Atch_4_Batteries_images.pdf

PDF 2 MB Posted

Attached to
CANY-REPLACE PV BATTERIES AT ISKY MAZE
Solicitation number
140P1225Q0048
Issued by

About this file

These images depict multiple stacks of black Solar brand batteries stored on yellow pallets in an indoor facility. The batteries appear to be part of an off-grid photovoltaic (PV) system battery installation for Canyonlands National Park, as referenced in the associated federal contract opportunity (Solicitation Number: 140P1225Q0048). The batteries are arranged in dense, organized configurations with color-coded connectors (red, yellow, and green), and the room contains additional infrastructure like yellow piping, electrical conduits, air conditioning units, and cable connections. The systematic arrangement suggests these are replacement batteries for an existing solar power system, consistent with the contract opportunity's description of supplying and installing batteries for an off-the-grid PV system.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PV Battery 1

PV Battery 2
PV Battery 3
PV Battery 4

File details come from the government source that posted it. Updated .