles____________________________________18
EVER Operations Section Incident Checklists 24
I – Gulf Coast 25
II – NE Districts 29
III – Pine Island 34
IV – Aviation 39
V – Maintenance 41
VI – Flamingo 44
VII – Key Largo 49
VIII – Research 52 Museum, Archives, & Library 57
Dry Tortugas Operations Section 64 South Florida Collections Management Center Items 71 NPS M/V Fort Jefferson 72 DRTO & Poinciana Housing and EcoDiscovery Center Evacuation Plan 74 DRTO Medical Plans 79
Planning Section 81
Logistics Section Support Branch
• Facilities Unit Plan 86 o Hurricane Evacuation Info Sheet & Checklist 88
• Property Storage Plan 89
• Missile Base Storage Plan 90
• Property Storage Inventory 2019 93
• Ground Support Plan 94
• Supply Unit Plan 95
Service Branch
• Medical Unit Plans 96
• Communications Unit Plan 101
• Incident Command Post Phone List 103
Finance Section 104
Information Officer 106
Liaison Officer 108
Appendices:
A. Employee Responsibilities 111 B. Personnel Policy/Information 112 C. Delegation of Authority Letter 114 D. Transition Plan 116 E. Resource Planning Grid 117 F. Employee Emergency Contact Information 119 G. Personal Property Storage Request Memo 121 H. Checklist for Computer Users and IT Task Force 122 I. FDEP Guidance for Wastewater Treatment Operators 126 J. eVoice User’s Guide 129 K. Status Check In / Check Out Sheets 132 L. Surrounding County Hotel Listings and Federal Tax Exempt Form 134
INTRODUCTION
In accordance with Homeland Security Presidential Directive-5, Everglades (EVER) and Dry Tortugas (DRTO) National Parks have prepared a Hurricane Management Plan to serve as a guiding document during the threat of severe tropical weather. This plan is designed to conform to the standards of the National Incident Management System (NIMS) and its actions will be executed following the Incident Command System (ICS).
The Hurricane Plan for EVER and DRTO National Parks has been implemented 26 times since August of 1992, when Category 5 Hurricane Andrew left its mark on south Florida. The most recent event was Hurricane Irma in September of 2017.
Incident Management Team While the official hurricane season runs from June 1 until November 30, severe tropical weather is possible anytime of the year. For this reason, EVER and DRTO National Parks shall maintain a standing core Incident Management Team (IMT) comprised of the following:
• Incident Commander (IC) Mike Michener Deputy Incident Commander Penny Del Bene o Planning Section Chief Aerin Land o *EVER Operations Section Chief James Sullivan o *DRTO Operations Section Chief Glenn Simpson o Logistics Section Chief Damon Rondeau o Finance Section Chief Heather Walker o NPS Agency Representative Justin Unger
*EVER and DRTO have been divided into two separate Operations Sections due to the remoteness of DRTO, communications challenges and the need for independent decision making.
Given the short planning window before an actual storm, EVER and DRTO will be prepared to manage all weather related events through the duration of the storm, but will be prepared to turn over post storm operations to an outside IMT when necessary.
Forecasting Generally speaking EVER and DRTO National Parks shall make hurricane preparations based on the NHC/NWS Track Forecast Cone. It should be noted that NHC tropical cyclone forecast tracks can be in error. Historical data indicate that the entire 5-day path of the center of the tropical cyclone will remain within the cone about 60-70% of the time. For this reason, the IMT may use other data to inform their recommendations to the NPS Agency Representative about when to take hurricane related actions.
SUMMARY OF INCIDENT OBJECTIVES BY OPERATIONAL PERIOD
General Incident Objectives At the broadest level, incident objectives as outlined on ICS Form-202 should include:
• Provide for park personnel and public safety (includes concession & cooperating association during pre-storm operations)
• Protect irreplaceable collections housed in South Florida Museum Collection Centers
• Minimize impacts to park facilities and equipment
• Manage storm related costs effectively and in conformance with the incident business management handbook.
• Minimize financial impacts to neighboring communities by restoring park operations as quickly as possible consistent with public safety
• Provide training opportunities to strengthen our organizational capabilities
• Ensure continuity of operations
Hurricane Planning and Preparedness Objectives (December 1 – May 31) Under the direction and support of the Office of the Superintendent (and the PMT) the IMT will complete the following (dates listed are targets, not mandates):
• Provide training to new employees and applicable IMT members on roles and responsibilities related to ICS to ensure everyone is capable of functioning under ICS
• By January 1st submit an annual hurricane preparedness budget to the Superintendent
• Monthly meetings will commence no later than February and continue until the end of hurricane season. Meetings will take place at 1300 on the second Wednesday.
• By March 15th, recruit new IMT members to fill vacancies. Plans Section Chief will assemble a roster (ICS203).
• Before May 1st, review, revise, and edit the Hurricane Management Plan and associated documents, and submit to the Superintendent’s Office for approval. (The summary section will be submitted to the Regional Director. The entire plan will be submitted to the Regional All-Risk Manager)
• By April 1st the IC and Deputy IC will schedule a working team meeting where all C&GS members will review their roles and responsibilities.
• Before June 1st, conduct a 2-day all employee preparation day (with delegated authority); to include an orientation meeting for all new employees, clean-up, equipment check, and supply cache inventories
• By May 1st, identify individuals with special needs that may need additional assistance during or after storm events
• By May 15th, ensure all employees have entered or updated their emergency contact information (Google Form link provided by EVER/DRTO IMT).
