Attachment_5_Q_A_Updated_0002.docx

DOCX document 25 KB Posted

Attached to
Pest Control for Bighorn Canyon National Recreatio
Solicitation number
140P1426Q0105
Issued by

About this file

This is a Questions and Answers document addressing clarifications on Solicitation 140P1426Q0105 for pest control services at Bighorn Canyon National Recreation Area, issued by the Department of the Interior National Park Service Intermountain Region. The solicitation covers a base period from award through September 1, 2027, followed by four annual option periods through August 31, 2031. The contract is a firm-fixed-price, small business set-aside requiring pest control services including spring (May/June) and fall (September/October) treatments at multiple facilities across two districts: Fort Smith, Montana (14 buildings including 11 housing units, an administrative building, and a maintenance shop) and Lovell, Wyoming (3 facilities). The contractor must provide exterior rodent bait stations and maintain general liability insurance with pesticide pollution coverage as required by the solicitation. Qualified licensed subcontractors are permitted for on-site treatment work, with Montana requiring commercial pesticide applicator licenses for individuals and operator licenses for those applying under licensed applicators, while Wyoming credentials only individuals.

The government is evaluating pricing for an optional six-month extension (Item 60) in addition to the base contract pricing. Prior experience evaluation allows documentation of three recent projects performed by either the prime contractor or proposed qualified subcontractors in standard narrative format. Service Contract Act wage determinations apply to both Big Horn County, Montana and Big Horn County, Wyoming locations and are available in SAM. Scheduled site visits are planned for September 9 in Fort Smith (5 Ave B at 10:00 AM MDT) and September 10 in Lovell (20 HWY 14A East at 10:00 AM MDT), with vendors required to confirm attendance by September 8 at 10:00 AM MDT by contacting Sharon LaRosa. Residents will be available for housing unit access during treatments, and no partial trip billing applies if units are unavailable. No prior CURE notices or corrections have been issued for pest control services in the past 12 months.

View the file

Other files

File Type Posted
Sol_140P1426Q0105_Amd_0003.pdf PDF
Attachment_6_SOW_Updated_0003.docx DOCX document
Sol_140P1426Q0105_Amd_0002.pdf PDF
Solicitation_BICA_Pest_Control_0001.pdf PDF
Sol_140P1426Q0105_Amd_0001.pdf PDF
Attachment_4_Q_A_0001.docx DOCX document
Attachment_1_SOW.docx DOCX document
Attachment_2_Wage_Determination_Big_Horn__MT.pdf PDF
Sol_140P1426Q0105.pdf PDF
Attachment_3_Wage_Determination_Big_Horn__WY.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No.

Question
Answer
1
Does the solicitation permit the prime contractor to use a

qualified pest-control subcontractor or teaming partner for all on-site treatment work in Montana and Wyoming? If so, are there specific subcontractor disclosures or approval requirements?

Yes, as long as qualified licensed subcontrator. The state only credentials the individual in Wyoming. Montana requires a commercial pesticide applicator license for individua;l and an operator license for those applying under a licensed applicator.

2
Please confirm the period of performance.
Date of award to 09/01/2027, then yearly after
3
The requirement schedule lists Items 10-50 (base plus four option

periods), while the price schedule also includes Item 60, “Pest Control-Additional 6 Months.” Is Item 60 required and included in the Government’s evaluated total?

We ask for the pricing for an additional 6 months to evaluate.

4
Is an on-site inspection or site visit mandatory for offerors, or

is the statement encouraging inspection only? If visits are available, please advise how interested offerors may arrange access

Site visit is not mandatory. At this time a scheduled site visit is not planned. Contact Sharon LaRosa if interested in a site visit.

5
Please confirm whether the Government expects the spring/fall

treatments to occur once per season at each building, subject to the 14-day resident notice for housing units

Spring (May/June) and fall (Sept/Oct) to all units.

6
Addresses
Fort Smith, MT 59035:

· 305 4th street (housing)

· 306 4th street (housing)

· 303 4th street (housing)

· 304 4th street (housing)

· 201 4th street A&B (housing)

· 203 4th street C&D (housing)

· 302 4th street (housing)

· 5 Ave B (admin building)

· 4 Ave B (maintenance shop)

· 302 Ave B (housing)

· 201 Ave B (housing)

· 203 Ave B (housing)

· 104 Ave C (housing)

· 104 2nd street (housing)

· Ok-A-Beh Marina

Lovell, WY 82431:

· 379 HWY 37 (housing)

· 381 HWY 37 (RM shop)

· 807 HWY37 (ranger station)

· Horseshoe Bend Marina

7
Respond to:
Sharon LaRosa Sharon_larosa@ios.doi.gov
8
May the required three prior-experience examples include projects performed by the proposed qualified subcontractor

Yes, qualified subcontractors

9
Are Service Contract Act (SCA) Wage Determinations applicable to

this requirement? If so, could the government please provide the applicable Wage Determinations for Big Horn County, MT and Big Horn County, WY?

