B08_Contract_Price_Schedule_Fillable.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Repoint North Barbette Tier Federal contract opportunity
Solicitation number
140P2019R0015
Issued by
Department of the Interior National Park Service National Office

About this file

PSP Vol II - Contract Price Schedule Fillable

View the file

Other files for this federal contract opportunity

Other files attached to Repoint North Barbette Tier, newest first.
File Type Posted
SF30_Amendment_9.pdf PDF
Q&As_Spreadsheet,_Amend_9.xlsx XLSX spreadsheet
FOPO_Amendment_8.pdf PDF
Amendment_No._3_SF30.pdf PDF
SF30_Amendment_7.pdf PDF
Q&As_Spreadsheet,_Amend_7.pdf PDF
5-Appendix_A_-_Lead_and_Asbestos.pdf PDF
2-FOPO_Mortar_Removal_Reference_Photo.pdf PDF
4-Appendix_E-_Microorganism_Report_revised.pdf PDF
3-FOPO_Demolition_Reference_Photos.pdf PDF
SF30_Amendment_6.pdf PDF
1-Q&As_Spreadsheet.pdf PDF
SF30_Form.pdf PDF
011100_Summary_of_Workjpk2018-04-09.pdf PDF
SF30_Amendment_4.pdf PDF
4-B08_Revised_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
General_Decision_Number_CA18,_5-3-19.pdf PDF
FOPO_150103,_PreBid_Slides.pptx PPTX presentation
FOPO_150103,_Pre-Proposal_Meeting_Sign-In_Sheet.pdf PDF
SF1442_Amendment_II.pdf PDF
B08_SF1442,_3-28-18.pdf PDF
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
B08_SF30_Amendment_1.pdf PDF
5-B08_Solit_PSP_Vol_1.pdf PDF
B08_SF1442_and_Clauses.pdf PDF
2-B08_Drawings_Combined_Set.pdf PDF
4-B08_FOPO_Site_Staging.pdf PDF
3_B08_General_Decision_Wage_Determinations_03-28-2019.pdf PDF
6-B08_Solit_PSP_Vol_II.pdf PDF
1-B08_FOPO_150103__Specifications.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: 140P2019R0015
PARK - PMIS: FOPO - 150103
DEVELOPED AREA: Fort Point National Historic Site
PROJECT TITLE: REPAIR LEAKS IN NORTH BARBETTE TIER AND REPOINT BRICK MASONRY

Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.

CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Base Project, Barbette Tier Waterproofing
1ASlab replacement and waterproofing1Lump Sum-
1BBrick repointing9644SF
1CMasonry cleaning675SF
1DBrick repair150EA
SUBTOTAL PRICE, Contract Line Item Number 1 ------------------------------------$0.00
2Base Project, Repointing at Parade Wall
2ABrick repointing1747.5SF
SUBTOTAL PRICE, Contract Line Item Number 2 ------------------------------------$0.00
TOTAL BASE PRICE (Contract Line ItemS Number 1 and 2) ------------------------------------$0.00
3Option A, East Bastion and North Walls
3ABrick repointing3540SF
3BMasonry cleaning4950SF
3CBrick repair150EA
TOTAL PRICE, OPTION A (Contract Line Item Number 3) ------------------------------------$0.00
4Option B, Second Tier Casemates
4ABrick repointing9285SF
4BMasonry cleaning10700SF
TOTAL PRICE, OPTION B (Contract Line Item Number 4) ------------------------------------$0.00
5Option C, Third Tier Casemates
5ABrick repointing21925SF
5BMasonry cleaning10700SF
TOTAL PRICE, OPTION C (Contract Line Item Number 5) ------------------------------------$0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 3 through 5) ------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 5) -----------$0.00
All measurement and payment information is included in the project specifications, Section 012700.

PARK - PMIS

CPS - &P

Design-Bid-Build Sample

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: N2011080811
PARK - PMIS: YELL 012345
DEVELOPED AREA: Old Faithful
PROJECT TITLE: Johnstonian Visitors Center
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identify why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Visitors Center1Lump Sum$0.00
2Water Line400L.F.- 0
3Sanitary Sewer line200L.F.- 0
4Rock Excavation150C.Y.- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum$ - 0
6OPTION B, Photovoltaic system1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 5 and 6) -------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 6) -------------$0.00
All measurement and payment information is included in the project specifications, Section 012700.

YELL - 012345

Design-Build Sample

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: N2011080811
PARK - PMIS: YOSE 012345
DEVELOPED AREA: Yosemite Valley
PROJECT TITLE: Design and Build a New Structure
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Design1Lump Sum$0.00
2Construction1Lump Sum$0.00
TOTAL BASE PRICE (Contract Line Item Number 1 through 2) ---------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum$0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3 ) -----------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 3) ------------$0.00

YOSE - 012345