Atch_2_SOW.pdf
PDF 388 KB Posted
- Attached to
- CANY-REPLACE PV BATTERIES AT ISKY MAZE Federal contract opportunity
- Solicitation number
- 140P1225Q0048
About this file
This document is a Statement of Work (SOW) for replacing photovoltaic batteries at the Maze District of Canyonlands National Park. The project requires a contractor to supply, install, and recycle 72 new 2-volt flooded lead acid batteries for an off-grid photovoltaic system that provides electrical service to the headquarters. Key requirements include a minimum of seven years of experience in battery testing or PV installation, specific battery performance characteristics (1,541 amp hours at 20 hours), and a 12-month full replacement warranty with 48 months pro-rated coverage.
The project involves removing existing batteries, transporting them to a certified recycler, and installing new batteries with precise specifications. The work site is located in a remote area of Utah, with challenging access involving 45 miles of dirt road. Contractors must provide detailed safety plans, personal protective equipment, and emergency medical training for crew members. The installation period is 140 calendar days, with a specific 14-day window for battery replacement, and acceptance testing to be conducted 6-9 months after installation. Specialized equipment and careful handling are required due to the technical and safety complexities of battery replacement in this off-grid photovoltaic system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1225Q0048_Amd_0001.pdf | ||
| Atch_1_Maze_PV_Sign_in_Sheet_0001.pdf | ||
| Atch_2_Questions_and_Answers_0001.pdf | ||
| Atch_7_Vicinity_Map.pdf | ||
| Atch_8_Technical-Experience_Questionnaire.xls | XLS spreadsheet | |
| Atch_9_Price_Schedule.pdf | ||
| Sol_140P1225Q0048.pdf | ||
| Atch_3_Battery_Technical_Manual.pdf | ||
| Atch_4_Batteries_images.pdf | ||
| Atch_5_PV_Bldg_Battery_Layout.pdf | ||
| Atch_6_Specs_-_Cable_minimum_bending_radii.pdf | ||
| Atch_10_DOL_WD_2015-5497.pdf | ||
| Atch_1_CAAC_Ltr_2025-02_Supplement_1.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CANYONLANDS NATIONAL PARK PMIS 338386
REPLACE MAZE PHOTOVOLTAIC BATTERIES P a g e | 1
National Park Service Southeast Utah Group Canyonlands National Park
Statement of Work: Supply, Install and Recycle Batteries for Photovoltaic System at MAZE
Delivery Location: Maze District, Canyonlands National Park, Hans Flat, Utah
February 2025
PMIS: 338386
PROJECT SPECIFICATIONS
PART 1 GENERAL
1.1 DESCRIPTION AND REQUIREMENTS
A. Synopsis. Supply, install and recycle batteries for an off grid Photovoltaic (PV) System at Canyonlands National Park. The PV system in conjunction with backup diesel generators provides all electrical service at the headquarters for the Maze District. All 72 of the existing 72 (2 volt nominal) flooded lead acid batteries (Deka 1-M100-27) batteries are to be removed and recycled (approximately 227 pounds each). They are to be replaced with 72 (2 volt nominal) flooded lead acid batteries with a similar amp hour rating, maintenance and watering requirement. The new batteries shall provide a minimum of 1,541 amp hours (at 20 hours) per cell. The work of this contract will include disconnecting, loading, and transporting the existing batteries to a certified recycler. The work will also include delivery, unloading, installation, wiring, and acceptance testing of the new batteries. Attachments include pictures of existing conditions and vicinity map.
B. Qualifications. Due to the technical nature and safety concerns of working with PV batteries, which includes disconnecting and connecting the battery bank and load testing the batteries, the Contractor shall have a minimum of seven years of experience in the field of battery testing or PV experience related to battery installation and maintenance.
The on-site supervisor shall have at least two years of battery testing or PV experience related to battery installation and maintenance. Provide any other information on technical qualifications and training of the installation crew with the required submittal.
