VAFO 211497 - Rehab Visitors Center
Solicitation number
140P2018R0026
Issued by

About this file

Attach_4_Spec_Vol_1

View the file

Other files

File Type Posted
140P2018R0026_AMD_4.pdf PDF
140P2018R0026_AMD_3_Drawings.pdf PDF
140P2018R0026_AMD_3.pdf PDF
140P2018R0026_AMD_2.pdf PDF
AMD_1_SPECS.pdf PDF
140P2018R0026_AMD_1.pdf PDF
AMD_1_PRE_PROP_AGND.pdf PDF
AMD_1_SIGN_IN_SHEET.pdf PDF
AMD_1_DWGS.pdf PDF
Attach_3_Sub_Plan.docx DOCX document
Attach_1_Exp_Form.docx DOCX document
Attach_6_Dwgs.pdf PDF
140P2018R0026_Solicitation.pdf PDF
Attach_2_PPQ_Form.docx DOCX document
Attach_5_Spec_Vol_2.pdf PDF
B01_PRESOL.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VALLEY FORGE NATIONAL

HISTORICAL PARK

York County, Pennsylvania

Rehabilitate Visitor Center for Energy Efficiency, Safety and ADA Access Project

VAFO

PMIS NO. 211497

PROJECT SPECIFICATIONS

VOL. 1

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

JULY 10, 2018

VAFO 211497 000110

071018

TABLE OF CONTENTS

DIVISION SECTION TITLE

DIVISION 00 – PROCUREMENT AND CONTRACTING REQIREMENTS

000110 TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

011100 SUMMARY

012601 CONTRACT MODIFICATION PROCEDURES

012700 DEFINITION OF CONTRACT LIMIT LINES

013100 PROJECT MANAGEMENT & COORDINATION

013216 CONSTRUCTION SCHEDULE

0132 33 PHOTOGRAPHIC DOCUMENTATION

0133 23 SUBMITTAL PROCEDURES

013523 SAFETY REQUIREMENTS

014000 QUALITY REQUIREMENTS

014200 REFERENCE STANDARS

015000 TEMPORARY FACILITIES AND CONTROLS

015639 TEMPORARY TREE AND PLANT PROTECTION

015719.11 INDOOR AIR QUALITY MANAGEMENT

015719.12 NOISE & ACOUSTICS MANAGEMENT

015723 TEMPORARY STORM WATER POLLUTION PREVENTION

016700 PRODUCT REQUIREMENTS

017329 CUTTING AND PATCHING

017340 EXECUTION

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

017700 CLOSEOUT PROCEDURES

017823 OPERATION AND MAINTENANCE DATA

017900 DEMONSTRATION AND TRAINING

018113 SUSTAINABLE DESIGN REQUIREMENTS FOR NON-LEED PROJECTS

019114 TOTAL BUILDING COMMISSIONING

TABLE OF CONTENTS

DIVISION SECTION TITLE

TECHNICAL SECTIONS

DIVISION 02 – EXISTING CONDITIONS

