About this file
This document is a Supply Specifications for a Bureau of Land Management (BLM) contract requirement for Wildlife Guzzler Water Storage Tank supplies to be delivered to various sites in New Mexico. The contractor must supply one Bid Item consisting of integrated wildlife guzzler tank systems with a storage capacity of 1,500 to 2,000 gallons, constructed of cross-linked polyethylene with ultraviolet inhibitors, featuring a domed top, dark coloring without need for painting, total weight not exceeding 1,000 pounds, dimensions not exceeding 8 feet in width and 16 feet in length, a sloped-ramp drinker requiring no float valves, a 16-inch manway with screw-on lid, and a 1.25 pre-installed overflow pipe adapter. Tank, drinker, and apron must function as one integrated structure requiring no plumbing. Total delivery comprises 12 tanks distributed across five locations: Crossbar Management Area in Amarillo, TX (2 tanks), Las Cruces District Office (2 tanks), Albuquerque District Office Ware Yard in Cuba, NM (2 tanks), Farmington District Office (2 tanks), and Middle Rio Grande Conservancy in Socorro, NM (4 tanks).
The contractor bears all responsibility and costs for transportation, freight, unloading, and equipment necessary for safe delivery and unloading at each destination. Delivery must occur between 8:30 a.m. and 3:30 p.m., Monday through Friday, excluding holidays, with notification to the Contracting Officer's Representative at least 10 working days prior to delivery. The contractor must provide equipment and methods to safely unload materials, though BLM personnel will assist if needed. One delivery location—Crossbar Management Area—requires access via unimproved roads accessible only by flatbed trucks, with coordination required from field office personnel. All transportation and freight costs must be included in the unit price bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140LL027Q0012.pdf | ||
| B04_-_Evaluation_Factors_-_NMSO_BOSS_tanks.pdf | ||
| A06_-_Price_Schedule_-_Wildlife_Guzzler_Tank.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026 NEW MEXICO STATE OFFICE
WILDLIFE GUZZLER TANK
SUPPLY SPECIFICATIONS
1. GENERAL
The Bureau of Land Management has a requirement for Wildlife Guzzler Water Storage Tank supplies to be delivered to various sites in New Mexico noted below. The materials furnished meet, at a minimum, the following requirements.
2. MATERIALS
Bid Item 1
WILDLIFE GUZZLER
PRODUCT SPEC SHEET
• Tank, drinker, and apron should be one structure when built, requiring no plumbing to function
• Tank will contain a full shape domed top
• Structure is constructed of cross-linked polyethylene with ultraviolet inhibitors
• Tank will have a storage capacity of 1500 – 2000 gallons
• Structure will be dark in color and will not require painting
• Total weight of the tank will not exceed 1,000 pounds
• Tank dimensions should not exceed 8 feet in width and 16 feet in length
• Tanks will contain a sloped-ramp drinker
• Tank will contain a 16” manway with a screw-on lid
• Drinker should require no float valves to function
• Tank will contain a 1.25 pre-installed overflow pipe adapter
3. DELIVERY NOTIFICATION
The Contractor shall notify the COR (Contracting Officer's Representative) at least 10 working days prior to delivery, to arrange for inspection and acceptance at destinations.
4. DELIVERY TIMES
Delivery shall be made between the hours of 8:30 a.m. and 3:30 p.m., Monday through Friday, holidays excluded.
5. RESPONSIBILITY FOR UNLOADING AT DESTINATIONS
a. The Contractor shall be responsible for unloading at destinations cited below and the contractor is responsible for the cost of unloading. Government-furnished unloading equipment will not be available at any delivery location. The Contractor shall provide the equipment and methods necessary to safely unload all materials. At least one BLM personnel will be at each delivery location to assist with unloading if needed.
b. The Contractor shall load and unload products in such a manner that protects them from damage until accepted by the Contracting Officer.
6. TRANSPORTATION/FREIGHT CHARGES
All costs of transportation/freight, from shipping points to the destinations shall be paid by the Contractor and included in his unit price quoted for the items.
7. DELIVERY DESTINATIONS (Some destinations are off of improved road surfaces in rural New Mexico, such as on caliche, gravel, dirt, or sand.)
All delivery locations are office warehouse yards or field offices. The sole exception is the Crossbar
Management Area delivery location, which requires access via unimproved roads. Flatbed trucks can access this location, and contractors shall ensure their vehicles and equipment are capable of safely reaching this location.
Crossbar Management Area (2 tanks)
Amarillo, TX
(35.419854, -101.947635)
*Delivery will require coordination with field office personnel to guide into the location
Las Cruces District Office (2 tanks)
1800 Marquess Street
Las Cruces, NM 88005
Albuquerque District Office Ware Yard (2 tanks)
28 Martinez Dr, Cuba, NM 87013
Farmington District Office (2 tanks)
6251 College Blvd
Farmington NM 87402
Middle Rio Grande Conservancy Socorro (4 tanks)
2401 NM-1,
Socorro, NM 87801
File details come from the government source that posted it. Updated .