C. Delivery Location and Instructions: This remote battery work site is located in Canyonlands National Park, Maze District. To access the Maze District and Hans Flat Ranger Station from Moab go North on 191 for 30 miles and turn West onto Interstate I-
70. Take I-70 west from Green River 11 miles to the Hwy 24/Hanksville exit and drive south towards Hanksville. Approximately 29 miles down Hwy 24 you will see a large brown sign for Goblin Valley State Park which is a turn off to your right. Do not turn there! Approximately 1/2 mile past that turn off is a dirt road on your LEFT which you want to turn on to. There is a wooden sign as you make the turn that says Horseshoe Canyon and Hans Flat Ranger Station etc. so you will know you have the correct road.
Stay on the obvious main road until you reach a Y junction (25 miles) which will have a sign to turn right towards Hans Flat (left to Horseshoe Canyon). Stay on that main road which will take you directly to the Hans Flat Ranger Station. Travel time from Moab to the Maze is 3 hours with good road conditions and no trailer, the last 45 miles are on dirt road.
REPLACE MAZE PHOTOVOLTAIC BATTERIES P a g e | 2
D. The Contractor is required to provide all equipment for off-loading the batteries and moving the batteries. The Park will not provide any equipment. Deliveries will be accepted Monday through Thursday from 7:00 to 4:30. No deliveries will be accepted on Friday, Saturday, Sunday or Federal Holidays.
E. The period of performance for battery installation is 140 calendar days (20 weeks) from award. Included in the overall time is the installation phase. Due to the need to be expeditious in the installation phase, the period of performance is 14 calendar days (2 weeks) from the time the existing batteries are disconnected till the time the new batteries are installed and operating. To perform acceptance testing, a period of performance of 14 calendar days (2 weeks) will be allotted six to nine months after the batteries are installed.
F. Warranty. Minimum terms include a 12 month full replacement period, and limited 48 months pro-rated warranty.
G. Site Tour. All prospective Contractors are highly encouraged to visit the facilities. There will not be a formal date set for a site tour, however interested parties can visit the site with appointment, at any time up to two weeks before the bid due date. The Contractor must set up an appointment with on site maintenance staff, John Rhoades at 435-260-9635 to visit the site.
H. Special Battery Delivery Requirements. The Contractor is required to provide a fork lift or other piece of equipment to off load and move all batteries. The Park will not provide any equipment for moving batteries. The Contractor shall schedule with facility staff, John Rhoades at 435-260-9635 for delivery and inspection of the batteries. Designated Park personnel must inspect the batteries before offloading of the batteries can begin. If upon inspection of the truck and batteries reveals that the batteries are not adequately secured, they are tipped over, they are banged up, or they are damaged in any way the Park will record the serial numbers of all batteries in the delivery and refuse acceptance of all batteries. The Contractor shall comply with Hazardous Materials cleanup procedures when dealing with any damaged batteries. The Contractor shall provide all new batteries, re-furbishing of the damaged batteries will not be accepted. The new battery delivery will again be inspected for the same requirements.
I. Battery Recycling. The existing Park batteries shall be recycled. The recycling of the batteries must be documented via chain of custody. The Contractor shall submit with the bid proposal their plans for battery recycling, including the name and any certifications of the proposed recycler. The recycler must be a recycling facility authorized by the U.S.
Environmental Protection Agency, or to a battery manufacturer for delivery to a secondary lead smelter.
J. Battery Layout. It is essential that a battery layout plan be established to ensure the batteries can fit in the existing building. Pictures of the existing battery layout is provided as an appendix, dimensions of the space are detailed below:
o PV Room working floor space is 216 inches x 124 inches.
o Battery trays are 90 inches by 26 inches o Total footprint of the three rows of batteries is 140 by 90 inches
REPLACE MAZE PHOTOVOLTAIC BATTERIES P a g e | 3
The Contractor shall submit their proposed battery layout with critical dimensions shown with the bid proposal. At a minimum the battery layout shall maintain a three foot walkway to allow for maintenance, and the layout shall meet the requirements of the National Electric Code (NEC) with emphasis on articles 480 and 690 for battery based PV installations. Chosen battery connection must meet code recommended geometry and cable bending requirements (also see attachment 5 but contractor to verify).
