Sol_140P1426Q0092_Amd_0003.pdf

PDF 203 KB Posted

Attached to
Residential Fencing at Dinosaur National Monument
Solicitation number
140P1426Q0092
Issued by

About this file

This is Amendment 0003 to Solicitation No. 140P1426Q0092, issued by the National Park Service (NPS), Intermountain Rockies MABO (Mammoth Supply Center), Yellowstone National Park, Wyoming. The amendment is effective July 8, 2026, and clarifies Question 6 regarding fence construction methodology for the Utah Residence Fencing Repair and Installation project at Dinosaur National Monument. The amendment provides specific guidance on the use of commercially manufactured pre-built fence panels versus stick-built construction across designated areas.

For Areas 4-7, commercially manufactured pre-built fence panels may be used given that exact locations of existing fence post holes are unknown and the fenced area will be reduced in size. For Areas 4-5 and 4-6, contractors must utilize existing fence post holes and existing fence panels where required, as the Statement of Work includes staining and repairing damaged or failing panels and posts, making stick-built construction the anticipated method to ensure compatibility with the existing fence layout. For Area 4-5, commercially manufactured pre-built panels may be used only if they align with existing post hole locations, accounting for an approximately 100-foot fence reduction. The period of performance is August 1, 2026, through October 31, 2026. All other terms and conditions of the original solicitation remain unchanged. Offerors must acknowledge receipt of this amendment prior to the solicitation closing date by completing the form or providing separate written communication referencing the solicitation and amendment numbers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Stacy Vallie

See continuation page

NPS, IMR - Northern Rockies MABO PO Box 168 Mammoth Supply Center / 22 Stable St Yellowstone NP WY 82190

PIR

140P1426Q0092

07/08/2026

06/22/2026

1 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140P1426Q0092/0003

PROJECT DESCRIPTION: Utah Residence Fencing

Repair and Installation at Dinosaur National

Monument

Amendment 0003 to Solicitation No.

140P1426Q0092 is hereby issued to clarify

Question 6 of Amendent 0003 regarding the use eof stick-built versus commercially manufactured pre-built fence panels and to provide the site visit participant list

(Attachment 5).

Areas 4-7: Commercially manufactured pre-built fence panels may be used. The exact locations of the existing fence post holes are unknown, and the fenced area will be reduced in size.

Areas 4-5 and 4-6: Contractors shall utilize the existing fence post holes and existing fence panels where required, as the Statement of Work includes staining and repairing damaged or failing fence panels and/or posts.

Accordingly, stick-built construction is anticipated to ensure compatibility with the existing fence layout.

Area 4-5: Commercially manufactured pre-built fence panels may be used only if they align with the existing post hole locations, taking into account the approximately 100-foot reduction in one section of the fence.

All other terms and conditions of Solicitation

No. 140P1426Q0092 remain unchanged.

END OF AMENDMENT 0003

Period of Performance: 08/01/2026 to

10/31/2026

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .