This statement of work outlines requirements for installing an Avaya IP Office VoIP telephone system at the Lyndon B Johnson National Historical Park in Texas. The National Park Service seeks a contractor to remove the existing phone system and install an Avaya IP Office with 18 desk phones, a conference phone, embedded voicemail, and associated hardware and software. The contractor must also provide training, warranty, and support services. The work must be completed within 90 days of award. Interested parties can view the site on July 26th by scheduling with the contact provided. The solicitation number for this opportunity is 140P1323Q0097.

View the file

Other files

File Type Posted
B09_QnA_0002.docx DOCX document
Sol_140P1323Q0097_Amd_0002.pdf PDF
Sol_140P1323Q0097_Amd_0001.pdf PDF
Sol_140P1323Q0097.pdf PDF
A15.pdf PDF
B03.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

for Lyndon B Johnson National Historical Park

This project will replace the phone system that serves Lyndon B Johnson National Historical Park (LYJO). This Statement of Work, issued by the National Park Service, is for the removal of existing and installation of a new telephone system which includes phones, associated hardware, software, programming, and maintenance support. This scope of work describes the minimum level of performance required by the National Park Service. Alternate designs and or equipment minimum required standards are not accepted unless agreed upon. All equipment must be new and unused as well as Trade Agreement Act (TAA) compliant (limits allowed countries of origin). All technicians performing the work must be certified by Avaya. *Connecting non-government devices to the government data network is strictly prohibited.

Description of Work

Install one, most current version, Avaya IP Office at Lyndon B Johnson National Historical Park – Ranch Unit, TX.

This will also include:

· Avaya IP Office

· 18 total Avaya J159 desk phone w/power supply

· Avaya Conference Phone B179

· Embedded voicemail + Essential Ed. Lic

· 1 Uninterrupted Power Supply (UPS) minimum one hour holdover time

· Rack Mount configuration

-Details are in the Requirements and Specification section 1.0

Period of Performance

Finish no later than 90 days after award.

Site Survey

Site visit will be available July 26th, at 9am CDT. Attendance is not required to submit a bid but is recommended. To schedule contact CO Sam Hyslop at samuel_hyslop@nps.gov 970-880-4482 -please schedule 24 hours in advance.

1.0 Requirements and Specification

1.1 Locations and Details

· Lyndon B Johnson National Historical Park (LYJO) - 1048 Park Road 49, Stonewall, TX 78671

· This phone system and phones serve the LBJ Ranch which is currently in the process of upgrading the phone lines with the telecom to PRI or SIP. Current analog as well as PRI or SIP must be applicable to the Avaya VoIP Telecom System

· This phone system and phones serve the following buildings on existing analog trunks:

· 9 lines dedicated to Fire Alarm

· 1 line dedicated to Fax

· Base Items and Service

· Install a new Avaya VoIP Telecom System with associated hardware and software for the voice network at LYJO.

· IP Office equipment will fit in provided 19” equipment racks or mounted in the same location as the replaced phone system.

· Ensure proper grounding based on manufacturer specifications.

· The system must be IPV6 compliant or have the capability to become compliant in the future based on manufacturer plans, specifications, business roadmaps, etc.

· This system must have the latest version of software and all devices must be compatible with the proposed Avaya IP Office.

· The system must support voice, caller ID, and fax. Each IP Office will include a analog card.

· Allow voice to use one vLAN and data on another vLAN. The IP Offices shall have at least 2 Network Interface Cards.

· The POP/demarcation point is located just outside the Klein Shop

· Aruba switches will be configured by NPS WAN Manager.

· The VoIP Telephone switch's IP address and subnet mask is to be determined, one for voice and the other for the park’s 10-dot data range.

· Vendor will work with NPS IT for any Aruba data switch programing (Contact WAN Manager and Telecom Manager at the Regional Office).

· VoIP phone sets will use dynamic IP assignment from the respective phone system. IP ranges will be provided by the government. System must have static IP addresses.

· All licenses must reside on the telecom switch.

· System must have the capability for remote system maintenance using a secure meeting and no direct access. No contractor IT equipment can be attached to the Government network.

· Provide a UPS to support minimum of 1 hour runtime

· Remove all old phone system and components and neatly pack for proper electronics disposal by LYJO staff.

· The vendor must provide all settings with complete / correct syntax needed to route the VoIP traffic between all the sites using the Enterprise Switch Network (ESN). All sets regardless of data connection must function as designed. All features listed must be active and fully operational before project close out.

· Telephone sets will act as a network switch. Phone sets connect to the wall Ethernet port and the computer will connect to the phone.

· Connect phone systems to relevant circuits.

· Coordinate with the local exchange carrier to ensure all subscriber lines are functional as well as users having caller ID (if no cost) and E911. Must test and verify.

· Test and verify functionality of existing Private Business Lines (4) for alarm systems and fax. Replacing/installing new cabling if current wiring is missing or damaged.

· Provide and install all desk phones plus voicemail in the specific locations determined by LYJO Staff. Contractor to provide patch cable with each phone (at least CAT 5e).

· Replace current auto attendants at each site with new auto attendants (per site), program the auto-attendants, and provide training to LYJO administrators on how to change / program auto attendant.

· Enable (3) digit extension dialing on all internal VoIP sets at LYJO.