General Hurricane Season (June 1 – November 30) During hurricane season, the Command & General Staff will meet monthly to:
• Systematically begin preparations for hurricane season
• Review the Hurricane Plan
• Identify and seek resolutions to identified problems; possibly through park channels
• Review Unit Logs submitted by Division/Group Supervisors
The Superintendent will attend the initial phase of each meeting to comment and assist as needed.
Division/Group Meetings:
Division/Group Supervisors will conduct monthly meetings (prior to the 15th) with IMT Supervisors to:
• Review their Division Assignment Lists (ICS-204/check lists).
• Revise and update assignments as needed.
• Prepare local checklists.
• Identify and resolve problems locally if possible.
• Identify anticipated staffing problems for the coming month.
• During the monthly meetings, Division/Group leaders are to inquire as to individual intents to remain in the area, how much time is needed to prepare personal residences, etc. should a hurricane watch/warning be issued.
• Submit ICS-214 Unit Log, to EVER Operations Section Chief that summarizes the meeting, changes needed to the plan, and unresolved problems or long-term projects that the Division/Group needs the IMTs assistance with. Meeting results need to be submitted to the EVER and DRTO Operations Section Chiefs before the next Command and General (C&G) Staff meeting.
100 Hours Before Landfall (BLF) Using the NHC/NWS; the Dispatch Center, Plans Section Chief and the IC will monitor tropical weather throughout the season. The zone of threat is determined by plotting the current compass direction of movement of the storm, plotting the main vector and allowing 45 degrees either side of the main vector of movement (total of 90 degrees). Depending on storm conditions and forecasted impacts, the park may begin shutdown procedures before 100 hours BLF (e.g. Monroe County Evacuation may dictate earlier shutdown of Key Largo) When a tropical storm or hurricane crosses the threshold of being within 100 hours of any portion of either park:
• The IC will immediately notify the Agency Representative
• The Plans Section Chief will notify the Command & General Staff and arrange for a meeting. The C&G will examine the NWS forecasted cone, and in conjunction with the Agency Representative, determine whether or not to begin preparations for a major storm. Note: The 90-degree cone is used to activate the C&G for the purpose of conducting meetings while monitoring the storms progress.
Advancement into Preliminary Hurricane Preparations Objectives (72-48 hours BLF) is based on the NWS cone. On a case-by-case basis the IMT, with Superintendent’s approval, may decide to initiate response based on the expanded forecast (90 degree) cone. For more information, see Weather Prediction Methodology (pg. 16).
• The IC, Command & General Staff, and the Superintendent will meet within 12 hours. If it appears that the storm will continue to threaten the park and the 72-hour threshold will be crossed, the Superintendent will delegate authority to fulfill the remainder of the plan (see Appendix B-Delegation of Authority).
• The Liaison Officer will notify the Southeast Regions (SER) Emergency Coordinator
(EICC) that the park’s IMT has been activated and initial preparations have begun.
• The Information Officer will activate the Employee Hotlines with a recorded message of all pertinent details.
• The IC will notify park employees of the implementation of the Hurricane Plan. If this occurs on a weekend, the EVER/DRTO Operations Section Chiefs will notify Division/Group Supervisors, who will begin contacting their personnel. Division/Group Supervisors will be instructed to notify their employees:
o The park will begin implementing the Hurricane Plan o When and where to meet o Remind employees to dress accordingly o Tell the employee the name of the person they will report to o Remind employees they are now part of the IMT for supervisory instructions
• Once employees have been notified, Division/Group Supervisors will inform the EVER/DRTO Operations Section Chiefs of all employees accounted for. The Ops Section Chief will forward this information to Plans Section / Resource Unit Leader to identify available resources.
• The EVER Operations Section Chief will direct expanded staffing of the Dispatch Center to accommodate the volume of communications that will be needed to begin implementing the plan. The Dispatch Center will notify neighboring parks and associated agencies as needed.
• Ensure that property and staff are accounted for during this operational period.
• Protect park resources and park visitors.
• Ensure all actions are conducted safely.
Less Than 72 hours Preparation Time (formerly: Less Than 100 Hours Before Landfall) Occasionally tropical systems develop rapidly, almost unexpectedly, and at much less than "100 hour" distances from the Park. These are usually not Cape Verde type hurricanes that are renowned for their intensity, but are generally Gulf storms of more moderate levels. There may also be a sudden shift in a Cape Verde type storm that unexpectedly places EVER or DRTO in the path of the storm.
In the event of these types of storms, the Superintendent and IMT will meet as soon as possible.
The Agency Representative must clearly define to the IMT an acceptable level of risk to the Park, since all preparations cannot be completed in the shorter time span. After a delegation of authority is signed, the IMT will immediately convene a Planning Meeting. An IAP will be produced and distributed that reflects the abbreviated time frame.
Operational Period Priorities Protection of Life
• Evacuation of the park
• Evacuation of park employees
Protection of Property
• Shutter buildings and secure facilities
• Remove and store vessels, vehicles, and other equipment
• Complete other property protection tasks if time allows
Division/Group Supervisors will establish priorities for their Division/Group. They will communicate these priorities to the EVER/DRTO Operations Section Chiefs with a timeframe in which they can be accomplished.