024119 SELECTIVE DEMOLITION

DIVISION 03 - CONCRETE

033000

CAST-IN-PLACE CONCRETE

033543 SPECIAL CONCRETE FLOOR FINISHES

DIVISION 04 – MASONRY

042200 CONCRETE UNIT MASONRY

047200 CAST STONE MASONRY

DIVISION 05 - METALS

051200 STRUCTURAL STEEL

053000 STEEL DECK

055000 METAL FABRICATIONS

055213 PIPE AND TUBE RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061053 MISCELLANEOUS ROUGH CARPENTRY

064113 WOOD AND PLASTIC-FACED ARCHITECTURAL CABINETS

064116 PLASTIC LAMINATE-CLAD ARCHITECTURAL CABINETS

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

070150.19 PREPARATION FOR REROOFING

072100 THERMAL INSULATION

075216 SBS-MODIFIED BITUMEN MEMBRANE ROOFING

076200 SHEET METAL FLASHING AND TRIM

077200 ROOF ACCESSORIES

078413 PENETRATION FIRESTOPPING

079200 JOINT SEALANTS

TABLE OF CONTENTS

DIVISION SECTION TITLE

DIVISION 08 – OPENINGS

081113

HOLLOW METAL DOORS AND FRAMES

083213 INTERIOR SLIDING GLASS DOORS

084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

084213 ALUMINUM-FRAMED ENTRANCES

084229.33 SWINGING AUTOMATIC ENTRANCES

087100 DOOR HARDWARE

088000 GLAZING

088000.13 INTERIOR GLAZING

DIVISION 09 - FINISHES

092116.23 092216

GYPSUM BOARD SHAFT WALL ASSSEMBLIES

NON-STRUCTURAL METAL FRAMING

092900 GYPSUM BOARD

093013 CERAMIC TILING

095113 ACOUSTICAL PANEL CEILINGS

096513 RESILIENT BASE AND ACCESSSORIES

096519 RESILIENT TILE FLOORING

096813 TILE CARPETING

096816 SHEET CARPETING

098436 SOUND ABSORBING CEILING UNITS

099123 INTERIOR PAINTING

DIVISION 10 - SPECIALTIES

101423

PANEL SIGNAGE

102113.13 METAL TOILET COMPARTMENTS

102800 TOILET, BATH AND LAUNDRY ACCESSORIES

105123 PLASTIC-LAMINATE-CLAD WOOD LOCKERS

107500 FALL RESTRAINT

DIVISION 11 - EQUIPMENT

113100 RESIDENTIAL APPLIANCES

TABLE OF CONTENTS

DIVISION SECTION TITLE

DIVISION 12 - FURNISHINGS

122413

ROLLER WINDOW SHADES

123661.19 QUARTZ AGGLOMORATE COUNTER TOPS

124816 ENTRANCE FLOOR GRILLES

DIVISION 14 - CONVEYING EQUIPMENT

142600

LIMITED-USE-LIMITED-APPLICATION ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 00 01