· Program all extensions into the system and assign to users as determined by LYJO. Data will be provided to awardee.

· Test all phones to ensure operability, includes but not limited to; out dialing, voicemail access, call forwarding, test that calls to the primary number at each site, followed by entering an extension number, rings to the appropriate extension and office.

· Resolve potential voice quality issues such as echo, static, etc.

· Vendor is responsible for cleaning the work area at the end of each day and after the project.

· At the completion of the project the vendor is responsible for restoring all walls, floors, and other surfaces to the condition they were in prior to the commencement of work activity.

· Produce and provide as-built logical diagram for the voice network.

· Provide on-site, instructor lead, user overview training about basic set operation. Training will be conducted in a room to be provided by the government. Vendor must perform 20 - 30 minute long, user training sessions with up to (10) participants in each session. The training must include hands on use time for the users. The users should be taught how to use the features associated with the set and system. A visual aid or online tutorial does not substitute for instructor led training.

· Provide in-person, on-site, instructor led, in-depth administrator training in a room to be provided by the government. Vendor must perform (1) 1 hour long or as needed, in-depth system administrator training sessions with up to (3) attendees. This session must cover everything covered in the user training in addition to how to perform all system administration functions. A visual aid or online tutorial does not substitute for instructor led training.

· One-year Warranty on the installation for all equipment and all contractor performed work.

· One-year phone service and support; Next Business Day (NBD) per hour on-site charge, site trip charge, same day phone support charge; this would be to support the LYJO system.

1.2 Option Line Item

Option for 4-year service and to include on-site and remote repair help with NBD parts with Avaya Software upgrades. Does not include moves, adds and changes (MAC’s) or trouble caused by Network Provider.

1.3 Applicable Standards and Regulations

The Contractor shall conform to and be compliant with all applicable Federal Communications Commission (FCC) rules and regulations, local construction codes, and established industry standards. The Contractor shall also be compliant with NPS Structured Cable Plant Standard, April 22, 2021. The standards shall be applied during the engineering, fabrication, assembly, wiring, installation, testing, operation, maintenance, and management of the system(s) or service(s). If a conflict arises between standards, the contractor shall submit written requests for clarification citing the specific particulars to the Contracting Officer. The Contracting Officer will respond with written direction.

1.4 Site Access

· Contractor will coordinate with LYJO staff on all access to buildings and offices.

· The contractor shall restore walls, ceilings, and floors if they become damaged by contractor or sub-contractor employees. The restoration must bring the worksite to the appearance and condition that existed prior to the work being performed.

· The contractor is also responsible for cleanup, removal, and disposal of any debris associated with their installation of equipment and restoration of the building if damaged.

1.5 Deliverables

Inspection and Acceptance: All equipment must be new and have original warranty. In the absence of other agreements negotiated with respect to time provided for government review, deliverables will be inspected by an onsite inspector and reported to COR and CO.

1.6 Contract Type

This is a firm fixed price contract.

1.7 Service Interruptions

All service interruptions must be coordinated with LYJO staff approved by COR and the time-of-service interruption must be as short as possible. The NPS shall be notified as far in advance as possible of any scheduled interruptions by the contractor, but no less than 24 hours prior to the planned interruption. The contractor shall inform the government as soon as it is known that there may be an occurrence, which may result in an interruption of service.

1.8 Invoices

Invoices must show item detail and work order references. Invoices without correct work order reference or inadequate line-item detail will be returned as improper invoices. Invoicing shall be submitted through the federal government’s IPP platform at ipp.gov

1.9 Points of Contact

NOTE: The contractor shall immediately bring problems or potential problems affecting performance to the attention of the Contracting Officer, COR, and Project Manager.

Problems affecting a particular action should be resolved prior to starting the specific task. Verbal reports must be followed up with written reports when directed by the COR, or Contracting Officer

Onsite (LYJO)

Justin Clark, IT Specialist Justin_L_clark@nps.gov 830-868-7128 x242 -O 830-330-2645 -C

Tasha Hernandez, Administrative Officer tasha_hernandez@nps.gov 830-868-7128 Ext. 228 -O 830-613-7721 - M

Contracting Officer’s Representative (COR)

TBD

NPS Contracting Officer Sam Hyslop – samuel_hyslop@nps.gov 970-880-4482

Administrative Section

2.0 Special terms and conditions

2.1 Security

The work itself is unclassified. However, work on this contract is in government facilities and involves data network / telecom equipment. Therefore, the government retains the right to request removal of contractor personnel, regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interests of the government. The reason for removal will be fully documented in writing by the Contracting Officer. When and if such removal occurs, the contractor will, within 5 working days, assign qualified personnel to any vacancy(ies) thus created. The government also retains the right to require an escort of contractor employees within sensitive / classified areas if the government deems it is required. The contractor will be notified in writing in the event this is required.

2.2 Key Personnel

The contractor shall identify key personnel in the technical proposal regardless of the type of task. It is required that personnel certified by the manufacturer perform the work, and copies of their certifications must be submitted to the government with the vendor proposal. Key personnel may not be added nor removed from the task without express approval of the Contracting Officer.

2.3 Government Furnished Items

· The government will provide the following:

· The existing physical space needed and structures.

· Information needed to perform the work to include but not limited to extension ranges, IP addresses, etc.