About this file

This document is an Amendment to a Request for Quotation (RFQ) for the removal and installation of a bat gate at the entrance of the Middle Cave in Timpanogos National Monument. The key details are:

The government is open to alternate gate designs that meet the safety and resource protection goals, and does not have a preference on the size or type of steel bars to be used. The vertical haul distance for materials is approximately 150 feet, and the approach to the cave entrance requires personnel to be in an industrial harness with crab claw tethers, a rappel device, and at least one ascender. The current gate is constructed with 4" angle iron bars. No additional details are provided about the required products or services, response dates, award dates, pricing terms, set asides, or other salient information.

View the file

Other files for this federal contract opportunity

Other files attached to Timpanogos National Monument - BAT GATE FOR MIDDLE, newest first.
File Type Posted
Sol_140P1424Q0038_Amd_0001.pdf PDF
B03_Wage_Determination_2015-5485_REV_22_Dated_12-25-2023_Utah_County_Utah.pdf PDF
Attachment_-_Timpanogos_Cave_Trail_Map.pdf PDF
Attachment_-_Timpanagos_Cave_System_Map___Previous_Gate_Designs.pdf PDF
B08_Attachment_-_SOW_-_TICA_Bat_Gate.docx DOCX document
Sol_140P1424Q0038.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 1 – 140P1424Q0038 – TICA Bat Gate Vendor Questions & Government Answers

1. Old gate design shows pins at every bar extending into the rock face, is this a requirement or are you open to alternate designs with less pins?

· We are open to alternate designs that meet the safety and resource protection goals of the project.

2. Does the Park have a preference on the size/type of steel bars used i.e., 2" square tube steel versus 4" angle iron bars with stiffeners?

· We do not have a preference.

3. What estimated distance will materials be hauled via rope vertically?

· The vertical haul distance is approximately 150 feet. The haul is not quite vertical, it runs up the rock chute at an angle. The materials may need to be hauled up in a sled or stretcher to reduce friction with the rock face. Equipment understanding of how to do this can be provided by the park.

4. Does the approach to the cave entrance require personnel to be roped up/vertically climb or is it a steep scramble?

· The approach to the cave entrance requires personnel to be in an industrial harness with crab claw tethers, a rappel device, and at least one ascender. The park can supply this equipment for a few people.

5. What type of steel is current gate constructed with? (Tube steel, angle, rebar)

· The current gate is constructed with 4” angle iron bars.