Operational Period Objectives
• Systematically begin preparations of EVER and DRTO NP for a major storm.
• Ensure that property and staff are accounted for during this operational period.
• Protect park resources and park visitors
Preliminary Hurricane Preparations Objectives (72-48 hours BLF) Operational Period Briefing:
The Operations Section Chiefs will brief Division/Group Supervisors in person, or via phone for remote areas, to assure they are aware of all operational concerns including:
• Times of the Preliminary Hurricane Preparation Period.
• Hurricane specific information prior to implementation of this phase of the plan.
Division Supervisors / Group Supervisors will be reminded to:
• Notify Ops Section Chiefs of changes in personnel assignments before morning Briefing.
• Submit personnel resource assignments and needs for the next operational period to
Operations Section Chiefs before the afternoon planning meeting.
• Complete and transmit Unit Logs to Planning Section at the end of each operational period.
• Commence the operational period by briefing their group supervisors and/or entire division/group staff.
• Complete/review a CTR for each employee in their Division or Group.
C&G staff will fulfill the established ICS responsibilities of their jobs throughout the Preliminary Hurricane Preparation Period.
Planning Meeting:
A Planning Meeting for the next operational period will be held midway through the current operational period. The following items will be included in the normal Plans meeting agenda:
• Work hours of the next operational period will be determined.
• Determine when to move into the Advanced Hurricane Preparation Period
• Modifications and revisions to the pre-plan will be addressed.
• Time/location/attendees for next briefing will be identified.
Once the Incident Action Plan (IAP) is consolidated for the next operational period, Plans will prepare the Release Plan that will identify resources to be released during/at end of the Advanced Hurricane Preparation Period.
Operational Period Objectives:
• Systematically begin preparations of EVER and DRTO NP for a major storm.
• Ensure that staff and property are accounted for during this operational period.
• Define work assignments for the next operational period.
Advanced Hurricane Preparations Objectives (48-24 hours BLF)
The Operations Section Chiefs will brief Division/Group Supervisors in person or via phone for remote areas to assure they are aware of all operational concerns including:
• Times of the Advanced Hurricane Preparation Period.
Division/Group Supervisors will be reminded to:
• Notify Operations Section Chiefs of any change to personnel assignments prior to morning Briefing.
• Submit personnel resource assignments and needs for the next operational period to Operations Section Chiefs before the afternoon planning meeting. Complete and transmit Unit Logs to Plans at the end of each operational period.
• Commence the operational period by briefing their group supervisors and/or entire staff.
• Complete/review CTRs for employees in their Division/Group.
• Notify the Operations Section Chiefs when employees can be released.
• Division/Group Supervisors will assure that all employees are informed about procedures to follow after the storm.
C&G staff will fulfill the established ICS responsibilities of their jobs throughout the Advanced Hurricane Preparation Period.
Planning Meeting:
A Planning Meeting for the next operational period will be held midway through the current operational period. The following items will be included in the normal Plans meeting agenda:
• Work hours of the next operational period will be determined.
• Determination when to move into the Final Hurricane Preparation Period.
• Modifications and revisions to the preplan will be addressed.
• If necessary, place outside resource orders on standby including an outside IMT
All efforts should be made to release non-essential employees at the end of this operational period, but not before, to allow them time to complete their personal preparations. If necessary, Planning Section will prepare a Release Plan, indicating which resources will be released from the incident.
During the final hours of this period, the IMT will begin to make preparations for when the storm actually hits. A small group of essential personnel (LE and Dispatch) will remain on site in the HQ shelter during the storm. The IC will designate a representative within this group who will act as the on-site IC to provide on-site direction, resolve issues and make decisions for the IMT, in the event that communications with the IC are not possible during the actual storm and the immediate aftermath.
The IMT will compile and order resources for mobilization immediately after the storm has passed based on the determination of needs to assist staff and protect park resources and assets. These resources may consist of communications kits, law enforcement/emergency service strike teams, maintenance strike teams, Critical Incident Stress Debriefing (CISD) strike teams, or Type I /2 IMT depending upon the given storm situation. The Resource Order Planning Grid (Appendix E) will be used to assist the IMT in deciding on what types of resources are required.
Operational Period Objectives:
• Ensure all actions are conducted safely.
• Ensure that staff and property are accounted for during this operational period.
• Systematically continue preparations of EVER NP for a major storm.
• Provide for smooth transition to off-site IC (e.g. establish a conference call schedule).
Final Hurricane Preparations Objectives (24 hours BLF through duration of storm)
The Operations Section Chiefs will brief Division/Group Supervisors in person, or via phone for remote areas, to assure they are aware of all operational concerns including:
• Times of the Final Hurricane Preparation Period.
Division/Group Supervisors will be reminded to:
• Notify Operations Section Chiefs of any change personnel assignments prior to morning Briefing.
• If applicable, submit list of personnel that will staff “Damage Assessment Task Force” to Operations Section Chiefs.
• Complete and transmit Unit Logs to Plans at the end of each operational period.
• Commence the operational period by briefing their group supervisors or entire staff.
• Complete/review CTRs for each employee in their Division/Group.
• Assure that all park residents in their Division/Group have safely evacuated to a Shelter well before the storm reaches landfall.
Final actions are completed as outlined in the IAP for the Final Hurricane Preparation Period under the guidance of the IC.