K. Battery Interconnects and Leads. The Contractor is responsible for all labor and material for connecting the batteries together, and all wiring and connections up to the J-boxes in the battery room. The contractor is responsible for providing all new battery interconnects and battery terminal covers with the installation. Stainless steel hardware is required for all bolted connections. The existing battery leads are defined as the cabling running from the batteries to the J-box in the battery room and are 4/0 DLO cables shown on the as built drawings. All battery leads are to be replaced with a minimum of two, parallel 1/0X-flex cable or equal. DLO (diesel locomotive) cable or welding cables are not an acceptable equal. The new battery leads shall be rated for 90°C. All battery cables and leads must have properly rated heavy duty lugs compatible with fine strand, flexible battery cable. The Contractor shall provide calculations in their submittal showing that the proposed leads, meet the amperage and all other requirements necessary for the proposed batteries. These calculations shall include derating for multiple conductors in the raceway as well as temperature derate on the conductors per NEC 310.15(B)(3)(a) & 310.15(B)(2)(a). Voltage drop on the inverter to battery cables shall be clearly shown in the calculations and shall not exceed 2%. The Contractor shall submit complete information showing how the batteries are to be connected including: parts, wires, bolts, bolt torque information, and any other information necessary for the complete wiring of the batteries. This submittal shall be included with the bid proposal.
L. Battery Containment. The Contractor shall remove and legally dispose, outside of the Park, the existing battery containment. The Contractor shall supply and install a new containment system for the new batteries. The containment system must have a
The Contractor shall submit cut sheets and general information on the containment system they are proposing with the bid proposal.
M. Acceptance Testing. Follow applicable Battery Council International (BCI) or ANSI/
NETA MTS standards for the determination of capacity of lead-acid industrial storage batteries for photovoltaic/ deep cycle applications. PART 3 EXECUTION, 3.2 ACCEPTANCE TESTING, for specific requirements on testing for this specification.
1.2 SUBMITTALS
REPLACE MAZE PHOTOVOLTAIC BATTERIES P a g e | 4
A. Submittals. Submit electronic cut sheets and required documentation in PDF format. The following submittal list is provided as an aid, if a submittal is required in the specifications but not on this list, it is still required.
1. General Plan. Brief description of work to be performed, number of employees on the job, and timeline. Submit with the bid proposal.
2. Qualifications. Provide documentation on meeting the required seven years and other pertinent information on qualifications. Submit with the bid proposal.
3. Battery Specifications Cut Sheet. Submit with bid proposal
4. Battery Warranty. Submit with bid proposal
5. Battery Recycling. Provide documentation on recycler. Submit with bid proposal
6. Battery Room Layout. Provide detailed drawing of battery configuration. Submit with bid proposal
7. Battery Interconnects and Leads. Provide documentation and calculations on all connections from the batteries to the J-box. Submit with bid proposal
8. Battery Containment System. Provide details. Submit with bid proposal
9. Safety Plan. Submit within two weeks after award
10. Acceptance Testing. Provide complete report within one week after testing
3 PROJECT CONDITIONS
A. Staging Areas. The Contractor can stage equipment at the battery/PV building and yard.
The Park will provide for covered and heated space for temporary storage of the batteries.
B. Work days and hours. The work shall be performed from Monday through Friday from
7:00 am until 5:30 pm. No work is to be performed on Federal Holidays, or outside the set work hours without the approval of the Contracting Officers Representative (COR).
C. Lodging. Due to the remote location, the Park will supply a trailer pad for the Contractor to bring their housing trailer onsite. The Park will supply all power and utilities to the Contractor if they decide to utilize this option.
D. Phone Service. Cell phone coverage is unavailable. The Contractor is allowed to use
Park phones for business, and limited personal usage.
