Amendment_2_Attachment_0002.pdf
PDF 122 KB Posted
- Attached to
- 140P1321R0006 SF SABER Request for Proposals
- Solicitation number
- 140P1321R0006
About this file
This document contains questions and answers regarding an amendment to a request for proposal for roof replacement services. The amendment specifies that all existing rigid insulation must be replaced with 6 inches of new polyisocyanurate rigid insulation, ensuring a minimum roof slope of 2%. The related federal contract opportunity is a simplified acquisition of basic engineering requirements covering services for National Park Service units in Oklahoma, New Mexico, and Texas. The solicitation is for roof demolition and installation of a new roof system meeting the insulation and slope specifications outlined in the amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IMG_0298_0002.jpg | JPG image | |
| Sol_140P1321R0006_Amd_0002.pdf | ||
| IMG_0295_0002.jpg | JPG image | |
| IMG_0299_0002.jpg | JPG image | |
| Sol_140P1321R0006_Amd_0001.pdf | ||
| SF_SABER_Amendment_1_0001.pdf | ||
| B08_140P1321R0006_Att_C_Seed_Task_Order.pdf | ||
| B08_140P1321R0006_Att_B-_Past_Performance_Survey.docx | DOCX document | |
| B08_140P1321R0006_Att_D_Otero_County_Wage_Determination.pdf | ||
| B08_140P1321R0006_Att_E_MAP.pdf | ||
| B08_140P1321R0006__Att_A_-_Guide_Specifications_Final.pdf | ||
| Sol_140P1321R0006.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P1321R0006 Amendment 2 Q&A
Questions:
1. Roof Demolition Note #2 in drawing A-101 calls to replace existing insulation as needed. However, existing roof condition is unknown. Existing rigid insulation could be completely damaged requiring removal down to deck, or it could be 100% reusable. Is it acceptable to exclude this item from the base bid and include an add alternate per SF price?
2. New Roofing System Note #1 in drawing A-101 calls for “Increase Insulation to R-30”. Existing rigid insulation thickness is unknown. Is it acceptable to exclude this item from the base bid and include an add alternate per SF per inch price?
3. New Roofing System Note #2 in drawing A-101 calls for “Increase minimum slope to 2%”, which requires additional tapered insulation. However, existing slope is unknown. Is it correct to exclude this item from the base bid and include an add alternate per SF per slope % price?
Answer:
Replace all existing rigid insulation with 6 inches of new Polyisocyanurate rigid insulation and with a minimum slope of 2%.