Planning Meeting:
A planning meeting for Post Hurricane Recovery Period will be held within the first hours of this operational period. The following items will be included in the normal Plans meeting agenda:
• Work hours of the next operational period will be determined.
• Determination when to move into the Hurricane Recovery Period
• Modifications and revisions to the preplan will be addressed.
• Establish staging areas to meet in the event that phone service is down following the storm.
• Time/phone number/attendees for next briefing via conference call will be identified.
In addition to reviewing/finalizing the IAP, the purpose of this meeting is to write the IAP for the first operational period immediately after the storm. This allows for the preparation of an IAP based on the best available information about the storm and expected results.
C&G Staff will be released during this operational period. During the Planning Meeting a conference call line will be established and C&G staff will be instructed to call in at a designated time to assess weather conditions, receive report of conditions from on-site IC and determine a date/time for the 1st post-storm operational period.
Operational Period Objectives:
• Ensure all actions are conducted safely.
• Provide for well-being of park employees.
• Protect park resources.
• Ensure that property and staff are accounted for during this operational period.
• Maintain contact with Southeast Regional Office (SERO).
• Pre-establish a time and method to reassemble the IMT for Post-Hurricane Recovery Period.
Storm Duration Communications Center During the storm, safety of staff is the primary objective, addressing damage is secondary.
Dispatch will continue to function throughout the storm up to a Category II Hurricane. Dispatch will maintain records of radio/telephone communications throughout the storm and provide copies of these records to the Plans Section immediately after the storm. At a Category III Hurricane or higher, Dispatch will cease all operations and no staff will remain in the Park.
Dispatch must be staffed immediately after a storm as soon as plausible with the expectation of receiving numerous telephone/radio calls from employees reporting their current status.
Command/General Staff:
C&G staff will call into conference line at a designated time to assess weather conditions and determine a date/time for the 1st post-storm operational period.
Post-Hurricane Recovery Objectives (immediate aftermath) Every storm situation is different and the plans for operations during any particular storm must be made during Final Hurricane Preparation Period and revised as needed following the storm.
Post Hurricane Planning Priorities:
• Identify immediate life and safety hazards in occupied areas of the park. Provide immediate assistance. Rectify hazards and/or quarantine these areas.
• Secure park access points.
• Locate and assess the well-being of all park employees and their immediate families.
• Provide initial assessment of damages to park facilities.
• Provide assessment of damages/needs to the SER All-Risk Incident Coordinator in accordance with the NPS SER Emergency Operations Plan.
• Begin process of requesting additional resources or a higher level (Type I or II) IMT.
• The IC and the Park Superintendent, in consultation with the Operations Section Chief(s), will determine necessary park/district closures and appropriate openings.
• Coordinate with Emergency Operations Centers (EOC) for Miami-Dade, Monroe, and Collier counties and Florida State EOC in Tallahassee to identify resources available for community assistance or to request additional resources to assist the park. Establish liaison with any state emergency response team (SERT) that may have been pre-positioned from State EOC to streamline local area needs in support of FEMA Emergency Support Functions (ESF).
Recommendations for additions to the ICS-203 Organizational Chart The following Divisions or Groups are suggested for most storms that require this recovery phase:
• Employee Assistance – contact employees to determine post-storm status and immediate needs, coordinate emergency assistance to employees and families, and provide other assistance as appropriate
• Facility Management Software System (FMSS) – conduct thorough damage assessments, enter needs into FMSS, determine project priorities, track projects, etc.
Operational Period Objectives:
• Ensure the safety of all park employees evacuated to commercial lodging.
• Locate all park employees.
• Contact SERO and advise of current situation and needs.
• Begin assessment of damages to park resources and facilities.
• Protect park resources and facilities.
Hurricane Breakdown Objectives This section of the Plan was developed to assist the park in returning to normal operations. Post-storm activities will continue to be managed under the delegated authority until normal park operations are restored.
Operational Period Briefing:
EVER Operations Section Chief will establish Staging Area at Pine Island.
The Operations Section Chiefs will brief Division and Group Supervisors in person or via phone for remote areas in advance of this operational period to assure they are aware of all operational concerns including:
• Times of the Hurricane Breakdown Period.
Division/Group Supervisors and Group Supervisors will be reminded to:
• Instruct employees to return to work and to report to their incident supervisor, not their normal job. All employees working in the Pine Island Division, Flamingo Division, Research Group, and Maintenance Group will be directed to report to a Staging Area established in Pine Island to receive assignments. Gulf Coast Division and Key Largo Division employees will report to their respective Division/Group Supervisors as established upon release from the prior operational period.
• Submit initial personnel resource assignments and needs to Ops Chiefs ASAP. All subsequent personnel resource assignments and needs will be submitted to Ops Chief prior to afternoon Planning Meetings. Complete and transmit Unit Logs to Plans at the end of each operational period.
• Commence the operational period by briefing group supervisors and/or entire staff.
• Complete/review CTRs for each employee in his or her Division.
• Division/Group Supervisors will assure that all employees are informed about returning to normal work operations.
• C&G staff will fulfill the established Incident Command Staff responsibilities of their jobs throughout the Hurricane Breakdown Period.
Planning Meeting:
A Planning Meeting for the period will be held once the decision is made by the IMT that the storm is no longer a threat to EVER or DRTO National Parks. The following items will be included in the normal Planning meeting agenda:
• Work hours of the next operational period (if any) will be determined.