Yes and they are in SAM under attachments.

10
Under the firm-fixed-price structure, are the bi-annual treatments

expected to cover all service needs, or is the contractor required to provide complimentary call-back/re-treatment services between the Spring and Fall visits if pests re-emerge? If call-backs are required, is there a limit to the number of covered visits?

Getting clarification.

11
For the 15 park housing units requiring a 14-day advance notice,

what is the protocol if a resident is unavailable or denies entry on the scheduled treatment day? Will the contractor be permitted to bill for a partial trip/dry run, or reschedule without penalty?

Units will be available. There will not be a partial trip.

12
For the Prior Experience evaluation factor, are there specific page

limits, formatting guidelines, or Past Performance Questionnaires (PPQs) required for the 3 recent projects, or is a standard narrative format acceptable?

Standard narrative

13
Are there designated on-site facilities at the North and South

districts for the disposal of non-hazardous pest control waste (such as spent traps or packaging), or is the contractor required to haul all waste off-site for disposal?

On-site trash disposal

14
During evaluation and technical review due to concerns of public safety for pesticides applications and dealing with some public health related pests while performing IPM Pest Management services as outlined within the Statement of Work, will the government require Prime Contractors to have direct pest industry experience as well as maintain proper pesticide General Liability insurance to include pesticide pollution coverage as per National Pest Management Association Standard of Care and Best Practices guidelines or will the government permit subcontractors to qualify Prime Contractors that do not have pest industry experience and/or pesticide related insurance?

Partially answered in previous questions. Liability insurance is required per the solicitation. Insurance is required of the prime.

15
What was the previous awarded Solicitation Number, Date awarded, and awarded value?

New solicitation

16
Has any part of the Statement of Work (SOW) changed in this solicitation compared to the last awarded contract? If so, what changed or was added?

New solicitation

17
Has the government issued any CURE or Notice of Correction for pest control services over the past 12 months at any locations?

No, see previous

18
Will the government provide any preference for SDVOSB or VOSB certified contractors in alliance with the government supporting veteran owned contractors?

At this time, it is a small business set-aside.

19
Can the government confirm the number of exterior rodent bait stations that are present?

No, based on square footage.

20
Will the government require exterior rodent bait stations to be provided by the contractor upon award?

Yes, bait stations will be provided by the contractor.

21
Can the Government confirm the Year 4 and Year 5 period-of-performance dates? We are concerned that the solicitation lists Year 4 as 9/01/2029–12/31/2030 and Year 5 as 9/01/2030–12/31/2031, each spanning 16 months rather than the 12-month duration used in the base year and other option periods. Should these instead read 9/01/2029–8/31/2030 for Year 4 and 9/01/2030–8/31/2031 for Year 5?

PoP was changed in Amendment 0001.

22
Site Visit scheduled
Sept. 9 In Fort Smith the admin building, 5 Ave B, Fort Smith, MT a

Sept. 10 Lovell VC, 20 HWY 14A East, Lovell, WY.

Both days at 10am MDT.

Please contact Sharon LaRosa 24 hrs prior to Sept. 9 if attending. If no vendors contact the CO, the site visit will be cancelled.

23
Whether both districts can be inspected on the same day.
No
24
The meeting location and on-site point of contact for each district..
Bill Pickett (Park POC)

See above for meeting location

25
The names and information required for each attendee
Name, Company, Representing what company if subcontractor. Email or phone,
26
Identification, vehicle-registration, security, or advance-access requirements.
None required. Will be meeting outside of park, and will caravan in own vehicle to additional sites.
27
Required personal protective equipment or other safety requirements.
None required for site visit. Work to be performed with standard industry PPE requirements.
28
Any restrictions on photographs, measurements, or access to occupied housing units.

No restrictions on photographs or outside measurements. Access to ocupied housing will be decided on day of site visit.

29
The deadline for requesting and confirming attendance.

Sept 8 by 10am MDT.

Please contact Sharon LaRosa 24 hrs prior to Sept. 9 if attending. If no vendors contact the CO, the site visit will be cancelled.

File details come from the government source that posted it. Updated .