E. Crew Size. Due to safety concerns the minimum crew size is two people.
F. Trash. The Contractor shall pick up and dispose of all trash and debris from the work of this contract and discard outside of the Park in a legal manner.
G. Site Power during Installation. During the battery installation the Park will run on diesel power. The Contractor shall coordinate with John Rhoades to coordinate the switch over from PV to diesel power to begin work. The Contractor shall ensure that complete shut off of power to the batteries has been accomplished before beginning work. The Contractor shall implement lock out - tag out procedures. Once the installation phase begins and the Park is running on diesel generators, it is essential that the Contractor remain on the job until the installation of the new batteries is completed. The maximum time allowed for the installation phase is 21 calendar days. Acceptance testing will allow an additional 14 calendar days of contract time to be added 6 to 9 months after the initial battery installation.
REPLACE MAZE PHOTOVOLTAIC BATTERIES P a g e | 5
N. Road Conditions As noted in the project description the last 45 miles are on dirt road, the condition of this road varies with the season/ weather and road maintenance intervals.
It is generally recommended to traverse this road with heavy vehicles before the monsoon season (June/July) or during winter for best conditions though this can vary and is periodically impassable and/or exhibits wash-boarding. A site visit is encouraged.
Contact John Rhoades at 435-260-9635 for site conditions.
H. Pre-service Meeting. Prior to or at the beginning of on-site work a pre-service meeting will be held. The meeting will be held virtually. The Contractor's foreman shall attend. The foreman shall bring to the meeting and have read a copy of these specifications and be knowledgeable about this contract, the ensuing work, the safety plan and be prepared to answer questions. Topics of discussion will also include Park rules and regulations, labor standards, paperwork requirements for payment and other job specific requirements.
PART 2 PRODUCTS
2.1 BATTERY REQUIREMENTS
A. Salient Features
1. Type: Flooded lead acid battery made specifically for renewable energy storage.
2. Cycle Type: Heavy duty deep cycle battery.
3. Voltage: 2 volt nominal.
4. Amp hour rating minimum: 1,541 amps at 20 hours at 1.75 volts per cell, at 77°F.
5. Expected life minimum:
a. 1,500 cycles at 80% depth of discharge or better.
b. 2,750 cycles at 50% depth of discharge or better.
c. 4,000 cycles at 20% depth of discharge or better.
6. Safety Venting Caps: Batteries shall be provided with safety venting caps which include flame arrestors.
7. Manufacture Certification: ISO 9001
B. Approved product.
1. Deka battery model, 1-M100-27, 2 Volt, 1241 amp-hours @ 6-hour rating, 1,579 Ah
@ 24-hour rating.
2. Other batteries meeting the salient features may be submitted for approval as an equal.
C. Operational Features
1. Battery must meet or exceed the recommended watering time and usage interval of approved product; no product with a higher frequency watering requirements will be approved due to operational and staffing limitations.
PART 3 EXECUTION
3.1 SAFETY
REPLACE MAZE PHOTOVOLTAIC BATTERIES P a g e | 6
A. Warning. Batteries are potentially dangerous and proper precautions must be observed in all battery handling and maintenance. Work on batteries shall be performed only with proper tools and shall utilize the protective equipment listed. Battery work shall be performed by personnel knowledgeable with PV batteries and trained in the safety precautions involved.
B. Protective Equipment. The following protective equipment shall be worn by personnel who perform battery work, or have these items on-site:
1. Goggles and face shields
2. Acid resistant gloves
3. Protective aprons
4. Have availability to portable or stationary water facilities for rinsing eyes and skin in case of contact with electrolyte. This requirement is fulfilled with on-site facilities
5. Bicarbonate of soda solution mixed 100 grams bicarbonate of soda to 1 liter of water, to neutralize acid spillage.
6. Class C fire extinguisher 20 pound minimum, or manufacturer recommended extinguisher.
7. Adequately insulated tools
C. Precautions. The following protective procedures shall be observed during this work:
1. Use caution when working on batteries since they represent a shock hazard.
2. Prohibit smoking and open flames, and avoid activities that increase the chances of arcing in the immediate vicinity of the battery.
