Atch_9_Price_Schedule.pdf
PDF 215 KB Posted
- Attached to
- CANY-REPLACE PV BATTERIES AT ISKY MAZE Federal contract opportunity
- Solicitation number
- 140P1225Q0048
About this file
This document is a Contract Bid Schedule for Canyonlands National Park's Maze District in Hans Flat, Utah, detailing a photovoltaic battery replacement project. The bid schedule outlines six line items for a comprehensive battery system replacement, including general requirements, removal of existing batteries, delivery of new batteries, purchase of 72 new 2V Flooded Lead Acid Batteries, installation, and acceptance testing. The contract allows for "All Items or None" bidding, with each line item priced separately and a grand total to be calculated, providing potential contractors with a clear breakdown of expected costs and scope of work for replacing the photovoltaic system batteries at the remote national park location.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1225Q0048_Amd_0001.pdf | ||
| Atch_1_Maze_PV_Sign_in_Sheet_0001.pdf | ||
| Atch_2_Questions_and_Answers_0001.pdf | ||
| Atch_2_SOW.pdf | ||
| Sol_140P1225Q0048.pdf | ||
| Atch_3_Battery_Technical_Manual.pdf | ||
| Atch_4_Batteries_images.pdf | ||
| Atch_5_PV_Bldg_Battery_Layout.pdf | ||
| Atch_6_Specs_-_Cable_minimum_bending_radii.pdf | ||
| Atch_10_DOL_WD_2015-5497.pdf | ||
| Atch_7_Vicinity_Map.pdf | ||
| Atch_8_Technical-Experience_Questionnaire.xls | XLS spreadsheet | |
| Atch_1_CAAC_Ltr_2025-02_Supplement_1.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CANYONLANDS NATIONAL PARK
REPLACE MAZE PHOTOVOLTAIC BATTERIES
PMIS 338386
P a g e | 1
Supply/Install Batteries for Photovoltaic System
CANYONLANDS NATIONAL PARK
MAZE DISTRICT
HANS FLAT, UT
CONTRACT BID SCHEDULE
All Items or None
ITEM UNIT QTY PRICE TOTAL
LS 1 $_______ $___________
LS 1 $_______ $___________
LS 1 $_______ $___________
EA 72 $_______ $___________
LS 1 $_______ $___________
LS 1 $_______ $___________
1. General Requirements (per diem, mobilization, etc.)
2. Removal of Existing Batteries (disassembly, freight)
3. Delivery of New Batteries (shipping)
4. 2V Flooded Lead Acid Batteries (cost of new batteries less rebate from recycling old batteries)
5. Installation of New Batteries (labor, connection materials)
6. Acceptance testing (labor, equipment, report)
GRAND TOTAL $___________
File details come from the government source that posted it. Updated .