• Determination when to transition back to normal park operations.
• Modifications and revisions to the preplan will be addressed.
Once the IAP is consolidated for the next operation period, Planning Section will prepare the Release Plan that will identify when resources can be released back to normal park operations.
At the end of the Hurricane Breakdown Period the IMT will provide a Transition Plan to the Superintendent. The IC will meet with the Superintendent to agree upon the Transition Plan and terminate the Delegation of Authority (see Appendix D).
Operational Period Objectives:
• Ensure all actions are conducted safely.
• Systematically restore park facilities and park operations to "normal" conditions.
• Ensure accountability for park property and staff.
The following organizational chart may change throughout the hurricane season and by incident as needed.
2019 ORGANIZATION ASSIGNMENT LIST
1. Incident Name 2019 Hurricane Season
2. Date 06/16/2019
3. Time 08:00
4. Operational Period
Hurricane Season 2019 Position Name
5. Incident Commander and Staff Incident Commander Mike Michener Deputy IC Penny Del Bene Information Officer Allyson Gantt Deputy Information Officer Helen Johnson PIO Assist – EVER Denise Diaz
PIO Assist – DRTO Curtis Hall Liaison Officer Wellington Felix Deputy Liaison Officer Anthony Smith Liaison Assist—DRTO Glenn Simpson Liaison Assist—Contractors Randie Burton VIP Coordinator Byrony Forbes Safety Officer Travis Kilpack NE Districts Field Safety TBD Pine Island Field Safety Jack Weer Gulf Coast Field Safety Flamingo Field Safety Christi Carmichael Key Largo Field Safety Sean Perchalski DRTO Field Safety Brett Koch Natural Resource Advisor Tylan Dean Cultural Resource Advisor Greg Luna-Golya / B. Ciolino Engineering Advisor Bill Shelley
6. Agency Representative NPS Agency Representative Justin Unger / Pedro Ramos
CISM / Family Liaison Kimberly Oppen/Y. Cano (t)
Administrative Assistant Ernest Jutte
7. Planning Section Chief Aerin Land Deputy PSC Chris Beers Situation Unit Caryl Alarcon / Troy Mullins Resource Unit Jeff Kemper Documentation Unit Vincent Carrodeguas Technical Specialist – CTSP Allan Morrison/Carlos Mateo
8. Logistics Section Chief D. Rondeau/D. Tongue Ordering Manager Angelica Alcontera Ground Support Unit Ryan Hess Supply Unit Nick Gomez Receiving/Distribution Tony Eusebio Medical Unit—EVER Steve Mullet Communications Unit Tim Moore Base/Housing Manager JoAnn Keady Technical Specialist – FMSS Nicole Fratto
9. Finance Section Chief Heather Walker Deputy FSC Julie Abreu
Time/Cost Unit Sally Hendricks
Procurement Unit Noelli Medina
10. Everglades Operations Section
EVER Operations Section Chief James Sullivan / Bruce Gantt Deputy Ops – Facilities Mike Machupa Dispatch Jeanie Greene / Jim Snyder
a. Gulf Coast Division Gulf Coast Division Supervisor Tom Iandimaro Gulf Coast Maintenance Group Victor Garcia Gulf Coast Visitor Services Group Nathan Moreno
b. NE Division NE Division Supervisor J. Collier / J. Gonzalez Tamiami/SV/Loop Rd. Group Phill Greenwalt East Ever Group Dylan Scott
c. Pine Island Division Pine Island Division Supervisor Al Mercado / Bill Gorney P.I. Visitor Services Division Kayla Sanders Entrance Station Group Barbara Johnson Fire TF Michael Gue / Pat Edwards Headquarters Group Rudy Beotegui HQ/RP/HL/LPK Shutter TF Ted Ferkins Office TF Fred Herling
d. Aviation Group Aviation Group Supervisor Clay Camblin
e. Maintenance Group Maintenance Division Supervisor Rich Ahern / Rob Neuman Task Force Coordinator TF 1—Utilities Randy Borden TF 2—Special Equipment John Hogan TF 3—Shutters Curtis Powell
f. Key Largo Division Key Largo Division Supervisor Brandon Moore/Zach Parkes Cooperator Liaison Christopher Kavanagh
g. Research Group Research Group Supervisor Hillary Cooley / Amy Renshaw
Trailering Task Force PJ Walker DBC Outside Task Force Jonathan Taylor Museum/Archives/Library Bonnie Ciolino / J. Williams Krome Group Jackie Bell-Willock Researcher Liaison Tonya Howington
h. Flamingo Division Flamingo Division Supervisor Tony Terry / Flamingo Visitor Services Group Steve Olijnyk
Flamingo Maintenance Group John Campos/Tracy Zastrow
11. Dry Tortugas Operations Section DRTO Operations Section Chief G. Simpson/T. Gottshall Dry Tortugas Group John Spade DRTO Medical Unit Leader Brett Koch Key West Group Fort Jefferson Group Tim Arter/Brian Lariviere MVFJ Medical Unit Leader Mikey Kent
Prepared by Aerin Land, Planning Section Chief
SUMMARY OF CHANGES
1. Pages 3-18
a) Minor edits to correct typos and add clarity.
b) ICS-203 updated to reflect current staffing.
c) Summary of Changes section will contain all updates to the plan (summary and operations)
d) Planning P updated with most current version.
