This is a Questions and Answers document related to the Washita Battlefield National Historic Site life/safety systems replacement project. The Q&A addresses technical clarifications regarding drawings, existing infrastructure, cable management, and system compatibility for the fire alarm, intrusion alarm, CCTV, and door access control system replacement initiative.
Key technical clarifications include: drawing formats are limited to those already provided with no additional .dwg files available; the NVR plywood shelf location can accommodate a small wall-mount rack; double door configuration drawings are not available as the planned configuration matches existing lower-level doors; all available security-related construction drawings have been provided; existing intrusion devices include wireless components; cables may be reused where possible with no known issues identified; exterior cables may be surface-mounted if color-matched and neatly aligned with building structure, while interior cables must be concealed; and the existing Lenel door access control system is obsolete and requires complete replacement/upgrade, with system ID and spare license information unavailable. This document provides essential technical guidance to potential contractors regarding design constraints, existing infrastructure conditions, and specific requirements for the systems replacement work at this Department of the Interior National Park Service facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1226Q0018_Amd_0003.pdf | ||
| Atch_10_FAR_Clause_52_222-90_0002.docx | DOCX document | |
| Sol_140P1226Q0018_Amd_0002.pdf | ||
| Atch_6_Washita_Battlefield_Center_FA_Inspection_-_8_25_25-Redacted_0001.pdf | ||
| Atch_7_Site_Visit_Sign_In_0001.pdf | ||
| Atch_5_Questions_and_Answers_0001.docx | DOCX document | |
| Atch_9_Motion_and_Glass_Zones_0001.pdf | ||
| Sol_140P1226Q0018_Amd_0001.pdf | ||
| Atch_8_WABA_VC_Drawings_0001.pdf | ||
| Atch_3_Price_Schedule.docx | DOCX document | |
| Sol_140P1226Q0018.pdf | ||
| Atch_1_PWS.pdf | ||
| Atch_2_Technical-Experience_Questionnaire.xls | XLS spreadsheet | |
| Atch_4_DOL_WD_2015-5327__Rev_29.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
57. Can the DOI provide .dwg base files for submittal and record drawings?
Drawings provided. No other format is available.
58. The provided photo shows the NVR on a plywood shelf; is there space in that location for a small wall-mount rack?
Yes.
59. Are any drawings available for the planned double door configuration?
No. The planned double door configuration is the same as the double doors on the lower level of the building.
60. Are any drawings available from the construction of the facility or related to security?
All available drawings have been provided.
61. Are any of the existing intrusion devices wireless?
Yes.
62. Are all cables required to be replaced or upgraded?
Cables may be reused where possible.
63. Which, if any, cables can be reused?
Cables may be reused where possible.
64. Are there any known issues with the existing cables?
No know issues.
65. Is it acceptable to surface mount cables across the ceiling area if they match the color and run neatly parallel to the building structure?
Exterior cables can be surface mount. Interior cables must be out of view.
66. Please provide the System ID for Lenel or confirm the number of spare licenses available on the Lenel head-end so we can include the correct licensing for the doors at this facility.
Unknown, the door access control system is obsolete and needs to be replaced/upgraded.