SEPARATION OF WORK BETWEEN THE TRADES

21 00 02 FIRE PROTECTION SPECIAL CONDITIONS

21 00 03 SCOPE OF WORK

21 05 17 SLEEVES AND SEALS FOR FIRE SUPPRESSION PIPING

21 05 18 ESCUTCHEONS FOR FIRE SUPPRESSION PIPING

21 05 20 PIPING AND FITTING MATERIALS

21 05 23 FIRE SUPPRESSION VALVES

21 05 29 HANGERS, SUPPORTS, ANCHORS AND GUIDES FOR FIRE SUPPRESSION SYSTEMS

21 05 48 VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

21 05 53 IDENTIFICATION OF FIRE SUPPRESSION PIPING AND EQUIPMENT

21 05 80 ACCESS DOORS IN GENERAL CONSTRUCTION

21 05 85 FIRE PROTECTION FIRESTOPPING

21 05 95 FIRE PROTECTION BASIC MATERIALS AND METHODS

21 08 00 COMMISSIONING OF FIRE PROTECTION SYSTEMS

21 12 00 STANDPIPE AND HOSE SYSTEMS

21 13 13 WET PIPE SPRINKLER SYSTEMS

DIVISION 22 - PLUMBING

22 00 01

SEPARATION OF WORK BETWEEN TRADES

22 00 02 PLUMBING SPECIAL CONDITIONS

22 00 03 SCOPE OF WORK

22 05 17 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

22 05 18 ESCUTCHEONS FOR PLUMBING PIPING

22 05 20 PIPING AND FITTING MATERIALS

22 05 23 VALVES

22 05 29 HANGERS, SUPPORTS, ANCHORS AND GUIDES

22 05 30 DISINFECTING OF WATER SUPPLY SYSTEM

22 05 35 BACKFLOW PREVENTION

22 05 48 VIBRATION ISOLATION AND SEISMIC CONTROL FOR PLUMBING SYSTEM

22 05 53 IDENTIFICATION OF PLUMBING PIPING AND EQUIPMENT

22 05 80 ACCESS DOORS IN GENERAL CONSTRUCTION

22 05 85 PLUMBING FIRESTOPPING

22 05 90 TESTING

22 05 95 PLUMBING BASIC MATERIALS AND METHODS

22 07 19 INSULATION

22 08 00 COMMISSIONING OF PLUMBING SYSTEM

22 11 16 DOMESTIC WATER PIPING AND FITTING MATERIALS

22 11 19 DOMESTIC WATER SPECIALTIES

22 13 16 SANITARY WASTE AND VENT PIPING AND FITTING MATERIALS

22 13 19 SANITARY WASTE PIPING SPECIALTIES

22 42 00 PLUMBING FIXTURES AND TRIM

DIVISION 23 - HVAC

23 00 02 HEATING, VENTILATION, AND AIR CONDITIONING GENERAL CONDITIONS

23 00 05 ACCESS DOORS IN GENERAL CONSTRUCTION

23 02 00 FIRESTOPPING

23 05 13 ELECTRIC MOTORS

23 05 16 EXPANSION COMPENSATORS

23 05 23 VALVES

23 05 29 HANGERS, ANCHORS AND SUPPORTS

23 05 40 ACOUSTICS

23 05 48 VIBRATION ISOLATION

23 05 53 SYSTEMS IDENTIFICATION

23 05 93 TESTING, ADJUSTING AND BALANCING

23 07 00 INSULATION

23 09 00 INSTRUMENTS

23 09 23

BUILDING MANAGEMENT AND CONTROL SYSTEMS (BMCS)

23 11 13 SHEET METAL, DUCTWORK, AND ACCESSORIES

23 21 23 PUMPS

23 25 00 PIPE CLEANING AND CHEMICAL WATER TREATMENT

23 26 00 WATER SPECIALTIES

23 33 13 DAMPERS

23 33 20 DUCT CLEANING

23 36 00 AIR TERMINAL UNITS

23 36 10 AIR OUTLETS AND INLETS

23 41 00 AIR FILTERS AND CLEANERS

23 52 10 PIPING AND ACCESSORIES

23 55 10 REFRIGERATION MACHINES (AIR COOLED)

