B09-_P1525Q0097_Amendment__2_0002.pdf
PDF 377 KB Posted
- Solicitation number
- 140P1525Q0097
About this file
This document is an Amendment (Amendment #0002) to a federal solicitation for a pressure pump replacement project at Tuzigoot National Monument in Clarkdale, Arizona. The amendment includes two questions and answers regarding the pump replacement, specifically addressing pump dimensions and site access. The first question asks about the height from the concrete base to the suction and discharge ports, which can be found in the attached Grundfos Pump Performance Datasheet. The second question concerns site access, with the government clarifying that vehicle access to the pump room is not available and that contractors must navigate a short trail and a flight of 10 concrete steps to reach the pump room. Accompanying the amendment are photographs of the existing pump installation and a site map showing the location of the pump room relative to the parking lot and visitor center entrance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1525Q0097_Amd_0002.pdf | ||
| B09-_P1525Q0097_Amendment_Questions_and_Answers_0001.pdf | ||
| Sol_140P1525Q0097_Amd_0001.pdf | ||
| Sol_140P1525Q0097.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
CONTRACTING OPERATIONS - CENTRAL
1849 C Street
NW Washington, DC 20240
General: No other solicitation clauses or dates change with this Amendment.
Contracting Officer: Taylor Jones, Taylor_A_Jones@nps.gov, 520-780-9294
Solicitation #: 140P1525Q0097
Amendment #: 0002
Pressure Pump Replacement – TUZI
Questions and Government Responses listed below:
QUESTIONS:
Question # Question Answer/Response
1. Can you please provide a height from the concrete base to the center of the suction and discharge ports of the existing pumps.
In the Scope of Work under attachments you will find a
Grundfos Pump Performance
Datasheet, on the General
Arrangement page the dimensions are listed and are exactly the same as the current pumps.
2. How good is the access to the pumps? Can the contractor access this building with a vehicle? Is their stairs to navigate to get to the pumps? Can pictures be provided?
Vehicle access to the pump room is not available. There are stairs to the pump room via a short trail from the front of the visitor center. See map on page four. The red line delineates access to the pump room. The location of the pump room is noted in relation to the parking lot and the
Staircase is noted.
mailto:Taylor_A_Jones@nps.gov
Start from
Parking lot
Location of pump room front door
Flight of 10 concrete steps
File details come from the government source that posted it. Updated .