2. Division/Group Checklists have been updated to address current needs and conditions post-Irma.
3. Logistics Section: Table of Satellite Phone assignments added
4. Finance Section: Minor edits to clarify that government housing evacuees must stay in a hotel room that is within per diem in order to be reimbursed for lodging expenses.
5.
Plan Overview The parks’ highest priorities are to provide for the safety of all individuals involved in park operations and park visitors, followed by the securing of over 200 buildings and government-owned equipment spread over 1.5 million acres (approx. 2400 square miles). The plan provides the parks’ IMT with a blueprint for progressive preparations to be done in a manner that weighs the risks and needs of people and property during each operational period.
This plan is designed using the ICS. Once a threat is identified and a need for action determined, the Park Superintendent delegates specific authority to the IC and IMT to prepare for, and manage, an incident consistent with overall agency goals. Preparation is the responsibility of all park staff and cooperators who must maintain readiness throughout the year.
This document serves as a guideline for park operations during hurricane season and as a format for the development of IAPs for individual hurricanes. This plan specifically addresses the following six distinct periods:
1. General Hurricane Season (June 1 – November 30)
2. Preliminary Hurricane Preparation (72-48 Hours before hurricane landfall)
3. Advanced Hurricane Preparation (48-24 hours before hurricane landfall)
4. Final Hurricane Preparation (24 hours - duration of storm)
5. Post-Hurricane Recovery (immediate aftermath)
6. Hurricane Breakdown (breakdown when a storm does not hit the parks) *For detailed information, see Operational Period Descriptions (pg. 4)
In ICS terms, this plan is based on geographic divisions and functional grouping. Many Groups and Divisions function within their normal geographic zones of operation (e.g. Key Largo). Within those areas various work groups are divided according to the normal type of work performed (e.g. Maintenance) or specific tasks that need to be accomplished (e.g. Equipment Storage). Some Division/Groups will have shared responsibilities requiring collaborative efforts.
This plan was developed to provide general information and direction for all phases of hurricane preparation and recovery after a storm. Checklists of tasks to be completed for each operational period are included for each Division/Group as well as some of the command staff. Division or Group Supervisors are encouraged to maintain these checklists and review/revise them annually and throughout the season.
This plan provides information for Section Chiefs, Command Staff, and Division/Group Supervisors as well as all employees. Information such as the parks’ leave policy and housing plans are included to provide individuals with information that may answer questions before an event takes place. This may diminish fears and make the preparation for hurricanes less stressful.
Other information such as the Missile Base Plan, Ground Support Plan, Information Officer Plan, was developed to provide direction for individuals who may be called upon to assist with areas unfamiliar to them.
Weather Prediction Methodology
In the past, park preparations were based on a Hurricane Watch or Warnings issued by the National Weather Service (NWS). In 2001 the National Hurricane Center (NHC) began producing 120-hour predictions of storm track and intensity, giving a 5-day advance of their predictions. This is valuable information, but includes a great deal of predictive error.
This technology combined with the simple VECTOR SYSTEM is used to make the decision to implement the next preparation period of the EVER and DRTO National Parks Hurricane Plan.
Estimates of possible landfall of a hurricane or tropical storm that shows potential to develop to hurricane level is based on a formula using current position, direction, and speed of movement;
combined with interpretation of information from the NHC.
The location of a tropical system is monitored by dispatch, the Plans Section, and the IC. When it appears that a hurricane/tropical storm is within 100 hours of striking South Florida, using the
VECTOR SYSTEM described below, the IC then notifies the Superintendent.
The Superintendent and the IMT C&G Staff convene a Planning Meeting within 12 hours of the storm crossing the 100-hour threshold. The specific dates/hours of the next preparation period are determined at this meeting. The Superintendent provides any additional policy guidance at this time and signs a delegation of authority to the IC for the duration of the specific storm, or until changes are deemed necessary.
Vector System The Vector System can be used to estimate the approximate time the tropical storm force winds will hit EVER or DRTO based on the current position of the storm center, speed, and direction of travel (see image).
The time estimate is based on taking the current position of nearest tropical storm force winds divided by the forward speed and determining the expected hours to landfall.
The zone of threat is initially determined by plotting the current compass direction of movement of the storm, plotting the main vector and allowing 45 degrees either side of the main vector of movement (total of 90 degrees).
Throughout the hurricane incident, the Plans Section computes the landfall estimate with each NHC update of the storm position to determine if the parks remain at risk.
Plan Implementation The implementation of this plan requires activities and a series of meetings and actions at specific times each year in order to facilitate successful implementation of the plan should a hurricane threaten landfall. This includes staffing the IMT, pre-cleanup actions, orienting staff to protocols, and acquiring appropriate supplies.
Once a storm is on the horizon, the key decision points are then based on a timeframe from when the storm is expected to make landfall. These key time periods and their objectives are listed below. Detailed operations guidelines and checklists for each of these time periods can be found in the body of the plan.
SAFFIR-SIMPSON HURRICANE SCALE
All hurricanes are dangerous, but some more so than others. NOAA hurricane forecasters use a disaster-potential scale which assigns storms five categories. Category 1 is a minimum hurricane; category 5 is the worst case. For reference, the criteria for each category are shown below.