3. Verify that the acceptance test equipment leads are clean, in good condition, and connected with sufficient length of cable to minimize the risk of accidental arcing in the vicinity of the battery.
4. Verify that all connections to acceptance test equipment include appropriate short-circuit protection.
5. Verify that the battery area ventilation is operating per its design.
6. Verify unobstructed egress from the battery area.
7. Do not wear metallic jewelry while working on the batteries.
8. Neutralize static buildup just before working on the battery by contacting the nearest effectively grounded surface.
9. Verify that the battery monitoring system is operational.
10. Utilize insulated tools where appropriate.
D. Safety Plan Submittal. Within two weeks after award, submit for acceptance an accident prevention program. The COR will review the proposed program for compliance with the requirements of these specifications. Under no circumstances is onsite work allowed to be performed until this program has been reviewed. THE PLAN SHALL
SPECIFICALLY ADDRESS THE SIX ITEMS BELOW, LISTED AND
NUMBERED IN THE SAME ORDER. ALL OTHER SAFETY PLANS WILL BE
REJECTED!!!! Ensure that all employees have access to a copy of this plan on-site.
1. Name of responsible on-site supervisor to carry out the safety program.
2. Local Contact Information. Provide a list, which includes telephone numbers and addresses, of the nearest: ambulance, physician, hospital, fire department, and police.
REPLACE MAZE PHOTOVOLTAIC BATTERIES P a g e | 7
3. Emergency Equipment. Provide a list of Contractor first aid kit locations. At a minimum the Contractor shall have at least one first aid kit onsite. Provide a list of Contractor fire extinguisher locations and type. At a minimum the Contractor shall have at least one 20 pound class C fire extinguisher.
4. Hazardous work phases and materials. Briefly outline each phase of the work, and identify any hazardous materials, associated hazards, and the methods proposed to ensure protection of property and safety of the public, Park personnel, and the Contractor's employees. At a minimum address the following for this project: lock out tag out, handling and installing PV batteries.
5. Personal Protective Equipment (PPE). Provide a statement requiring the aforementioned PPE be worn by employees.
6. Crew Safety Training. Due to the remoteness of this job, each crew member will be required to have current emergency medical training. Training shall include first aid and CPR, and be at least an 8 hour course. Training shall be provided by the Red Cross, the American Heart Association or equivalent. OSHA-10 or 30 are also required for training for at least one person on the crew.
3.2 ACCEPTANCE TESTING
A. Acceptance testing shall be performed no sooner than six months after battery installation and no later than 9 months after battery installation.
B. The testing procedures will follow applicable Battery Council International (BCI) or
ANSI/ NETA MTS standards for the determination of capacity of lead-acid industrial storage batteries for photovoltaic/ deep cycle applications.
C. Document all testing results in a neat and organized manner and provide as a submittal.
D. Provide a final report summarizing the testing documentation and making recommendations on replacement of any of the new batteries. Submit within one week of completion of testing.
3.3 FINAL INSPECTION
A. Final Inspection. After all work is complete the Contractor shall schedule a final inspection with the COR. The Contractor shall provide at least three days advance notice for the final inspection. The final inspection shall occur Monday through Friday during normal work hours, 7 am 5:30 pm.
B. The Contractor shall provide two sets of operating and maintenance manuals at this time.
3.4 ATTACHMENTS
1. Vicinity Map
2. Existing Conditions within Battery Room (Images)
3. Battery Layout Map
4. Battery Council International Standards (contractor to confirm current standards)
5. Cable Bending Radii
REPLACE MAZE PHOTOVOLTAIC BATTERIES P a g e | 8
PART 4 MEASUREMENT AND PAYMENT
A. Measurement and payment will be made according to the price schedule.