23 73 00 FACTORY ASSEMBLED AIR HANDLING UNITS

23 73 05 FANS

23 82 16 COILS

23 82 19 FAN COIL UNITS

23 84 13 STEAM HUMIDIFIERS

23 84 40 SPACE HEATING UNITS

23 85 00 VARIABLE FREQUENCY CONTROLLERS

DIVISION 26 – ELECTRICAL

26 00 01 ELECTRICAL GENERAL CONDITIONS

26 00 05 ACCESS DOORS IN GENERAL CONSTRUCTION

26 02 50 SYSTEMS IDENTIFICATION

26 02 70 TEMPORARY LIGHTING AND POWER

26 02 80 EQUIPMENT CONNECTIONS AND COORDINATION

26 02 90 CEILING, FLOOR AND WALL ELECTRICAL PENETRATION FIRE SEALS

26 05 19 600 VOLT WIRE AND CABLE

26 05 33 RACEWAYS AND BOXES

26 05 48 VIBRATION ISOLATION AND SEISMIC RESTRAINTS

26 05 73

OVERCURRENT PROTECTIVE DEVICE

COORDINATION STUDY

26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS

26 09 36 MODULAR DIMMING CONTROLS

26 24 16 PANELBOARDS

26 27 26 WIRING DEVICES

26 28 16 DISCONNECT SWITCHES

26 31 00 PHOTOVOLTAIC SYSTEM

26 50 00 LUMINAIRES AND ACCESSORIES

26 50 06 LIGHTING CONTROL DEVICES

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 00 00

SECURITY GENERAL SYSTEM REQUIREMENTS

28 05 28 FIRESTOPPING FOR COMM-SECURITY SYSTEMS

28 13 00 ACCESS CONTROL SYSTEM

28 13 01 ACCESS CONTROL CARD READERS

28 16 00 INTRUSION DETECTION SYSTEM

28 21 00 VIDEO SURVEILLANCE REMOTE SENSORS AND DEVICES

28 23 00 VIDEO SURVEILLANCE MANAGEMENT SYSTEM

28 31 11 LIFE SAFETY ALARM SYSTEM

DIVISION 32 – EXTEROR IMPROVEMENTS

321216

ASPHALT PAVING

321223 IMPRINTED ASPHALT

321313 CONCRETE PAVING

END OF TABLE OF CONTENTS

https://www.arcat.com/sd/divs/sd_div28.shtml

VAFO - 211497 01 11 00 - 1

091015 SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Work under other contracts.

3. Contractor use of premises.

4. Public use of site.

5. Occupancy requirements for buildings.

6. Work Restrictions.

7. Special Construction Requirements.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Valley Forge National Historical Park, King of Prussia, PA.

B. The Work consists of the following:

1. Creation of a Temporary Visitor’s Center in one of the existing parking areas.

a. Preparation of the site to receive temporary trailer and storage units, including installation of power and communication lines to same. Adjustments to parking area to facilitate new traffic patterns including way-finding signage.

b. Delivery to the site of trailers; assembly, interior finishes, furnishings, roofing and construction of custom temporary steps, ramps and platforms.

c. Moving of staff offices and equipment from existing Visitor’s Center to Temporary Visitor’s Center

2. Rehabilitation of Visitor’s Center and Re-establishment of Functionality

a. Demolition of some interior finishes and construction to allow for new finishes and building services.

b. Upgrade interior finishes.

c. Replacement of fixtures in public rest room areas.

d. Reconfiguring office spaces and furnishings.

e. New, more efficient HVAC, electrical distribution, lighting, storm and sanitary plumbing, fire protection, communications, building control and building security systems.

f. Improvements to building exterior envelope including new roofing, new glazing and sealants and new entrances/exits.

g. Commissioning of building systems.

h. Coordination with installation of exhibits and displays.(Separate Contract)

i. Moving of staff office equipment from temporary Visitor’s Center to rehabilitated

Visitor’s Center.

3. Return of Parking Area to Original Condition

a. Removal of Temporary Visitor’s Center including service lines.

VAFO - 211497 01 11 00 - 2

b. Removal of temporary site work for altered vehicular patterns and returning landscaping to former condition.

C. Project will be constructed a single prime contract.

1.3 WORK UNDER OTHER CONTRACTS

A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts.

B. Other Contracts: The Government has awarded separate contract(s) to design and install new exhibits and displays to be installed in the rehabilitated visitor center. The installation is planned to begin after substantial completion of this contract. Completion of that work will depend on successful completion of preparatory work under this Contract.

1.4 CONTRACTOR USE OF SITE

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine constructions operations to the existing Visitor’s Center building and the site area surrounding same as indicated on the drawings.

2. For the Temporary Visitor’s Center, confine construction to the limits indicated. Take notice of the work required to provide overhead utility lines between the existing Visitor’s Center and the Temporary Visitor’s Center.

3. Limit site disturbance, including earthwork and clearing of vegetation, to minimum extent necessary to complete the work beyond building perimeter; surface walkways, patios, surface parking, and utilities less than 12 inches in diameter; primary roadway curbs and main utility branch trenches; and constructed areas with permeable surfaces (such as pervious paving areas, storm water detention facilities, and fields) that require additional staging areas in order to limit compaction in the constructed area.

B. Storage of Materials: Confine storage of materials to areas indicated for this use.

C. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction.

4. Do not fasten ropes, cables, or guys to existing trees.

5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

VAFO - 211497 01 11 00 - 3

D. Driveways and Entrances: Keep driveways and existing vehicular circulation roads and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

E. Construction Camp: Establishment of a camp within the park will not be permitted.

F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

1.5 PUBLIC USE OF SITE

A. The building will be closed to the public during construction.

1.6 OCCUPANCY REQUIRMENTS FOR BUILIDINGS

A. Existing Buildings

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities in accordance with all life safety regulations.