CATEGORY ONE (minimal) Winds 74-95 mph: No substantial damage to building structures. Damage primarily to unanchored mobile homes, shrubbery and trees. Also some coastal road flooding and minor pier damage.
CATEGORY TWO (moderate) Winds 96-110 mph: Considerable damage to vegetation, mobile homes, and piers. Small craft in unprotected anchorages break moorings.
CATEGORY THREE (extensive) Winds 111-130 mph: Structural damage to small homes and utility buildings. Major erosion of beach areas. Terrain lower than 10 feet above sea level may be flooded inland 8 miles or more.
CATEGORY FOUR (extreme) Winds 131-155 mph: Complete roof structure damage on small residences. Major erosion of beach areas. Terrain lower than 10 feet above sea level may be flooded requiring massive evacuation of many residential areas far inland.
CATEGORY FIVE (catastrophic) Winds greater than 155 mph: Complete roof failure on many residences and industrial buildings. Some complete building failures with structures being completely destroyed.
Command and General Staff - ICS Organizational Roles
Incident Commander (IC):
• Present clear authority and knowledge of agency policy
• Ensure incident safety
• Assess situations appropriately
• Establish immediate priorities
• Determine incident objectives and strategies
• Establish the level of organization needed and continually monitor operations and organizational effectiveness
• Attend planning meetings
• Approve and implement the IAP
• Coordinate C&G Staff activities
• Approve requests for additional resources and the release of resources
• Authorize the release of information to the media
• Order demobilization of the incident when appropriate
• Ensure incident after-action reviews are completed
Command Staff:
Public Information Officer
• Interface with public, media, and/or other agencies regarding incident related information requirements
• Provide accurate & complete information regarding the current situation—resources committed and matters of general interest for both internal and external consumption
Safety Officer
• Develop and recommend measures for assuring personnel safety, and monitor and/or anticipate hazardous and unsafe situations.
General Responsibilities
• Responsible for system and procedure necessary to ensure ongoing assessment of hazardous environments
• Coordinate multi-agency safety efforts
• Implement measures to promote emergency responder safety, as well as general safety of incident personnel
• Exercise emergency authority to stop and/or prevent unsafe acts during incident operations
• Ensure coordination of safety management functions and issues across jurisdictions & functional agencies, within the private-sector, and non-governmental organizations
Specific Responsibilities
• Identify safety and health hazards associated with the incident.
• Review JHA’s/Risk Analysis for pre and post hurricane operations
• Continuously monitor workers for exposure to safety or health hazardous conditions.
• Alter, suspend, or terminate activities that may pose immanent safety or health danger to personnel.
• Take appropriate actions to mitigate or eliminate unsafe condition, operations or hazards.
• Perform assessment of work practices during hurricane prep and post hurricane recovery.
• Document both safe and unsafe acts, corrective actions taken on the scene, accidents or injuries, and ways to improve safety on future incidents.
• In the event of staff injury or illness, incident supervisors will ensure that mishap reporting and OWCP protocols are followed.
• Participate in planning meetings.
• Review the Incident Action Plan (IAP) for safety implications.
• Exercise emergency authority to stop and prevent unsafe acts.
• Investigate accidents that have occurred within the incident area.
• Assign assistants, as needed.
• Review and approve the medical plan.
• Maintain Unit Log (ICS 214)
• Develop Incident Safety Message/Plan (ICS208) for each incident.
Resource Advisor
• Inform the IC and Planning Section Chief of planning requirements and the need to direct resources during post storm impacts.
• Assist with and/or direct the assessment of archeological resources, hydro stations and storm impacts to natural resources.
Agency Representative An Agency (or Park) Representative is an individual assigned to an incident from an assisting or cooperating agency who has been delegated authority to make decisions on matters affecting that agency's participation at the incident. This role is particularly important when the incident is being managed by an outside agency and/or IMT.
• Obtain briefing from the IC.
• Inform assisting or cooperating agency personnel on the incident that the Agency
Representative position for that agency has been filled.
• Attend briefings and planning meetings as required.
• Provide input on the use of agency resources unless resource Technical Specialists are assigned from the agency.
• Cooperate fully with the IC and the General Staff on agency involvement at the incident.
• Ensure the well-being of agency personnel assigned to the incident.
• Advise the LO of any special agency needs or requirements.
• Report to home agency dispatch or HQ on a pre-arranged schedule.
• Ensure that all agency personnel and equipment are properly accounted for and released prior to departure.
• Ensure that all required agency forms, reports and documents are completed prior to demobilization.
• Have a debriefing session with the LO or IC before demobilization.
Technical Specialist - Engineering Advisor Technical specialist that provides expertise and advice related to structural and mechanical engineering activities during pre and post storm operations.
Liaison Officer
• Provide a point of contact for representatives of other governmental agencies, non-governmental organizations, and/or private entities
• Present agency policy or operational issues to the attention of the IC
• Establish and maintain communication with cooperating and assisting agency managers
• DRTO Liaison Assistant will stage at the ICP and will act as the liaison between the IMT and Monroe County EOC. The DRTO assistant will also be able to assist the PIO with DRTO/Monroe County public information needs.
