140P1526Q0089_Amendment_3_Questions_and_Answers_0003.pdf
PDF 191 KB Posted
- Solicitation number
- 140P1526Q0089
About this file
This is an Amendment (#0003) to a Request for Quote (RFQ) issued by the National Park Service Contracting Operations - Central office for backflow inspections, testing, and reporting services at the Grand Canyon Regional Area (GRCA). The solicitation number is 140P1526Q0089.
The amendment consists of a Questions and Answers section addressing clarifications on contract requirements. Key points include: contractors must inspect, test, and report on 313 backflow assemblies (not 435 as referenced in background documentation); no reclaim water assemblies require testing despite mentions in facility descriptions; contractors must maintain general liability insurance with minimum coverage of $100,000 per person, $500,000 per occurrence, and $500,000 property damage, with the United States of America named as an insured party; tester certifications must meet requirements outlined in the original solicitation and Amendment #2; and the digital Mako MK 5 tester gauge is approved if accompanied by appropriate calibration certification. The contracting officer is Taylor Jones (taylor_jones@ios.doi.gov, 520-780-9294). No other solicitation clauses or dates are modified by this amendment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
CONTRACTING OPERATIONS - CENTRAL
1849 C Street
NW Washington, DC 20240
General: No other solicitation clauses or dates change with this Amendment.
Contracting Officer: Taylor Jones, taylor_jones@ios.doi.gov, 520-780-9294
Solicitation #: 140P1526Q0089
Amendment #: 0003
Backflow inspections, testing and reporting – GRCA
Question # Question Answer/Response
1. Section 2.1 states 313 assemblies will be tested. In
Section 2.3 an additional 16 assemblies are required for this RFQ. I noticed in the on page 43 of 86 of the SOW it was stated currently 177 Park owned assemblies and 258
NPS-GRCA assemblies are managed for a total of 435.
How many backflow assemblies are required to be inspected, tested, reported, and maintained?
Cross Connection Control &
Backflow Prevention Program is informational for how the larger program is managed – not the authoritative source for the number of assemblies.
Use the assemblies listed in the table for inspection, testing, and reporting requirements which is 313 total.
2. Is it required to have general liability insurance coverage and if so, how many is required?
1452.228-70 Liability Insurance –
Department of the Interior (Jul
1999)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting
Officer by an insurance company which is acceptable to the
Contracting Officer. The named insured parties under the policy shall be the Contractor and the
United States of America. The amounts of the insurance shall be not less than as follows:
$100,000.00 each person
$500,000.00 each occurrence
$500,000.00 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which mailto:taylor_jones@ios.doi.gov
United States Department of the Interior
NATIONAL PARK SERVICE
CONTRACTING OPERATIONS - CENTRAL
1849 C Street
NW Washington, DC 20240
General: No other solicitation clauses or dates change with this Amendment.
Contracting Officer: Taylor Jones, taylor_jones@ios.doi.gov, 520-780-9294 may adversely affect the interest of the Government in such insurance.
The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed.
The contractor shall furnish the
Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
3. Are there any reclaim water assemblies that are required to be tested, and if so, how many? These assemblies will have to be tested with a Non-potable- Reclaim Water approved tester gauge.
No reclaim assemblies are on the list to be tested. Mention of reclaim in the assemblies listed in the table for inspection is because it is in a facility that also has reclaim water but there are no reclaim backflow.
4. According to the SOW, tester requirement from GRCA recognizes ABPA. Do the attached certifications meet your requirement?
We will not review prior the close of the solicitation. If certificates meet the requirements outlined in the solicitation and/or amendment
#2 details, then that is all that is required.
5. Is the digital Mako MK 5 tester gauge approved for this solicitation along with the calibration certificate?
Yes, acceptable.