B. New Buildings

1. Government Occupancy of Completed Areas of Construction: Government reserves the right to occupy and to place and install equipment in completed areas of building, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the entire project.

a. Contracting Officer will prepare a Beneficial Occupancy letter for each specific portion of the Work to be occupied before Government occupancy.

b. Obtain a Certificate of Occupancy from the NPS before Government occupancy.

c. Before partial Government occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Government will operate and maintain mechanical and electrical systems serving occupied portions of building.

d. On occupancy, Government will assume responsibility for maintenance and custodial service for occupied portions of building.

VAFO - 211497 01 11 00 - 4

1.7 CONDUCT OF OPERATIONS

A. At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

B. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

1.8 WORK RESTRICTIONS

A. Work on Saturdays, Sundays, Federal holidays or any time outside of the on-site work hours identified in the next section may not performed without prior consent from the Contracting Officer. Submit requests 48 hours in advance of the work to the Contracting Officer for approval.

B. On-Site Work Hours: The on-site work hours are anytime between 6:00 AM and 6:00 PM.

C. Existing Utilities:

1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

D. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Contracting Officer’s written permission.

3. Hours for Utility Shutdowns: As allowed by Contracting Officer.

E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes.

1.9 SPECIAL CONSTRUCTION REQUIREMENTS

A. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction stage.

1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.

VAFO - 211497 01 11 00 - 5

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

VAFO - 211497 01 26 01 - 1

031414 CONTRACT MODIFICATION PROCEDURES

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

VAFO - 211497 01 26 01 - 2

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation to be made available.

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

VAFO - 211497 01 26 01 - 3

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that they are included in the hourly rate shown, or contractor is not requesting reimbursement.

Contractor may utilize the government provided Contractor Estimate Form, or their http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm#ct

VAFO - 211497 01 26 01 - 4

own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.

Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS.

All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.

Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)

VAFO - 211497 01 26 01 - 5

b. Construction Blue Book

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.

Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:

Overhead………………10% Profit……………… 5%

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

VAFO - 211497 01 26 01 - 6

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

PART 2 - PRODUCTS

PART 3 - EXECUTION

END OF SECTION 012601

VAFO - 211497 01 27 00 - 1

082714 DEFINITION OF CONTRACT LINE ITEMS

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - LIST OF CONTRACT LINE ITEMS

1. Contract Line Item No. 1 Building Rehabilitation (reference PMIS # 211497).

a. This item consists of the following:

i. Moving equipment and furnishings from existing Visitor’s Center to spaces iden-tified within the Park.

ii. Moving existing and new equipment and furnishing back into the Rehabilitated Visitor’s Center.

iii. Demolition, removals, salvage and reuse of selected existing items

iv. Rehabilitation of interior architectural elements.

v. Rehabilitation of building plumbing, fire protection, HVAC and electrical sys-tems to achieve enhanced energy performance.

vi. Rehabilitation of building exterior enclosure including roofing, glazing and weather sealants to enhance building energy performance

vii. Rehabilitation of building interior to enhance visitor’s experience and staff productivity.

b. Measurement for payment will be based upon percentage complete and measured and tracked using the schedule of values.

2. Contract Line Item No. 2 Temporary Visitor Center (reference PMIS # 211497).

a. This item consists of the creation of a temporary visitor center in one of the existing park-ing lots.

i. Preparation of the site to receive temporary trailer and storage units, including in-stallation of power and communication lines.

ii. Adjustments to parking area to facilitate new traffic patterns including way-finding signage.

iii. Delivery to the site of the trailers; assembly, interior finishes, furnishings, roofing and construction of custom temporary steps, ramps and platforms.

3. Contract Line Item No. 3 Security System (reference PMIS # 244026)

a. This item consists of upgrading the Visitor’s Center security system as follows:

VAFO - 211497 01 27 00 - 2

082714 DEFINITION OF CONTRACT LINE ITEMS

i. New electronic access control systems.

ii. Video surveillance systems.

iii. Include all conduit, terminal points, alarm devices security panel and wiring.

iv. Construction contractor to maintain security and fire protection for the Visitor’s

Center throughout the construction phase and Substantial Completion.