General Staff:
Planning Section Chief:
The planning section chief is responsible for providing planning services for the incident. Major responsibilities of the Planning Section Chief are to:
• Collect and manage all incident-relevant operational data
• Provide input to the IC and Operations Section Chiefs for use preparing the IAP
• Supervise preparation of the IAP
• Conduct and facilitate planning meetings
• Establish information requirements and reporting schedules for Planning Section Unit
• Determine the need for specialized resources to support the incident
• Establish specialized data collection systems as necessary (e.g., weather)
• Assemble information on alternative strategies and contingency plans
• Provide periodic predictions on incident potential
• Report any significant changes in incident status
• Compile and display incident status information
• Oversee preparation of the demobilization plan
• Incorporate Traffic, Medical, Communications Plans, and other supporting material into the IAP
Logistics Section Chief:
The Logistics Section Chief provides all incident support needs with the exception of logistical support of air operations. The Logistics Section Chief is responsible for:
• Facilities
• Transportation
• Communications
• Supplies
• Equipment maintenance and fueling
• Food services (for responders)
• Medical Services (for responders)
• All off-incident resources
• Management of all incident logistics
• Logistical input to the IC in preparing the IAP
• Providing briefings for Logistics Unit Leaders as needed
• Identifying anticipated and known incident service and support requirements
• Requesting additional resources, both internal and external, as needed
• Developing the Communication, Medical, and Traffic Plans, as required
• Oversight of demobilization of the logistics Section
Finance Section Chief:
The Finance/Administration Section Chief is responsible for managing all financial aspects of an incident. Major responsibilities of the Finance/Administration Section Chief are to:
• Manage all financial aspects of an incident
• Provide financial and cost analysis information as requested
• Ensure compensation and claims functions are being addressed relative to the incident
• Develop operating plan for the Finance/Administration Section, fill section supply and support needs
• Meet with assisting and cooperating agency representatives as needed
• Maintain daily contact with agency administration HQ on finance matters
• Ensure that all personnel and equipment time records are accurately completed and transmitted according to policy
• Brief agency administrative personnel on all incident-related financial issues needing attention or follow up
Operations Section Chief:
The Operations Section Chief is responsible for managing tactical operations and implementation of the IAP. All Division/Group Supervisors report to the Operations Section Chief. EVER Operations Divisions/Groups required for typical hurricane incidents are as follows:
1) Gulf Coast Division
a) Maintenance Group
b) Visitor Services Group
2) Northeast Division
a) Shark Valley/Tamiami/Loop Road Group
b) East EVER Group
3) Pine Island Divisoin
a) Visitor Services Group
i) Entrance Station Task Force
ii) Royal Palm, Hidden Lake, Long Pine Key Task Force
b) Fire Group
c) Headquarters Group
i) Shutter Task Force
ii) Office Task Force
4) Vehicle Task Force Aviation Group
5) Maintenance Group
Utilities Task Force Special Equipment Task Force Shutter Task Force Missile
6) Key Largo Division
7) Research Group
a) DBC Division
i) Trailering Task Force
ii) DBC Office Task Force
iii) DBC Outside Task Force
iv) Museum/Archives/Library Task Force
b) Krome Center Division
i) Response Team Coordinator
8) Flamingo Division
a) Visitor Services Group
b) Maintenance Group
Hurricane response at DRTO is managed within the Incident Command structure as a separate Operations Section with a separate DRTO Operations Section Chief. DRTO Operations Groups required for typical hurricane incidents are as follows:
1) Dry Tortugas Group
2) Key West Group
3) M/V Fort Jefferson Group
Additional divisions/groups will be added on an as-needed basis. IAP developed for each incident will provide the necessary guidance needed to complete required tasks. Major responsibilities of the Operations Section Chief include (but are not limited to):
• Ensures operation activities are conducted in a safe and efficient manner
• Ensures all operations section (ICM) positions are adequately staffed, request backfills on a as needed basis
• Identify shortfalls within the Operations Section. Communicate and problem-solve the shortfalls. Submit appropriate documentation to mitigate the shortfall.
• Works with the Planning Section and Division/Group Supervisors in the development of the operations portion of the IAP o Supervises and tracks the execution of the operations portion of the IAP o Ensure unit logs are completed and submitted in a timely manner
• Ensure personnel assigned complete CTRs in a timely manner
• Reviews and approves operations section’s CTRs.
• Establish and maintains daily communications with subordinate Division/Group
Supervisors, as well as the IC and all members of the C&G Staff.
• Plans for de-mobilization and identifies After Action Report issues
Dispatch
• Dispatch will operate during a Tropical storm and Category 1 Hurricane in their normal duty station at ENP HQ. Two dispatchers and one LE Ranger qualified as an EMT-Basic (at a minimum) will remain at HQ for the duration of the storm.
• In the event of a Category 2 Hurricane, Dispatch will move their mobile radio unit to the reception area in the LE offices. This room is part of the original building (concrete roof) and has no exterior openings. Two dispatchers and one LE Ranger qualified as an EMT-Basic (at a minimum) will remain in HQ for the duration of the storm.
o Footprints request will be submitted for a cable to the reception office to connect the mobile unit.
• In the event of a Category 3 or higher all dispatch operations will cease and no staff will remain in the park.
o Liaison Officer will notify all other south Florida Parks about the full shut down of dispatch by the end of the Preliminary Hurricane Prep Operational Period (72-48 hrs.
BFL) in order to provide sufficient time for them to make other communications arrangements.
o Commercial Lodging will be provided to qualifying dispatch…