4. Contract Line Item No. 4 - Option A - Ceilings and Lighting (reference PMIS # 248737)

a. This item consists of replacing ceilings and light fixtures throughout the facility as per contractor bidding notes on drawings.

1. Contract Line Item 5 - Option B - Interior Finishes, Furniture, Equipment and Building Signage (reference PMIS # 248779)

a. This line item consists of Interior Finishes, Furniture, Equipment and Building Signage as per contractor bidding notes on drawings.

b. Measurement for payment will be based upon percentage complete and measured and

END OF SECTION 01 27 00

VAFO - 211497 01 31 00 - 1

091015 PROJECT MANAGEMENT AND COORDINATION

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Definitions

2. Construction Coordination.

3. Submittals

4. Coordination Drawings.

5. Requests for Information (RFIs).

6. NPS/DSC SharePoint Project Website.

7. Project meetings.

8. Environmental Coordination.

9. Permits

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

4. Section 01 91 14 “Total Building Commissioning” for coordinating the work with

Owner’s Commissioning Authority.

1.2 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

VAFO - 211497 01 31 00 - 2

5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Permit requirements.

7. Pre-installation conferences.

8. Project closeout activities.

9. Commissioning activities.

1.3 SUBMITTALS

A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.

1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to the Contracting Officer (CO) for resolution of such conflicts.

c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.

d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.

e. Indicate required installation sequences.

2. Sheet Size: At least 8-1/2 by 11 inches (215 by 280 mm) but no larger than 30 by 40 inches (750 by 1000 mm).

3. Number of Copies: Submit two opaque copies of each submittal. Contracting Officer will return one copy.

VAFO - 211497 01 31 00 - 3

4. Refer to individual Sections for Coordination Drawing requirements for Work in those Section

B. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of visible ceiling-mounted devices relative to acoustical ceiling grid. Supplement plan drawings with section drawings where required to adequately represent the Work.

2. Plenum Space: Indicate subframing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within ceiling plenum to accommodate layout of light fixtures indicated on Drawings. Indicate areas of conflict between light fixtures and other components.

3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.

4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.

5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.

6. Mechanical and Plumbing Work: Show the following:

a. Sizes and bottom elevations of ductwork, piping, and conduit runs, including insulation, bracing, flanges, and support systems.

b. Dimensions of major components, such as dampers, valves, diffusers, access doors, cleanouts and electrical distribution equipment.

c. Fire-rated enclosures around ductwork.

7. Electrical Work: Show the following:

a. Runs of vertical and horizontal conduit 1-1/4 inches (32 mm) in diameter and larger.

b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire-alarm locations.

c. Panel board, switch board, switchgear, transformer, busway, generator, and motor

d. Location of pull boxes and junction boxes, dimensioned from column center lines.

8. Fire-Protection System: Show the following:

a. Locations of standpipes, mains piping, branch lines, pipe drops, and sprinkler heads.

9. Review: Contracting Officer (CO) will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If CO determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, CO will so inform Contractor, who shall make changes as directed and resubmit.

10. Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 01 33 23 "Submittal Procedures."

VAFO - 211497 01 31 00 - 4

C. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:

1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.

2. File Preparation Format: AutoCad dwg., Version 2013 operating in Microsoft Windows 7 operating system.

3. File Submittal Format: Submit or post coordination drawing files using Portable Document Format (PDF) file format.

4. Contracting Officer (CO) will furnish Contractor one set of digital data files (AutoCad dwg.) of Drawings for use in preparing coordination digital data files.

a. CO makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings.

b. Digital Data Software Program: Drawings are available in AutoCad.dwg.

D. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan.

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

8. Waste Management Plan.

9. Quality Control Plan.

10. Number and location of parking spaces’ for construction worker’s personal vehicles.

11. Temporary Storm Water Pollution Prevention Plan (SWPP).

12. Indoor Air Quality (IAQ) Management Plan.

13. Contractors Commissioning Plan.

14. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

E. All items listed must be provided to the Contracting Officer before the Pre-Construction Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies.

Work shall not commence until written Notice to Proceed has been issued.

VAFO - 211497 01 31 00 - 5

1.4 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC SharePoint Project website.

1. CO will not respond to RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Field dimensions and conditions, as appropriate.

7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

8. Contractor's signature.

9. Requested date for response.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Form: Complete the RFI Form on the NPS/DSC SharePoint website as follows:

1. Enter the general information at the top of the form.

2. Under the “Action” section at the bottom of the form, select “Question” then select

“CMR” in the drop-down of the “Send to” box.

3. Enter the details of the question and attach related documents.

4. Select “Submit Form” at the bottom of the page.

D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond. CO will determine the critical nature of each RFI and issue a response accordingly.

1. The following are not considered to be RFIs and will receive no action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract

Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Architect's actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

VAFO - 211497 01 31 00 - 6

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

1.5 PROJECT WEB SITE

A. Use the NPS/DSC SharePoint Project website for communication throughout the contract period. The NPS/DSC SharePoint Project website will be used for the following functions:

1. Project directory.

2. Project correspondence.

3. Meeting agendas and minutes.

4. Contract modifications forms and logs.

5. RFI form and processing.

6. Task and issue management.

7. Photo documentation.

8. Baseline schedule, schedule updates and calendar management.

9. Submittal form and processing.

10. Payment coordination documentation.

11. Drawing and specification document hosting, viewing, and updating.

12. Online document collaboration.

13. Reminder and tracking functions.

14. Archiving functions.

15. Notification of submittal and RFI statuses and current responsible party.

16. Permits and addendums

B. Some documents however are not suitable to be shared using the NPS/DSC SharePoint Project website. Documents containing Personal Identifying Information (PII) (i.e. certified payrolls) shall not be shared using the NPS/DSC SharePoint Project website and shall be coordinated with the SharePoint Project team as appropriate.

C. Submit to the CO a list of all employees who will need access to the website. The users will receive an invitation to register from the Department of Interior (DOI). Once the user is registered on the DOI website, they will be given access to the NPS/DSC SharePoint Project website. For login procedures and other SharePoint information, refer to the Workflows website at http://www.nps.gov/dscw/precon_spproj.htm.

D. All users will be required to have the following software packages:

1. Internet Explorer version 7 or later.

2. Adobe Acrobat Professional (Pro) version 9 or later

1.6 PROJECT MEETINGS

A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:

http://www.nps.gov/dscw/precon_spproj.htm

VAFO - 211497 01 31 00 - 7

1. Roles & Responsibilities/ Lines of Authority.

2. Park rules and regulations.

3. Jobsite Safety.

4. Resolution of comments on required Division 01 documents.

5. Coordination of Subcontractors.

6. Labor law application.

7. Modifications.

8. Schedule of Values.

9. Payments to Contractor.

10. Payroll reports.

11. Contract time.

12. Liquidated damages.

13. Contractor Performance Evaluation.

14. Display of Hotline posters.

15. Notice to proceed.

16. Correspondence procedures.

17. NPS/DSC SharePoint Project website.

18. Acceptance/rejection of work. (Ongoing Punch List)

19. Progress meetings.

20. Submittal procedures.

21. NPS Final Accessibility Inspection.

22. Environmental requirements.

23. Permit requirements.

24. As-constructed drawings/operation and maintenance (O&M) manuals.

25. Saturday, Sunday, holiday and night work.

26. Reference materials.

27. Value engineering.

B. Progress Meetings: The Contracting Officer will schedule weekly meetings with the Contractor.

1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings.

All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:

a. Approval of minutes of previous meetings.

b. Submittal status.

c. Review of off-site fabrication and delivery schedules.

d. Requests for information (RFI) and other issues.

e. Modifications.

f. Work in progress and projected.

1) Status of required inspections (Special Inspections, Accessibility, etc.)

g. Inspections of work in progress and projected (Special inspections,

h. Construction Schedule update (provide updated CPM).

i. Status of Project Record Drawings and O&M manuals.

j. Other business relating to work.

VAFO - 211497 01 31 00 - 8

k. Permit requirements.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise CO of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration,…